EX-96.1 9 ex96-1.htm EX-96.1

 

Exhibit 96.1

 

 

S-K 1300 Technical Report Summary
Selebi Mines Copper-Nickel-Cobalt Project, Botswana

 

NexMetals Mining Corp.

1600-1021 West Hastings Street, 15th Floor,

Vancouver, British Columbia, V6E 0C3,

Canada

 

 

Prepared By:

The MSA Group (Pty) Ltd

Henley House, Greenacres Office Park

Cnr Victory and Rustenburg Roads

Victory Park, 2195, South Africa

 

Effective Date:16 October 2026
Report Date:16 November 2026

 

MSA Project No.:J5051

 

 

  

 

IMPORTANT NOTICE

 

This Technical Report Summary (TRS) has been prepared in accordance with Subpart 1300 of Regulation S-K promulgated by the United States Securities and Exchange Commission (SEC) (S-K 1300). The TRS is based on the same technical work, information, analyses, interpretations and effective date as the corresponding technical report prepared in accordance with Canada’s National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101), but has been presented and adapted, as required, to comply with the disclosure requirements, terminology and format prescribed under S-K 1300.

 

For clarity, this TRS is not intended to update, supersede or change the technical conclusions, assumptions, interpretations or effective date of the corresponding NI 43-101 technical report, except to the extent necessary to satisfy S-K 1300 requirements. References to NI 43-101, the NI 43-101 technical report or Canadian disclosure standards are included to identify the underlying source report and technical basis for this TRS. The mineral resource estimates and related technical disclosure in this TRS should be read and interpreted in accordance with S-K 1300.

 

The quality of information, conclusions and estimates contained in this TRS are consistent with the level of effort undertaken by The MSA Group (Pty) Ltd (MSA), South Africa, and the qualified persons, based on information available as at the effective date of the corresponding NI 43-101 technical report and this TRS, data supplied by NexMetals Mining Corp. (NexMetals) and other sources, and the assumptions, conditions, limitations and qualifications set out in this TRS. Differences between this TRS and the corresponding NI 43-101 technical report, if any, are intended to reflect differences between the applicable disclosure regimes and not a change in the underlying technical work or effective date.

 

Mineral resources disclosed in this TRS have been classified in accordance with S-K 1300 as inferred, indicated or measured mineral resources, as applicable. These classifications reflect the qualified person’s judgement regarding the level of geological evidence, sampling support, geological and grade or quality continuity, data spacing, data quality and confidence in the estimate. Under S-K 1300, inferred mineral resources have the lowest level of geological confidence, indicated mineral resources have sufficient confidence to allow application of modifying factors in sufficient detail to support mine planning and evaluation of economic viability, and measured mineral resources have the highest level of geological confidence and may support more detailed mine planning and evaluation. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

 

 

 

TABLE OF CONTENTS

 
1. Summary 1
1.1 Property Description 2
1.2 Land Tenure 2
1.3 History 2
1.4 Geological Setting, Mineralization and Deposits 3
1.5 Exploration 4
1.6 Sample Preparation, Analyses and Security 4
1.6.1 BCL drilling 4
1.6.2 PNRPL drilling 5
1.7 Mineral Processing and Metallurgical Testing 6
1.8 Data Verification 7
1.9 Mineral Resource Estimates 7
1.10 Conclusions 10
1.10.1 Geology and Mineral Resources 10
1.10.2 Mineral Processing 10
1.11 Recommendations 11
1.11.1 Forward Work Program 11
2. Introduction 13
2.1 Background, Terms of Reference and Purpose of the Report 13
2.2 Registrant for Whom the Technical Report Summary was Prepared 14
2.3 Corporate Structure 14
2.4 Principal Sources of Information 14
2.5 Qualifications, Experience and Independence 15
2.5.1 Qualified Persons 15
2.6 Site Visits and Scope of Personal Inspection 16
2.7 Effective Date 17
2.8 Units and Currency 17
2.9 Units of Measurement and Abbreviations 18
3. Reliance on INFORMATION PROVIDED BY THE REGISTRANT 20
4. Property Description and Location 21
4.1 Location 21

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: i

 

4.2 Mineral Tenure, Permitting, Rights and Agreements 22
4.2.1 Mineral Rights 23
4.2.2 Surface Rights 23
4.3 Environmental Liabilities 25
4.3.1 Environmental Permitting 25
4.4 Royalties and Encumbrances 25
4.5 Other Significant Factors and Risks 26
5. Accessibility, Climate, Local Resources, Infrastructure and Physiography 27
5.1 Accessibility 27
5.2 Climate 27
5.3 Local Resources and Infrastructure 28
5.3.1 Human Resources 28
5.3.2 Infrastructure, Power, Water and Supply 28
5.4 Physiography 30
5.4.1 Topography 30
5.4.2 Surface Water 30
5.4.3 Groundwater 30
5.4.4 Flora and Fauna 30
6. History 31
6.1 Prior and Current Ownership 31
6.2 Exploration and Development History 31
6.2.1 Early Exploration (1959-1990) 32
6.2.2 Exploration (2005 to 2012) 32
6.3 Past Production 33
7. Geological Setting and Mineralization 34
7.1 Regional Geology 34
7.2 Local Geology 35
7.3 Property Geology 37
7.4 Mineralization 40
7.4.1 Selebi Main 41
7.4.2 Selebi Central 42
7.4.3 Selebi North 42
8. Deposit Types 45
9. Exploration 47
9.1 Digitization of Existing Information 48

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: ii

 

9.2 Collar, Downhole, BHEM, Televiewer, and Physical Property Surveys 48
9.2.1 Collar Location (DGPS) 48
9.2.2 Downhole Reaming and Surveying (GYRO) 49
9.2.3 BHEM Surveys 49
9.2.4 Surface EM Surveys 51
9.2.5 Televiewer and Physical Property Surveys 51
9.3 Technical Studies 52
9.3.1 2022 Selebi Main Structural Study 52
9.3.2 2022 Selebi North Structural Study 53
9.3.3 2025 Selebi Mines Structural Study 53
9.3.4 Petrological Studies by Peter Lightfoot 53
9.3.5 Data Management and Drillhole Re-Logging 54
9.4 Exploration Potential 54
10. Drilling 56
10.1.1 Historical Drilling 57
10.1.2 Current Drilling 59
10.2 Historical Drilling and Handling Protocols 61
10.2.1 Surface Drilling 61
10.2.2 Underground Drilling and Channel Sampling 63
10.3 PNRPL Drilling and Handling Protocols 66
10.3.1 Surface Drilling 66
10.3.2 Underground Drilling 67
10.3.3 Core Processing Routines (Surface and Underground) 68
10.4 MSA.3 Core Processing Routines (Surface and Underground) 68 10.4 MSA QP Opinion on Drilling Campaigns at Selebi 69
10.5 Hydrogeology Data 70
10.6 Geotechnical Data 71
11. Sample Preparation, Analyses and Security 72
11.1 BCL Sample Preparation, Analysis, and Security 72
11.1.1 Sample Preparation and Analysis 72
11.1.2 Density Determination 72
11.1.3 Sample Security 73
11.1.4 QAQC Protocols 73
11.1.5 QAQC Results 74
11.2 PNRPL Sample Preparation, Analysis, and Security 76
11.2.1 Sample Preparation and Analysis 76
11.2.2 Density Determination 76
11.2.3 Sample Security 77
11.2.4 QAQC Protocols 77
11.2.5 QAQC Results 78
11.3 MSA QP opinion on Adequacy of the Sample Preparation, Security and Analytical Procedures 84

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: iii

 

12. Data Verification 85
12.1 Selebi Main 85
12.1.1 Drilling verification 85
12.1.2 Site visit verification by the MSA QP 88
12.1.3 Logging and sampling verification of historical records 90
12.2 Selebi North 90
12.2.1 Drilling verification 90
12.2.2 Site visit verification by the MSA QP 90
12.2.3 Logging and sampling verification of historical records 92
12.3 Summary and Opinion of the MSA QP on the Data Verification 92
13. Mineral Processing and Metallurgical Testing 93
13.1 Historical Metallurgical Testwork 93
13.2 Recent Testwork 94
13.2.1 2024/2025 XPS TESTWORK PROGRAM 94
13.2.2 Stark Ventures ore sorting program 105
13.2.3 2025 IMS Ore Sorting Program 106
13.2.4 2024/2025 Metso Testwork Program 107
13.2.5 2025/2026 Blue Coast Research Testwork Program 108
13.2.6 Metallurgical Estimate and Assumptions 120
13.3 Conclusions and QP Recommendations 121
14. Mineral Resource Estimation 122
14.1 Introduction 122
14.2 Mineral Resource Disclosure Basis 122
14.3 Selebi Main 122
14.3.1 Mineral Resource Estimation Database 122
14.3.2 Data Validation and Preparation 123
14.3.3 Mineralization Criteria 125
14.3.4 Geological Modelling and Estimation Domains 126
14.3.5 Statistical and Geostatistical Analysis 127
14.3.6 Core Recovery 129
14.3.7 Density 129
14.3.8 Moisture 129
14.3.9 Variography 129
14.3.10 Block Model and Grade Estimation 131
14.3.11 Block Model Validation 137
14.3.12 Mineral Resource Classification 140

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: iv

 

14.3.13 Assessment of Reasonable Prospects for Economic Extraction (RPEE) 142
14.3.14 Mineral Resource Statement 143
14.3.15 Grade Tonnage Curves 145
14.3.16 Comparison with Previous Estimates 146
14.3.17 Mineral Resource Uncertainty Discussion 147
14.3.18 MSA QP Opinion 149
14.4 Selebi North 149
14.4.1 Mineral Resource Estimation Database 149
14.4.2 Data Validation 150
14.4.3 Geological Modelling 154
14.4.4 Statistical Analysis 156
14.4.5 Core Recovery 161
14.4.6 Moisture 161
14.4.7 Variography 162
14.4.8 Block Model and Grade Estimation 163
14.4.9 Block Model Validation 166
14.4.10 Swath Plots 167
14.4.11 Visual Validation 170
14.4.12 Mineral Resource Classification 173
14.4.13 Assessment of Reasonable Prospects for Economic Extraction (RPEE) 175
14.4.14 Mineral Resource Statement 176
14.4.15 Grade Tonnage Curves 177
14.4.16 Comparison with Previous Estimates 179
14.4.17 Mineral Resource Uncertainty Discussion 180
14.4.18 MSA QP Opinion 181
15. Mineral Reserve Estimates 183
16. Mining Methods 184
17. Recovery Methods 185
18. Project Infrastructure 186
19. Market Studies and Contracts 187
20. Environmental Studies, Permitting and Social or Community Impact 188
21. Capital and Operating Costs 189
22. Economic Analysis 190
23. Adjacent Properties 191
24. Other Relevant Data and INformation 192
25. Interpretation and Conclusions 193
25.1 Geology and Mineral Resources 193
25.1.1 Mineral Resource Risk Factors 194
25.2 Mineral Processing 197
26. Recommendations 198
26.1.1 Forward Work Program 198
27. References 199
28. Date and Signature Page 201

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: v

 

LIST OF TABLES

 

Table 1-1 Selebi Mines Mineral Resource Estimates, October 16, 2026 9
Table 1-2 Forward work program – proposed budget 12
Table 2-1 Responsibilities of the Qualified Persons 16
Table 9-1 Summary of exploration activities 47
Table 10-1 Summary of drilling 56
Table 10-2 Summary of historical intercepts outside the MRE area 58
Table 10-3 Summary of 2025 intercepts in the 2 km gap between Selebi and Selebi North 60
Table 10-4 Summary of PNRPL intercepted mineralization at Selebi North outside MRE area 61
Table 11-1 Historical QAQC sample insertion rates 74
Table 11-2 QAQC sample statistics 78
Table 11-3 QAQC blanks performance summary - PNRPL samples at ALS 78
Table 11-4 QAQC - CRM performance summary PNRPL samples at ALS 79
Table 11-5 2025 Duplicates Statistics 81
Table 11-6 2025 Inter-laboratory duplicates statistics (ALS vs SGS) 82
Table 12-1 Comparison of BCL with PNRPL intercepts 86
Table 13-1 Summary of previous metallurgical testwork carried out by NexMetals 93
Table 13-2 Source of samples for the 2024 processing program 95
Table 13-3 Assay head grades: Selebi geometallurgical units 96
Table 13-4 Initial EPMA data 96
Table 13-5 Formulation of Master Composite 100
Table 13-6 Summary of Master Composite saleable copper concentrate testwork 101
Table 13-7 Cobalt in pentlandite by geometallurgical unit 103
Table 13-8 Summary of Master Composite saleable copper concentrate testwork 104
Table 13-9 Selebi Main sample description 106
Table 13-10 LCT-1: Projected metallurgy – based on cycles 4-6 112
Table 13-11 LCT-1: Projected metallurgy – based on cycles 4-6 114
Table 13-12 LCT-2: Projected metallurgical – based on cycles 4-6 115
Table 13-13 Master versus resource composite 115
Table 13-14 LCT-3: Projected metallurgical – based on cycles 4-6 116
Table 13-15 LCT-5: Projected metallurgical – based on cycles 3-5 118
Table 13-16 Metallurgical recovery assumptions – average of LCT-2 and LCT-3 119
Table 14-1 Database Summary 122
Table 14-2 Assay availability in final dataset 124
Table 14-3 NSR parameters (two concentrate option) 126
Table 14-4 Composited vs uncomposited statistics 127
Table 14-5 Global top-cap statistics 129
Table 14-6 Semivariogram rotation angles – Selebi Main 130
Table 14-7 Semivariogram parameters – Selebi Main 131
Table 14-8 Statistical comparison of block model and composite means 138
Table 14-9 NSR cut-off value parameters 142
Table 14-10 Selebi Main Mineral Resource Statement as of 28 September 2026 144
Table 14-11 Previous Selebi Main mineral resource estimate, SLR September 20, 2024 146
Table 14-12 Selebi North Data Summary 150
Table 14-13 Summary of assay data 153
Table 14-14 Summary of density data 153
Table 14-15 Drillhole sample grade and density statistics 156
Table 14-16 Mineralized domain sample grade statistics 156
Table 14-17 Mineralized sample grade statistics by estimation domain (ESTZON) 159
Table 14-18 Composited vs uncomposited statistics 161
Table 14-19 Global top-cap statistics 161
Table 14-20 Semivariogram rotation angles – Selebi North 161
Table 14-21 Semivariogram parameters 162
Table 14-22 Selebi North block model parameters 164
Table 14-23 Selebi North search volume orientation and distances 165
Table 14-24 Selebi North search volume sample selection parameters 165
Table 14-25 Global validation comparing declustered mean composite grades against block estimates 167
Table 14-26 Selebi North Mineral Resource Statement as of 16 October 2026 176
Table 14-27 Previous Selebi North mineral resource estimates, SLR September 20, 2024 180
Table 25-1 Selebi Mines Mineral Resource Estimates, October 16, 2026 193
Table 26-1 Forward work program – proposed budget 198

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: vi

 

LIST OF FIGURES

 

Figure 4-1 Location of Selebi Mines 21
Figure 4-2 Land tenure and surface rights 24
Figure 5-1 Average annual temperature profiles for the Project area 27
Figure 5-2 Average rainfall profile for the Project area 28
Figure 7-1 Regional geology 35
Figure 7-2 Local geology 36
Figure 7-3 Schematic map and cross section of the Selebi Phikwe Area 38
Figure 7-4 Property geology 39
Figure 7-5 Generalized Stratigraphic Column 40
Figure 7-6 Longitudinal sketch of the Selebi Deposit showing the fold plunge 41
Figure 7-7 Relative positions of Selebi North deposit areas 43
Figure 8-1 Ore genesis model for the Selebi deposits 46
Figure 9-1 BHEM surface map 50
Figure 9-2 Modelled BHEM plates 51
Figure 10-1 Drillhole collar locations 57
Figure 11-1 BCL CRM AMIS060 and AMIS060 control charts 75
Figure 11-2 CRM control charts for Ni (CRFM100, 101 & 102) 80
Figure 11-3 Scatter plots for coarse duplicate samples 81
Figure 11-4 Scatter plots for pulp duplicate samples (check assays) 83
Figure 12-1 Data clusters selected for bias test 86
Figure 12-2 Comparison between drillhole clusters selected for bias analysis between BCL and PNRPL intercepts 87
Figure 12-3 Comparison between BCL mother hole and deflection 88
Figure 12-4 Selebi Main site visit photos 89
Figure 12-5 Selebi North site visit photos 91
Figure 13-1 Bulk modal assembly: Selebi geometallurgical units 97
Figure 13-2 Nickel and copper deportment: Selebi geometallurgical units 98
Figure 13-3 Nickel and copper deportment: Selebi geometallurgical units 98
Figure 13-4 Copper and nickel and sulphur grade-recovery curves for geometallurgical units 99
Figure 13-5 Simplified selective flowsheet – Rev E 101
Figure 13-6 Effect of primary grind on copper and nickel flotation, Master Composite 102
Figure 13-7 Simplified bulk flowsheet 104
Figure 13-8 Selebi mill discharge 109
Figure 13-9 Copper grade versus recovery and nickel misplacement 110
Figure 13-10 Copper grade versus recovery 111
Figure 13-11 Copper grade versus recovery 112
Figure 13-12 LCT flowsheet progression 113
Figure 13-13 Nickel deportment and sulphide liberation 114
Figure 13-14 Individual geometallurgical unit Cu and Ni grade versus recovery 116
Figure 13-15 South Limb and N2 unit Cu grade versus recovery and Ni grade versus Cu rec 117

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: vii

 

Figure 14-1 Plan showing location of drillhole collar by drilling program 123
Figure 14-2 Ni-Co regression analysis 125
Figure 14-3 Mineralization domains relative to surveyed mined aras and drillhole data (view looking north) 127
Figure 14-4 Histogram of sample interval length 128
Figure 14-5 Ni grade semivariograms for Upper domain 130
Figure 14-6 Cu grade variograms for Upper domain 131
Figure 14-7 KNA block size analysis 132
Figure 14-8 KNA number of samples analysis 133
Figure 14-9 Upper Domain NSR (USD/t) distribution – plan view 134
Figure 14-10 Upper Domain Ni (%) distribution - plan view 134
Figure 14-11 Upper Domain True Thickness (m) distribution – plan view 135
Figure 14-12 Lower Domain NSR (USD/t) distribution – plan view 135
Figure 14-13 Lower Domain Ni (%) distribution: plan view 136
Figure 14-14 Lower Domain True Thickness (m) distribution – plan view 136
Figure 14-15 Block model NS cross section 137
Figure 14-16 Block model NE-SW cross section 137
Figure 14-17 Swath Plots (Upper domain) 139
Figure 14-18 Plan view of Upper domain classification 141
Figure 14-19 Plan view of Lower domain classification 142
Figure 14-20 Grade-Tonnage Curve: Upper domain Inferred 145
Figure 14-21 Grade-Tonnage Curve: Lower domain Inferred 146
Figure 14-22 Plan view of Selebi North drilling and channel data 152
Figure 14-23 Oblique view of Selebi North drilling and channel data looking northeast 152
Figure 14-24 Scatter plots showing regression analysis for Selebi North 154
Figure 14-25 Selebi North mineralization model (view looking north) 155
Figure 14-26 Selebi North mineralization model (plan view) 155
Figure 14-27 Histogram of sample nickel and copper grade 157
Figure 14-28 Selebi North mineralized samples sub-domains 158
Figure 14-29 Log probability plots for sub-domained mineralized samples 159
Figure 14-30 Histogram of interval length 160
Figure 14-31 Ni grade semivariogram models for ESTZON 1 162
Figure 14-32 Ni grade semivariogram models for ESTZON 2 163
Figure 14-33 Selebi North block model coloured on NSR 166
Figure 14-34 Swath plot validation for Ni – ESTZON 1 168
Figure 14-35 Swath plot validation for Ni – ESTZON 2 169
Figure 14-36 Plan view of Selebi North block model (ESTZON 1) – Elevation 23 mRL 170
Figure 14-37 Plan view of Selebi North block model (ESTZON 2) – Elevation 20 mRL 171
Figure 14-38 Block model three-dimensional view – Ni % 171
Figure 14-39 Block model three-dimensional view – Cu % 172
Figure 14-40 Block model three-dimensional view – Co % 172
Figure 14-41 Three-dimensional view of the block model coloured on classification 174
Figure 14-42 Three-dimensional view of the block model showing mined out and areas excluded from MRE – looking southwest 175
Figure 14-43 Grade-tonnage curve – Indicated Mineral Resources 178
Figure 14-44 Grade-tonnage curve – Inferred Mineral Resources 178
Figure 23-1 Location of Phikwe historical operations relative to Selebi Mines 191

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: viii

 

1.Summary

 

The MSA Group (Pty) Ltd. (MSA) was retained by NexMetals Mining Corp. (NexMetals, NEXM, or the Company) to prepare a Technical Report Summary (TRS) on the formerly producing Selebi Main and Selebi North copper-nickel-cobalt mines (collectively Selebi Mines or the Project), located in the Bobirwa District (formerly part of the Central District) of the Republic of Botswana (Botswana).

 

The purpose of this TRS is to document the updated Mineral Resource Estimates (MRE) for the Selebi Main and Selebi North deposits and the technical information available on the Project as of October 16, 2026. This TRS conforms to the United States Securities and Exchange Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300 of Regulation S-K, Disclosure by Registrants Engaged in Mining Operations (S-K 1300), and Item 601(b)(96) of Regulation S-K. The TRS and Mineral Resource Estimate has been prepared using diamond drilling sample assay data available up to and including September 22, 2026.

 

The conclusion, recommendations, and forward-looking statements made by Qualified Persons (QPs) are based on reasonable assumptions and results interpretations. Forward-looking statements cannot be relied upon to guarantee the Selebi Mine’s performance or outcomes and naturally include inherent risks and risks relating to the industry and NEXM.

 

NEXM is a Vancouver based exploration and development company previously known as Premium Resources Limited and Premium Nickel Resources Ltd. NEXM was formed in 2022 by the amalgamation of North American Nickel Inc. (TSX-V: NAN), a Vancouver based junior mining company formed in 1983, and Premium Nickel Resources Corp.(PNRC), a private corporation formed under the laws of the Province of Ontario. NEXM’s common shares trade on the TSX Venture Exchange (TSXV) in Canada under the symbol “NEXM” and on the Nasdaq Capital Market (the “Nasdaq”) under the symbol “NEXM” in the USA. NEXM is a mineral exploration and development company that is focused on the exploration and redevelopment of the previously producing, copper nickel and cobalt resources mines owned by the Company in the Republic of Botswana. Its’ exploration activities focus on copper and nickel, with exploration projects in Botswana and Canada.

 

The Project, including related infrastructure, was acquired on January 31, 2022, PNRC through its wholly owned indirect subsidiary, Premium Nickel Resources Proprietary Ltd (PNRPL). PNRPL’s definitive asset purchase agreement pertains to the Selebi Mines only.

 

Exploration work completed by the Project team to date has consisted of the sourcing and digitization of existing historical information, confirming collar and downhole location information of selected historical holes, completing electromagnetic (EM) surveys (borehole electro-magnetic (BHEM)) on selected high priority historical exploration holes and new holes, surface drilling to evaluate and assess up-side potential of Selebi Main, drilling off brownfields targets within the Selebi Mining Licence, advancing infrastructure and development of seven drill bays at Selebi North, and resource definition and exploration drilling from these drill bays.

 

The Project is currently conceptualised as accessing copper-nickel-cobalt sulphide mineralization via the infrastructure of two formerly operating underground copper-nickel mines. Mineralization contained within the amphibolite host unit beyond the historic mining areas will be brought to surface and the run-of-mine material processed by milling and flotation to produce both a saleable copper and a saleable nickel concentrate.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 1

 

The TRS is an update of NEXM’s prior Technical Report Summary for the Property, with an effective date of June 30, 2024, prepared by SLR Consulting (Canada) Ltd (SLR) for Premium Resources Ltd, named Premium Nickel Resources Ltd. (PNRL) at the time of the effective date of the TRS. Premium Resources Ltd. changed its name to NexMetals Mining Corp. on June 09, 2025. This October 2026 TRS is not reliant on the prior TRS and supersedes it.

 

1.1Property Description

 

The Project is located in the Bobirwa District (formerly part of the Central District) of Botswana, approximately 150 km southeast of the city of Francistown, and 410 km northeast of the national capital Gaborone.

 

The Selebi Mines are readily accessed year-round via paved and gravel roads from the town of Selebi Phikwe, located just north of the mining licence. With a population of approximately 52,000, the town is accessed via a well-maintained paved road that branches due east from the major A1 highway at the town of Serule, 57 km from the Project area.

 

Project infrastructure includes two mines, Selebi Main and Selebi North, both currently on care and maintenance, each with an operational shaft, and associated surface infrastructure such as office buildings, rail, power and roads.

 

1.2Land Tenure

 

The property consists of a single mining licence (2022/1L) covering an area of 11,504 ha (115.05 km2). The mining licence is centred at approximately 22°03’00”S and 27°47’00”E.

 

Mining licence 2022/1L was granted to PNRPL on January 31, 2022. The original mining licence (4/72) which had been granted to BCL on March 7, 1972, included both the Selebi and Phikwe project areas, and hosts mine infrastructure, including the concentrator and smelter plants located near the Phikwe mine which were used to process ore from both Selebi and Phikwe. Mining licence 4/72 was amended several times and renewed once; it was set to expire on March 6, 2022.

 

The new mining licence is limited to the Selebi and Selebi North deposits and their surrounding areas and expires on January 30, 2032.

 

1.3History

 

Exploration in the historical Project area was initiated in 1959 by Bamangwato Concessions Limited (Bamangwato) and included soil geochemistry, geological mapping, trenching, and diamond drilling over the then combined Selebi Phikwe area. The Selebi and Phikwe discoveries were made in 1963 and 1967, respectively, and a single mining lease was granted to Bamangwato in 1972 covering both areas.

 

Bamangwato changed its name to BCL in 1977 and operated the combined Selebi Phikwe mines from 1970 until its closure in 2016. Nickel and copper ore was mined from an open pit at Phikwe (1972 to 1980), as well as four distinct underground production areas, namely Phikwe (1981 to 2016), Southeast Extension (at Phikwe, 1997 to 2016), Selebi North (1990 to 2016) and Selebi (1980 to 2016). Head grades declined from 2010 to 2015 and in October 2016 BCL was placed into provisional liquidation and all of its operations put under care and maintenance. In total, 26.6 million tonnes (Mt) grading 0.58% Ni and 1.03% Cu were mined from Selebi (1980 to 2016), and 13.9 Mt grading 0.74% Ni and 0.66% Cu were mined from Selebi North (1990 to 2016).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 2

 

PNRC submitted an indicative offer to the Liquidator in June 2020 for the purchase of select assets owned by BCL. On March 24, 2021, PNRC signed an exclusivity MOU with the Liquidator that would govern a six-month exclusivity period to complete additional due diligence and related purchase agreements on the Botswana Cu-Ni-Co assets formerly operated by BCL.

 

On September 28, 2021, PNRC announced that it had executed the definitive asset purchase agreement (the Selebi Purchase Agreement) with the Liquidator to acquire the Selebi Mines, including the related infrastructure and equipment formerly operated by BCL. The acquisition closed on January 31, 2022, transferring the Selebi Mines and new Selebi mining lease to PNRC, a private corporation formed under the laws of the Province of Ontario, on January 31, 2022, through its wholly owned indirect subsidiary, PNRPL.

 

PNRL was founded upon the closing of the RTO whereby PNRC and NAN Subco, a wholly owned subsidiary of NAN, amalgamated by way of a triangular amalgamation under the OBCA on August 3, 2022. In connection with the RTO, the Company was continued under the OBCA and changed its name from “North American Nickel Inc.” to “Premium Nickel Resources Ltd.” The company later changed its name to “Premium Resources Ltd.” and then “NexMetals Mining Corp.”

 

1.4Geological Setting, Mineralization and Deposits

 

The eastern portion of Botswana forms part of the Limpopo Mobile Belt (LMB) which represents a deep crustal section through an orogenic province between the Kaapvaal and Zimbabwe Cratons.

 

The Project occurs in highly deformed and metamorphosed Archean gneisses near the north margin of the central zone (CZ) of the LMB. The CZ is characterized by complex structural fold patterns accompanied by regional and cataclastic metamorphism with grades ranging from amphibolite to granulite facies and cataclastic tectonites.

 

The deposits in the Project area are categorized as ortho-magmatic Ni-Cu sulphide-type deposits. They are hosted within amphibolite and understood as a tectono-metamorphically modified tholeiitic magma parents with an immiscible sulphide melt which has undergone all the phases of deformation that have affected the enclosing gneisses. They form part of the Selebi Phikwe belt of intrusions that also contain the Phikwe, Dikoloti, Lentswe, and Phokoje deposits.

 

All mineralization horizons pinch and swell, are conformable to the gneissic foliation, and are hosted within or at the hangingwall contact of amphibolite with the gneissic country rocks. Mineralization horizons range in thickness from very thin to over 20 m thick and are commonly one metre to three metres thick (deposit dependent). Orientation follows country rock foliation, and the zones can dip moderately to steeply, and individual zones can extend from 150 m to over 2,000 m.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 3

 

The principal sulphide minerals are pyrrhotite, chalcopyrite, and pentlandite which occur in massive, semi-massive, and disseminated form. Pyrite occurs as localized overgrowth. Magnetite occurs as rounded inclusions in massive sulphides and as later overgrowths.

 

1.5Exploration

 

Exploration work completed by the Project Team from 2021 to September 21, 2026, consisted of the sourcing and digitization of existing historical information, confirming collar and down hole location information of selected historical holes, and drilling. PNRPL also completed gyro, BHEM, televiewer, and downhole physical property surveys on selected high priority historical and recent exploration holes. A three-dimensional (3D) model of mineralization for use in targeting was created at Selebi North by SLR in 2022 and two focused structural studies over a portion of the Selebi Main and Selebi North deposit was developed by SRK Consulting Ltd. (SRK) in 2022 and 2025 respectively.

 

PNRPL drilled a total of 54,773 m in 48 surface holes and 8 extensions of BCL holes at Selebi Main between 2022 and September 21, 2026. A total of 36,700 m was drilled in 2025 and 2026 and were not included in the previous (2024) MRE. At Selebi North, PNRPL drilled a total of 72,655 m in 152 underground drillholes, of which 42,672 m were not included in the 2024 MRE.

 

The purpose of these programs was to:

 

●Validate information and interpretations collected and completed by historical operators.

 

●Demonstrate that the known mine horizons could host economic mineralization beyond the legacy infrastructure.

 

●Understand the size potential of the Selebi mines mineralizing systems.

 

●Collect sufficient data to support disclosure of MREs at each deposit.

 

Additionally, a regional exploration program in 2023 and 2025 was comprised of surface and BHEM surveys, and the drilling of 11 regional drillholes in 2,074m.

 

1.6Sample Preparation, Analyses and Security

 

1.6.1BCL drilling

 

BCL exploration core samples followed an industry standard sampling process. Samples were selected according to mineralization intensity. The entire length of the amphibolite unit and one metre either side was sampled. The core samples were cut in half longitudinally using a rotating diamond saw. The underground drillhole cores were generally of smaller diameter and were sampled as whole core. The bagged core samples were given a unique sample reference number, bagged and dispatched to the BCL laboratory.

 

QAQC samples were not routinely submitted as part of analytical programs prior to 2007. QAQC protocols were implemented by BCL in 2007. These included certified reference materials (at least 5%), blank samples (at least 5%), and pulp and coarse duplicate samples (at least 5% each). In addition to blind sample submissions to the laboratory by the BCL geological department, the BCL laboratory included certified reference material (CRM) samples for internal monitoring at a rate of 1 in 10, as well as duplicate samples.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 4

 

Historical (BCL) drillhole data were prepared and analysed at the BCL Mine Laboratory. At the time of preparation and analysis, the laboratory was not independent of the operator. The BCL laboratory received accreditation from the Southern African Development Community Accreditation Service in accordance with the ISO/IEC 17025:2005 international standard for technical competence of nickel and copper analysis in March 2016 and the majority of assays were completed prior to then. At the BCL laboratory, samples were crushed in a two-step process to ±5 mm, then a ±300 g sample was riffle split and pulverized to <325 mesh (45 µm). The BCL laboratory used a four acid (HNO3-HClO4-HF-HCl) digestion to treat the samples, and surface and underground exploration samples were assayed for copper, nickel, iron and cobalt using flame atomic absorption spectroscopy (FAAS) as well as sulphur. Routine BCL underground drilling core samples were only assayed for copper and nickel.

 

All historical surface drillhole core for Selebi Mines is stored at the Selebi North core processing and storage facility near the town of Selebi Phikwe.

 

In the MSA QP’s opinion, the sample preparation and analytical procedures for the BCL samples followed general industry standards at the time and the results can be used in conjunction with the PNPRL sample assays.

 

1.6.2PNRPL drilling

 

The PNRPL standard operating procedures require sampling of the entire amphibolite host plus a minimum length of one metre in the hangingwall and footwall lithologies. Sample intervals range from a minimum of 0.25 m to a maximum 1.5 m in length, with the majority of sampling kept at one metre intervals. The core samples were cut in half longitudinally using a rotating diamond saw. The bagged core samples were given a unique sample reference number, bagged and dispatched to the laboratory.

 

Samples collected at the Project were submitted to ALS Chemex South Africa in Johannesburg, (ALS Johannesburg) for preparation and analysis. ALS Johannesburg is independent of PNRPL, and its facilities are accredited to the International Organization for Standardization/International Electrotechnical Commission (ISO/IEC) 9001:2008 standards, for all quality management and to ISO/IEC 17025:2005 for all relevant procedures (SANAS Accredited Testing Laboratory, No. T0387).

 

The following analysis is undertaken at the ALS Johannesburg facilities:

 

●Sample Preparation: PREP-31 and PREP-32H. Samples are crushed to 70% less than 2 mm, riffle split to 250 g, pulverized split to greater than 85% passing 75 µm. PREP-32H provides a larger pulverized sample for pulp duplicates.

 

●Analysis: ME-ICP81. Samples are decomposed using a peroxide fusion with an ICP-AES finish to measure Ni, Cu, Co, As, Pb, Zn, S, Fe, Al2O3, CaO, Cr2O3, Fe2O3, K2O, MgO, MnO, SiO2 and TiO2.

 

●Analysis PGM-ICP23. Analyses for Pt, Pd, and Au are by fire assay with an ICP-AES finish.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 5

 

●Analysis ME-ICP61. Samples are analysed using four acid digestion with ICP-EAS finish to measure Ag.

 

●Analysis S-IR08. If sulphur over-runs occur, total S is determined by LECO furnace and infrared spectroscopy.

 

The PNRPL drilling and resampling was subjected to a comprehensive program of quality assurance and quality control (QAQC) by PNRPL, independent of the laboratories own QAQC measures, including certified reference materials (at least 5%), blank samples (at least 5%) and coarse duplicate samples (at least 5%).

 

A check assaying exercise was carried out in 2024 whereby pulp duplicates were assayed by SGS South Africa (PTY) Ltd. (SGS) of Johannesburg, South Africa for a set of the 2023-2024 Selebi Main samples. The results suggest a potentially significant positive bias of the ALS data (31% for Ni, 10% for Cu and 15% for Co), which is particularly apparent for the higher nickel and cobalt grades. This conclusion is not backed by results of CRMs assayed at ALS, which demonstrate acceptable accuracy by assay results from six different CRM’s, sourced from two different manufacturers, that did not show consistent bias or of such magnitude. Further check assay work is recommended on a routine basis and retrospectively to check for any potential bias.

 

All core is stored at the Selebi North core processing and storage facility near the town of Selebi Phikwe.

 

In the MSA QP’s opinion, the sample preparation and analytical procedures for the PNRPL samples are acceptable for the purposes of Mineral Resource estimation.

 

1.7Mineral Processing and Metallurgical Testing

 

The historical BCL operations consisted of an integrated mining, concentrating, and smelting complex which operated for over 40 years over the Selebi Phikwe project area. The smelter processed mixed Selebi and Phikwe concentrates and toll treated nickel concentrates received from the Nkomati Nickel Mine (a joint venture (JV) between Norilsk Nickel Africa Pty. Ltd. and African Rainbow Minerals) and the Phoenix Mine (Tati Nickel Mining Company, later a subsidiary of BCL). The mine and processing complex were placed on care and maintenance in October 2016. The processing complex that was located adjacent to the historical Phikwe Mine, and outside the Selebi Project area, has since been demolished.

 

NexMetals intends to use flotation to produce separate nickel and copper concentrates for commercial sale.

 

During 2025 and 2026, the project team developed a flowsheet capable of producing separate saleable concentrates, using samples collected from blasted underground material from the Selebi Main and Selebi North deposits. The BCR testwork supported flowsheet development and informed the design of key unit operations, including crushing, grinding and flotation. Recoveries of copper (Cu), nickel (Ni), cobalt (Co), gold (Au) and silver (Ag) were estimated from locked-cycle test results on the Master and Resource composite samples. These estimates are considered suitable for a preliminary-level evaluation.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 6

 

1.8Data Verification

 

The MSA QP visited the Project for six days from 03 November 2025 to 08 November 2025. The scope of the personal inspection included:

 

●Examination of existing infrastructure on surface and underground as well as current drilling sites.

 

●Examination of mineralization in underground exposures, including the recently blasted metallurgical sample locations.

 

●Location of drillhole collars and verification of coordinates using hand-held GPS.

 

●Review of the drilling, surveying, logging, sampling and QAQC protocols.

 

●Inspection of historical written data records and historical core storage.

 

●Review of a number of NEXM drillhole cores and verification of the logging and sampling data.

 

Verification work has confirmed the audit trail of the historical BCL data. The checks demonstrate that the historical and recent data have been accurately captured by PNPRL, although with limitations largely related to the capture of lithological logging. Mineralization in the PNPRL drillholes was observed to be consistent with the logging and assaying.

 

Portions of the Selebi Main deposit have been drilled by PNPRL, that have verified the nature of the mineralization, although the natural grade variability and limited data set failed to conclusively verify the grades. PNPRL is encouraged to complete additional drilling verification to improve the confidence in the historical data.

 

The Selebi North BCL surface drillhole data has been replaced by the PNPRL underground drilling, and it was not necessary to use the historical surface drilling. The nature of the mineralization in the BCL drillholes was observed to be consistent with that of the PNPRL surface and underground data, although some positional discrepancies in the intercept positions were noted for the surface drillhole intercepts.

 

The MSA QP is of the opinion that the historical BCL data is suitable to use in conjunction with the recent PNPRL data. The lower confidence in the BCL data should be considered in the Mineral Resource classification.

 

1.9Mineral Resource Estimates

 

The Mineral Resource was estimated in compliance with Subpart 1300 of Regulation S-K (17 CFR § 229.1300) (“Regulation S-K 1300”).

 

The 2026 Selebi Mines MREs were completed by The MSA Group (Pty) Ltd in Johannesburg, South Africa, separately for Selebi Main and Selebi North. Estimation comprises three-dimensional modelling of the mineralization contained within an amphibolite unit including drillhole sample intervals greater than a Net Smelter Return (NSR) value of USD70. A three-dimensional block model with appropriate sub-celling, was used to estimate metal grades and density by ordinary kriging (inverse distance for Selebi Main density) considering spatial trends of the mineralization. Volumes representing mined voids, areas sterilised by mining (e.g., remanent pillars) and dykes were removed from the model. NSR was then calculated for each block model cell using the estimated grades, metal prices, recoveries, off-site costs and payabilities. The mineral resource model was classified into the Indicated and Inferred categories, taking into account data quality, geological modelling uncertainty, mineralization continuity and drillhole spacing. The majority of the Indicated Mineral Resource is informed by drillholes closer than 50 m apart.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 7

 

The Mineral Resource was reported for portions of the model with an NSR of greater than USD 75 per tonne over a minimum thickness of 1.5 m. Areas of the block model that do not satisfy these criteria were constrained by volumes with a minimum height of 10 m. Portions of the model below an NSR of USD 75 per tonne enclosed by higher grade blocks were considered as internal dilution that may necessarily be extracted together with the higher grade mineralization, and were included in the reported Mineral Resource. Using concentration costs of USD20/tonne, General and Administration (G&A) expenses of USD5.5 per tonne, a mining cost of USD47.6/tonne and royalites of 3% for base metals, the MSA QP considers that reasonable prospects for economic extraction (RPEE) for the Mineral Resource have been demonstrated.

 

Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. There is no certainty that any Mineral Resources will be converted into Mineral Reserves. Inferred Mineral Resources have the lowest level of geological confidence of all Mineral Resources. Consistent with S-K 1302(d)(1)(iii)(B), the MSA QP has a reasonable expectation that the majority of the Inferred Mineral Resources could be upgraded to as an Indicated or Measured Mineral Resources with continued exploration. All Inferred Mineral Resources are informed by diamond drilling intercepts, that, with sufficient infill drilling, could reasonably be expected to be upgraded.

 

In addition to MSA’s internal peer and senior review processes, NEXM’s technical team have reviewed the MRE.

 

The MSA QP is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource Estimate.

 

The Mineral Resource Estimates for the Selebi Mines are presented in Table 1-1.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 8

 

Table 1-1
Selebi Mines Mineral Resource Estimates, October 16, 2026

 

Classification Deposit Tonnes Grade Contained metal
(millions) Cu
(%)
Ni
(%)
Co
(%)
Cu
(kt)
Ni
(kt)
Co
(kt)
Indicated Selebi North 8.95 1.03 1.08 0.06 92.2 96.7 5.4
Total Indicated 8.95 1.03 1.08 0.06 92.2 96.7 5.4
Inferred Selebi Main 32.47 1.53 0.97 0.05 495.4 316.8 16.2
Selebi North 9.48 1.21 1.13 0.06 114.7 107.0 5.5
Total Inferred 41.95 1.45 1.01 0.05 610.1 423.8 21.7

 

Notes:

1.Mineral Resources have been classified in accordance with SEC Regulation S-K 1300 and have been estimated under the supervision of the Qualified Person, MSA, a third-party firm comprising mining experts as defined by S-K 1300.
2.The 2026 MRE has been prepared in accordance with S-K 1300 definitions. Mineral Resources are exclusive of Mineral Reserves. There are no Mineral Reserves reported.
3.The 2026 MRE has an effective date of September 28, 2026, for Selebi Main and October 16, 2026, for Selebi North.
4.Mineral Resources, which are not Mineral Reserves, have no demonstrated economic viability. There is no guarantee that that all or any part of the Mineral Resource will be converted into a Mineral Reserve. The estimate of Mineral Resources may be materially affected by geology, environment, permitting, legal title, taxation, socio-political, marketing, or other relevant issues.
5.It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to an Indicated or Measured Mineral Resource.
6.The assessment is preliminary in nature; it includes Inferred Mineral Resources that are considered too speculative geologically to have modifying factors applied to them that would enable them to be categorised as Mineral Reserves, and there is no certainty that this economic assessment will be realised.
7.Mineral Resources reported on a 100% NEXM ownership basis.
8.All tabulated data have been rounded and as a result minor computational errors may occur.
9.kt = thousand tonnes, Mlbs = Million pounds, koz = thousand ounces.
10.Mineral Resources are reported in situ (point of reference).
11.The Mineral Resource is report as in situ dry tonnes; figures are reported in metric tonnes.
12.Mineral Resources are reported at a cut-off value of USD75/t NSR (Net Smelter Return), defined as received value of final metal recovered minus off-site costs, and a minimum thickness of 1.5 metres. Block model estimates of less than USD75/t NSR are included within the Mineral Resource in areas where it was considered not feasible to mine selectively around them. Areas of the block model were excluded in low grade areas where there is no potential to define a mineable block above USD75/t NSR.
13.Mineral Resources are estimated using long-term prices of USD9.10/lb Ni, USD5.10/lb Cu, USD20.00/lb Co. The same metal prices were used in NSR calculations.
14.Mineral Resources are estimated using nickel, copper and cobalt recoveries of 55.6%, 96.1%, and 60.2%, respectively, derived from metallurgical studies which consider a two-concentrate scenario.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 9

 

15.Payabilities and off-site treatment and refining costs were derived from an independent marketing study commissioned by NexMetals.
16.Bulk density has been estimated in the block model based on an extensive data set of measurements taken from drillhole cores. The average density for the mineralized zone is 3.47 t/m3 for Selebi Main and 3.65 t/m3 for Selebi North
17.Mineral Resources are reported using NSR values which assume mining costs of USD47.60/tonne, concentrate processing costs of USD20.00/tonne and G&A of USD5.50/tonne.
18.Areas depleted or sterilized by mining were removed from the Mineral Resource.
19.There are no Mineral Reserves.

 

1.10Conclusions

 

1.10.1Geology and Mineral Resources

 

●There is good understanding of the geology and the nature of the mineralization at the Selebi Mines. The Selebi deposits were continuously mined for several decades, and the geology has been the subject of several academic studies.

 

●The Selebi Mines copper-nickel sulphide mineralization occurs within an amphibolite unit reaching more than 30 m in thickness, but more commonly less than 15 m. The mineralized unit is developed over a scale of hundreds of metres to approximately 2 km in strike from surface to a drilled depth of more than approximately 1.5 km. Both Selebi Main and Selebi North are open at depth.

 

●The Mineral Resource is underpinned by a combination of historical and recent data. Verification work that has taken place has confirmed the nature of the mineralization.

 

●There are no drilling, sampling or recovery factors identified that could materially impact the accuracy and reliability of the results.

 

●The Mineral Resource is adequately drilled for the level of classification applied. The Mineral Resource at Selebi Main is classified as Inferred and at Selebi North the closer spaced drilling data, predominantly collected by PNRPL, allows for a portion of Indicated Mineral Resource to be declared.

 

1.10.2Mineral Processing

 

Recent testwork utilized fresh samples obtained from underground blasting at multiple locations, including Selebi North (South Limb, N2, and N3) and Selebi Main. These samples were selected and prepared by Flowsheets and were used in both the XPS/Flowsheets and BCR testwork programs. The Fuse QP considers these samples to be representative of the early years of mine development and appropriate for initial flowsheet development. However, it is recommended that future work incorporate systematic drill core sampling that is spatially representative of the deposits. In particular, Selebi Main and potential expansion areas should be comprehensively sampled to assess potential mineralogical variability with depth and lateral extent.

 

Preliminary flotation results indicate that copper–nickel separation is achievable. However, more representative sampling and testwork are needed to confirm that target concentrate grades can be achieved consistently across all deposit areas and that nickel misplacement to the copper concentrate stays within acceptable limits. The primary grinding conditions that support effective separation also need to be better understood, to ensure the same performance can be reproduced at plant scale.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 10

 

Furthermore, pre-concentration techniques have not been applied to Selebi materials in flotation testing to date. Should pre-concentration be advanced, further metallurgical testwork on upgraded material will be required to evaluate its impact on recovery and overall process performance.

 

1.11Recommendations

 

The MSA QP considers that confidence in the Mineral Resource is sufficient to progress the Project to a Preliminary Economic Assessment (PEA).

 

Drilling is recommended at Selebi Main to better characterize the “Flexure Zone”. This comprises 14,000 m in nine holes that will be completed during the period of the PEA.

 

Contingent on the outcome of the PEA, an infill drilling program is required to increase the confidence of the Mineral Resource to allow for more advanced studies to take place. This has not been planned for at this stage.

 

Metallurgical testwork was completed on samples from underground workings that are spatially representative of early mine development. The results support the flotation recoveries assumed in this study. Further testwork is recommended to support the PEA:

 

●Investigate grinding conditions to better understand nickel misplacement to the copper concentrate.

 

●Complete variability testing to confirm metallurgical performance across the deposits.

 

1.11.1Forward Work Program

 

The proposed forward work program comprises a PEA supported by additional metallurgical testwork. In parallel, exploration on the property is proposed to take place.

 

The forward work program is presented in Table 1-2.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 11

 

Table 1-2
Forward work program – proposed budget

 

Item Cost
(CAD 000)
Cost
(USD 000)

Geology and drilling

● Ongoing surface drilling (14,000 m in 9 holes)

● Geological support, gyro surveys, assays

● BHEM surveys

3,000 2,130

Metallurgical testing 

● Remaining Metallurgical Testwork to support the PEA

100 71
PEA including Engineering and trade-off studies 925 657

General site and administration costs 

● Maintain mine infrastructure, power, water, equipment repair and maintenance

2,600 1,846
Subtotal  6,625 4,704
Contingency (5%)  331 235
Total 6,956 4,939

 

Note: Exchange rate as of 16 October 2026 = USD 0.71 to CAD 1.00

 

The QPs support progressing to a PEA and further exploration work and consider that the approximate costs outlined in the proposed budget (Table 1-2) are justified for the current stage of the Project.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 12

 

2.Introduction

 

2.1Background, Terms of Reference and Purpose of the Report

 

The MSA Group (Pty) Ltd. (MSA) was retained by NexMetals Mining Corp. (NEXM; the Company) to prepare a Technical Report Summary (TRS) on the Selebi Mines Copper-Nickel-Cobalt Project (Selebi, the Selebi Project or the Project), located in the Bobirwa District (formerly part of the Central District) of the Republic of Botswana (Botswana).

 

The Selebi Project comprises the formerly producing Selebi Main and Selebi North mines. The purpose of this TRS is to document the updated Mineral Resource Estimates (MRE) for the Selebi Main and Selebi North deposits and the technical information available on the Project as of 16 October 2026.

 

This TRS conforms to the United States Securities and Exchange Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300 of Regulation S-K, Disclosure by Registrants Engaged in Mining Operations (S-K 1300) and Item 601 (b)(96) Technical Report Summary. The reported Mineral Resources are based on data collected up to September 22, 2026. NEXM is a Vancouver based exploration and development company. Its’ exploration activities focus on copper and nickel, with exploration projects in Botswana and Canada. Prior to June 9, 2025, the Company was named Premium Resources Ltd (PREM), prior to that, PNRL, and prior to that, NAN. NEXM’s common shares trade on the TSX Venture Exchange (TSXV: NEXM) in Canada and the Nasdaq Capital Market (NASDAQ: NEXM) in the USA. NEXM began trading on the Nasdaq on July 16, 2025.

 

Premium Nickel Resources Ltd (PNRL) was founded upon the closing of a reverse takeover transaction (the RTO) whereby PNRC and 1000178269 Ontario Inc. (NAN Subco), a wholly owned subsidiary of North American Nickel Inc. (NAN), amalgamated by way of a triangular amalgamation under the Business Corporations Act (Ontario) (OBCA) on August 3, 2022. In connection with the RTO, the Company was continued under the OBCA and changed its name from “North American Nickel Inc.” to “Premium Nickel Resources Ltd”.

 

The Project, including related infrastructure, was acquired on January 31, 2022, by Premium Nickel Resources Corp. (PNRC), a private corporation formed under the laws of the Province of Ontario, through its wholly owned indirect subsidiary, Premium Nickel Resources Proprietary Ltd (PNRPL).

 

PNRC submitted an indicative offer to the BCL Limited (BCL) liquidation trustee (the Liquidator) in June 2020 for the purchase of selected assets owned by BCL. On March 24, 2021, PNRC signed an exclusivity Memorandum of Understanding (MOU) with the Liquidator that would govern a six-month exclusivity period to complete additional due diligence and related purchase agreements on the Botswana Cu-Ni-Co assets formerly operated by BCL.

 

On September 28, 2021, PNRC announced that it had executed the definitive asset purchase agreement (the Selebi Purchase Agreement) with the Liquidator to acquire the Selebi Mines including the related infrastructure and equipment formerly operated by BCL. The acquisition closed on January 31, 2022, transferring the Selebi Mines and new Selebi mining lease to PNRPL.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 13

 

BCL operated the combined Selebi and Phikwe mines from 1970 until their closure in 2016. Ore was mined from four distinct underground production areas namely Phikwe (1 Shaft, Phikwe Central and Phikwe South), Southeast Extension, Selebi North, and Selebi (now known as Selebi Main). PNRL’s definitive asset purchase agreement pertains to the Selebi Mines only. In total, 26.6 million tonnes (Mt) grading 0.58% Ni and 1.03% Cu were mined from Selebi (1980 to 2016), and 13.9 Mt grading 0.74% Ni and 0.66% Cu were mined from Selebi North (1990 to 2016).

 

The Project is currently conceptualised as accessing copper-nickel-cobalt sulphide mineralization via the infrastructure of two formerly operating underground copper-nickel mines. Mineralization contained within the amphibolite host unit beyond the historic mining areas will be brought to surface and the run-of-mine material processed by milling and flotation to produce both a saleable copper and a saleable nickel concentrate.

 

2.2Registrant for Whom the Technical Report Summary was Prepared

 

This report was prepared as a TRS in accordance with the SEC S-K regulations (Title 17, Part 229, Items 601 and 1300 through 1305) for NexMetals Mining Corp.

 

2.3Corporate Structure

 

PNRPL is an indirect subsidiary of NEXM, being a wholly owned subsidiary of Premium Resources Selebi (Barbados) Limited, which is in turn wholly owned by Premium Resources International Limited, which is in turn wholly owned by PNR Amalco Ltd., a direct wholly owned subsidiary of NEXM.

 

Throughout this report references are made to PNRPL as the local operating company and NEXM as the ultimate Project owner and issuer of the report, and in some instances references to either entity are interchangeable.

 

2.4Principal Sources of Information

 

MSA has based its review of the Property on information provided by NEXM/ PNRPL, along with technical reports by the current and previous tenement holders, and other relevant published and unpublished data as listed in the References section of this Report.

 

MSA has endeavoured, by making all reasonable enquiries, to confirm the authenticity and completeness of the technical data upon which the TRS is based. The TRS and Mineral Resource Estimate has been prepared using diamond drilling sample assay data available up to and including 22 September 2026.

 

During the site visit and during the preparation of this TRS, discussions were held online and onsite with personnel from NEXM:

 

●Sharon Taylor, P.Geo., Vice President Geophysics, NEXM.

 

●Gerry Katchen, P.Geo., former Exploration Manager, NEXM.

 

The principal sources of information used in the Mineral Resource include an extensive drillhole database compiled by PNRPL. These include drilling completed by PNPRL between 2022 and 2026 and data sourced from campaigns by the previous owner (BCL) have been validated and included where appropriate.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 14

 

Previous technical reports on the Project include:

 

●A Technical Report on the Project was filed in Canada in 2022 (SLR, 2022). This report did not include a Mineral Resource Estimate.

 

●Technical Report on the Project that included a Mineral Resource Estimate with an effective date of June 30, 2024, that was filed in Canada on September 20, 2024 (SLR, 2024).

 

●A TRS on the Project that included a Mineral Resource Estimate with an effective date of June 30, 2024, was filed in the United States on December 17, 2024 (SLR, 2024).

 

MSA has reviewed the aforementioned previous technical reports and, where appropriate, referenced information from these reports.

 

This TRS supersedes the previous report: S-K 1300 Technical Report Summary. Selebi Mines, Central District, Republic of Botswana, dated December 17, 2024, prepared by SLR Consulting (Canada) Ltd which had previously been filed in accordance with U.S. SEC (Regulation S-K Subpart 1300 (“S-K 1300”).

 

2.5Qualifications, Experience and Independence

 

MSA is an exploration and resource consulting and contracting firm, which has been providing services and advice to the international mineral industry and financial institutions since 1983. The MSA Group is independent of NEXM, its respective directors, senior management and advisers.

 

Neither MSA, nor the author of this report, has or has had previously, any material interest in NEXM or the mineral properties in which NEXM has an interest. Our relationship with NEXM is solely one of professional association between client and independent consultants. This report is prepared in return for professional fees based upon agreed commercial rates and the payment of these fees is in no way contingent on the results of this report. The QPs and authors have no bias with respect to the asset that is the subject of the Report, or to the parties involved with the assignment. There is no conflict of interest in MSA or Fuse Advisors undertaking the QP Report as contained in this document.

 

Jeremy Witley of MSA was employed at the BCL Mines as a geologist from 1994 to 2004. Neither Mr Witley nor MSA has any affiliation with an entity holding a royalty or other interest in the property.

 

2.5.1Qualified Persons

 

This report was compiled by MSA, with sub-sections authored by Fuse Advisors, a part of SLR Consulting. Both firms are third-party firms comprising mining experts in accordance with 17 CFR § 229.1302(b)(1). NEXM has determined that both firms meet the qualifications specified under the definition of Qualified Person in 17 CFR § 229.1300. The list of firms responsible for each report section is presented in Table 2-1.

 

References to the Qualified Person, or QP, in this report are references to MSA or Fuse Advisors and not to any individual employed by MSA or Fuse Advisors. In the case of instances referring to geology, exploration, Mineral Resources and direct relations, the QP refers to MSA and not to any individual employed by MSA. In the instances referring to mineral processing and metallurgical testing, the QP refers to Fuse Advisors and not to any individual employed by Fuse Advisors.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 15

 

Table 2-1
Responsibilities of the Qualified Persons

 

Qualified Person Items Responsible for Items Co-Responsible for
MSA 4 – 12, 14 - 23 1, 2, 3, 24, 25, 26, 27
Fuse Advisors 1.7, 13 1, 2, 3, 24, 25, 26, 27

 

2.6Site Visits and Scope of Personal Inspection

 

Site visits were performed as follows:

 

●The MSA QP visited the Project for six days from 03 November 2025 to 08 November 2025. The scope of the personal inspection included:

 

◌Examination of existing infrastructure on surface and underground as well as current drilling sites.

 

◌Examination of mineralization in underground exposures, including the recently blasted metallurgical sample locations.

 

◌Location of drillhole collars and verification of coordinates using hand-held GPS.

 

◌Review of the drilling, surveying, logging, sampling and QAQC protocols.

 

◌Inspection of historical written data records and historical core storage.

 

◌Review of a number of NEXM drillhole cores and verification of the logging and sampling data. The magnitude of the nickel and copper grades was verified against the assay sheets for several intercepts by visual inspection.

 

●Fuse Advisors did not visit the project as no metallurgical testwork has been completed on the site and there are currently no processing facilities on site.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 16

 

2.7Effective Date

 

The Effective Date of this TRS is October 16, 2026.

 

2.8Units and Currency

 

The International System of Units (SI) is used throughout the report, and currency information is based on the Canadian Dollar (CAD), United States Dollar (USD) or Botswana Pula (BWP) unless otherwise stated. The exchange rate as of 16 October 2026 is 9.38 BWP per CAD, 13.28 BWP per USD and 1.42 CAD per USD.

 

A table, summarizing units of measure and abbreviations specific to this TRS, is set out in Section 2.9 below.

 

Unless indicated otherwise, all of the coordinates stated in this report are in Universal Transverse Mercator (UTM) 1984 World Geodetic System (WGS84) datum, with a Zone 35 South projection and geoidal elevations. For certain sections of the report, particularly those pertaining to Mineral Resources (Section 14), the local BCL Mine Grid was used.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 17

 

The conversion from BCL Mine grid to UTM WGS84 is:

 

Y = -0.99985747 *X + 7600674.21

 

X = 0.99981507 *Y + 499950.69

 

2.9Units of Measurement and Abbreviations

 

Units of measurement and abbreviations used in this TRS are listed below.

 

  ≈ / ~ Approximately equal to
  ° Degree
  °C Degrees Celsius
  % Per cent
  μm micron
  BWP Botswana Pula
  CAD Canadian Dollar
  dmt Dry metric tonne
  g gram
  g/cm3 Gram per cubic centimetre
  g/t Grams per tonne
  Ga Giga annum / billion (109) years
  ha Hectare
  HQ 96.0 mm diameter drillhole producing 63.5 mm core
  kg Kilogram
  km Kilometre
  km2 Square kilometre
  koz Thousand ounces
  kt Kilo tonne / thousand tonnes
  kWh/t Kilowatt-hours per tonne

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 18

 

  m metre
  Ma Million years
  mE Metres east
  Mlbs Million pounds
  mm Millimetre
  mN Metres north
  Mt Million tonnes
  mV millivolts
  NQ 75.7 mm diameter drillhole producing 47.6. mm core
  ppb Parts per billion
  ppm Parts per million
  tpd Tonnes per day
  tpa Tonnes per annum
  t/m3 Tonne per cubic metre
  USD United States Dollar
  USD/lb United States Dollars per pound
  USD/t United States Dollars per tonne
  Vol% Volume per cent
  wmt Wet metric tonne
  wt% Weight per cent

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 19

 

3.Reliance on INFORMATION PROVIDED BY THE REGISTRANT

 

This TRS has been prepared by MSA for NEXM. The information, conclusions, opinions, and estimates contained herein are based on:

 

●Information available to MSA at the time of preparation of this TRS.

 

●Assumptions, conditions, and qualifications as set forth in this TRS.

 

MSA has not independently verified, nor is it qualified to verify, the legal status of the Project property. The present status of tenements listed in this Report is based on information provided by NEXM, and the Report has been prepared on the assumption that the tenements will prove lawfully accessible for evaluation. Information that MSA has relied on, as provided by NEXM, is detailed in the following sections of this TRS:

 

●1.2 Land Tenure

 

●4.2 Mineral Tenure, Permitting, Rights and Agreements

 

●4.4 Royalties and Encumbrances

 

The aforementioned sections have been reviewed by NEXM’s legal counsel in Botswana (Bookbinder Business Law, Gaborone).

 

MSA has not independently verified the environmental permitting and liability for the Project. Information that MSA has relied on, as provided by NEXM, is detailed in the following section of this TRS:

 

●4.3 Environmental Liabilities.

 

The MSA QP has relied on the marketing study by Aird (Aird,2006) for the NSR calculation and assessment of reasonable prospects for economic extraction (Section 14.3.3, 14.3.13 and 14.4.13).

 

Exploration information, which forms the basis of the Mineral Resource Estimate, has been provided by NEXM. The MSA QP has accepted this information following various checks as outlined in the report (Section 12).

 

Except for the purposes legislated under provincial securities laws, any use of this TRS by any third party is at that party’s sole risk.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 20

 

4.Property Description and Location

 

4.1Location

 

The Project consists of a single mining licence (2022/1L) covering an area of 11,504 ha located near the town of Selebi Phikwe, approximately 150 km southeast of the city of Francistown, and 410 km northeast of the national capital of Gaborone. The mining licence is centred at approximately 22°03’00” S and 27°47’00” E and is presented in Figure 4-1.

 

Figure 4-1
Location of Selebi Mines

 

 

This mining licence gives PNRPL the right to mine copper and nickel ores and associated minerals contained in these mined ores. The licence is limited to the Selebi Main and Selebi North deposits and their surrounding areas and expires January 30, 2032.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 21

 

4.2Mineral Tenure, Permitting, Rights and Agreements

 

Mining licence 2022/1L was granted to PNRPL on January 31, 2022, and includes the Selebi Mines deposits. The original licence (4/72) had been granted to BCL on March 7, 1972, and included both the Selebi and Phikwe mines areas, as well as associated infrastructure, including the concentrator and smelter plants used to process ore from both Selebi and Phikwe. Mining licence 4/72 was amended several times and renewed once and was set to expire on March 6, 2022. The current mining licence is limited to the Selebi Main and Selebi North deposits and their surrounding areas and expires January 30, 2032. The licence allows PNRPL to mine copper and nickel ores and associated minerals contained in the mined ores.

 

Section 42 of the Mines Act (the Act) states that “The holder of a mining licence may apply to the Minister for the renewal of his licence at any time not later than one year before the expiry of such licence…..”. The terms and conditions for the renewal of the mining licence are framed by the relevant sub-sections of Section 42 of the Act and indicate that:

 

1.The Minister shall grant an application for renewal if satisfied that:

 

a)the applicant is not in default;

 

b)development of the mining area has proceeded with reasonable diligence;

 

c)the proposed program of mining operations will ensure the most efficient and beneficial use of the mineral resources in the mining area.

 

2.The Minister shall not reject an application on the ground referred to in:

 

a)paragraph 1.a) above, unless the applicant has been given details of the default and has failed to remedy the same within three months of such notification;

 

b)paragraph 1.b) above, unless the applicant has been given reasonable opportunity to make written representations thereon to the Minister; or

 

c)paragraph 1.c) above, unless the applicant has been so notified and has failed to propose amendments to his proposed program of mining operations satisfactory to the Minister within three months of such notification.

 

3.Subject to the provisions of the Act, the period of renewal of a mining licence shall be such period, not exceeding 25 years, as is reasonably required to carry out the mining program.

 

4.On the renewal of a mining licence, the Minister shall append thereto the program of mining operations to be carried out in the period of renewal.

 

In order to maintain the mining licence in good order, the holder must make annual licence payments on its anniversary date in accordance with Section 71 of the Act, and monthly royalty payments according to Section 66 of the Act, if appropriate, in each case to the Government of Botswana. The royalties payable are percentages of the gross market value of mineral or mineral products as follows: precious stones (10%), precious metals (5%), and other minerals or mineral products (3%). The term gross market value is defined in the Act as the sale value receivable at the mine gate in an arms-length transaction without discounts, commissions, or deductions for the mineral or mineral product on disposal. Annual fees are calculated as BWP 200/km2 of part thereof subject to a minimum of BWP 1,000.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 22

 

4.2.1Mineral Rights

 

In Botswana, mining activities are regulated under the Act, which is administered by the Ministry of Minerals and Energy (MME). The Act regulates the issuance of exploration and mining licences as well as harmonizing mining activities and environmental impacts.

 

With regards to environmental issues, the Act stipulates that the holder of the mineral concession shall:

 

●in accordance with Botswana law and good mining industry practice, conduct operations in such manner as to preserve in as far as possible the natural environment, minimize and control waste or undue loss or damage to natural and biological resources, to prevent and where unavoidable, promptly treat pollution and contamination of the environment and shall take no steps which may unnecessarily or unreasonably restrict or limit further development of the natural resources of the concession area or adjacent areas.

 

●in the event of an emergency or extraordinary circumstances requiring immediate action, the holder of a mineral concession shall forthwith notify the Director of Mines and shall take all immediate action in accordance with the reasonable directions of the Director of Mines.

 

●prepare and submit an Environmental Impact Assessment (EIA) report as part of a mining licence or retention licence application or renewal.

 

●ensure that his concession area is rehabilitated from time to time and ultimately reclaimed in so far as is practicable in a manner acceptable to the Director of Mines.

 

●during and at the end of operations in any mine, excavation, waste dump or pond, the holder of a mineral concession shall take such measures as are required from time to time to maintain and restore the top soil of affected areas and otherwise to restore the land substantially to the condition in which it was prior to the commencement of operations.

 

●make adequate ongoing financial provision for compliance with environmental obligations as stipulated by the Act.

 

Any abstraction of water in Botswana is regulated through the Water Act of 1967.

 

PNRPL was granted a mining licence to permit the ongoing care and maintenance activities at the Selebi Mines and to conduct exploration work from both surface and underground.

 

4.2.2Surface Rights

 

The Project is subject to two land tenure systems namely, State Land within the Township boundary and Tribal Land for the remaining portions. The two land tenure systems are administered by the Department of Lands and governed by the Ngwato Land Board, respectively. PNRPL holds a lease agreement granting exclusive surface rights (Grant of Lease) for 1,800 ha within the mining licence area that includes the Selebi Mines. The lease agreement is deemed effective January 31, 2022, and is valid for a period of 10 years, equivalent to the duration of mining licence 2022/1L. If the mining licence is renewed, then the Grant of Lease shall automatically be renewed for the period equivalent to the renewed mining licence, subject to the conditions prevailing during the period of renewal. The current rental amount for the Grant of Lease is Botswana Pula (BWP) 915,204.7 per annum (approximately USD 68,916 based on a USD 1 = 13.28 BWP exchange rate), and if renewed, the Land Board and PNRPL shall negotiate the appropriate fee for the renewed period. PNRPL also holds the surface rights to a 181 ha strip of land for rail and power service. The rental amount on the rail and power servitude is BWP 105,521.10 per annum (approximately USD 7,946 per annum) for the first term of the Grant of Lease, and the Land Board and PNRPL shall negotiate the appropriate rental for any renewed period. Figure 4-2 illustrates the disposition of the surface rights.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 23

 

Figure 4-2
Land tenure and surface rights
 

Source: NEXM, 2026

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 24

 

4.3Environmental Liabilities

 

The MSA QP is not aware of any environmental liabilities on the Selebi Mines property, which was assumed by PNRPL pursuant to the Selebi Purchase Agreement.

 

4.3.1Environmental Permitting

 

PNRPL holds a Mining Licence and an approved Environmental Management Plan (EMP) from the Department of Environmental Protection (DEP) that currently gives it the right to carry out surface and underground exploration work as well as underground care and maintenance activities. PRNPL also has an approved Archaeological Impact Assessment (AIA) from the Department of National Museum and Monuments (DNMM). The Project area is situated on Tribal lands and surface rights have been secured through an agreement with the Ngwato Land Board.

 

Prior to the construction of a processing facility and tailing storage facility (TSF), PNRPL requires an approved Environmental Impact Assessment (EIA) from the DEP, permits for water management and waste management from the DEP and permission from the Bobirwa District Council for the construction of permanent buildings.

 

PNRPL would need to also require additional surface rights from the Ngwato Land Board.

 

There are no expected obstacles to obtaining all the required permits.

 

4.4Royalties and Encumbrances

 

In order to maintain the mining licence in good order, the holder must make annual licence payments on its anniversary date in accordance with Section 71 of the Act and monthly royalty payments according to Section 66 of the Act, if appropriate, in each case to the Government of Botswana. The royalties payable are percentages of the gross market value of mineral or mineral products as follows: precious stones (10%), precious metals (5%), and other minerals or mineral products (3%). The term gross market value is defined in the Act as the sale value receivable at the mine gate in an arms-length transaction without discounts, commissions, or deductions for the mineral or mineral product on disposal.

 

PNRPL has signed a royalty agreement and contingent compensation agreement with the Liquidator.

 

A 2% net smelter return (NSR) exists on the sale of concentrates (or any other economic mineral resource material produced and sold) subject to specific rights of purchase by the purchaser and the Government of Botswana:

 

●A reduction to a 1% NSR for a payment of USD 20 million on or before the two-year anniversary date of the first shipment. Cymbria Corporation (“Cymbria”), an affiliate of the Company’s largest shareholder, EdgePoint Investment Group Inc., has an option to participate in the repurchase which would provide Cymbria with a 0.5% NSR royalty.

 

●A general first right of purchase shared between the purchaser and the Government of Botswana.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 25

 

There is also a contingent compensation agreement whereby PNRPL would pay additional compensation to the Government of Botswana if and when it discovers additional resources over and above the base case scenario of 15.9 Mt:

 

●New resource discovery up until the end of the seven-year mine life of the base case resource of 15.9 Mt (minimum grade of 2.5% NiEq, at Decision to Mine):

 

◌25 Mt < new deposit > 50 Mt - USD0.50 per tonne.

 

◌50 Mt < new deposit> 75 Mt - USD0.20 additional per incremental tonne.

 

◌75 Mt < new deposit> 100 Mt - USD0.30 additional per incremental tonne.

 

◌New deposit >100 Mt - USD0.40 additional per incremental tonne.

 

The payment of contingent compensation shall be made from operating cash flow of the mine(s) once in operation and subject to adequate liquidity.

 

4.5Other Significant Factors and Risks

 

The QP is not aware of any other significant factors and risks that may affect access, title, or the right or ability to perform the proposed work program on the Property.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 26

 

5.Accessibility, Climate, Local Resources, Infrastructure and Physiography

 

5.1Accessibility

 

The Selebi Mines are readily accessed via paved and gravel roads from the town of Selebi Phikwe, located just north of the mining licence. With a population of approximately 52,000, the town is accessed via a well-maintained paved road that branches due east from the major A1 highway at the town of Serule, 57 km from the Project.

 

5.2Climate

 

The Project has a semi-arid climate with temperatures that typically vary from 7 °C to 37 °C. The warm season lasts from September to March with an average daily temperature above 30 °C, while the colder season lasts from June to the end of July with an average low temperature of 7 °C and average high temperature of 24 °C. The wet season occurs from November to mid-March. The wettest month is typically January, with an average of 10 days with at least one millimetre of precipitation (Weatherspark.com,2026).

 

No climatic risks exist that would affect the year-round exploitation of the resources delineated in the future.

 

Figure 5-1 illustrates the average annual temperature and Figure 5-2 shows the average annual rainfall for the Project area.

 

Figure 5-1
Average annual temperature profiles for the Project area

 

Notes:The daily average high (red line) and low (blue line) temperature, with 25th to 75th and 10th to 90th percentile bands. The thin dotted lines are the corresponding average perceived temperatures.
Source:WeatherSpark.com, 2026

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 27

 

Figure 5-2
Average rainfall profile for the Project area
 

 

Source:WeatherSpark.com, 2026

 

5.3Local Resources and Infrastructure

 

5.3.1Human Resources

 

No specific deficiencies in the general labour resource have been identified as the former mining company BCL had engaged in the training and development of local Botswana skills. With the exception of highly specialized technical experts required during the construction phase, PNRPL believes that there is a local skills base with sufficient capacity to cater for its further needs with regard to the Project and its general organizational development requirements.

 

5.3.2Infrastructure, Power, Water and Supply

 

The town of Selebi Phikwe is serviced by a paved road, and a railway line runs from Selebi Phikwe to Serule where it joins the main line from Gaborone to Francistown. The railway line is predominately used for the freighting of materials and goods to and from Selebi Phikwe.

 

Selebi Phikwe is serviced by a government run airport situated near the Project on the outskirts of town. The airport is open daily; however, it has no fuelling facility onsite and no commercial flights.

 

Reliable landline telephone communication, using the Botswana Telecommunications Corporation (BTC) network, is available throughout most of the country. BTC, as well as other private cellular network providers, also provide reliable cellphone coverage over most of the country.

 

Although, Botswana is situated in a semi-arid terrain, the town of Selebi Phikwe is adequately serviced by the Water Utilities Corporation which supplies treated water to the community as well as to the Project. Several government managed dams exist in the area, including Letsibogo Dam, (located near Mmadinare, approximately 17 km from Selebi Phikwe) and Shashe Dam (located 80 km to the northwest of Selebi Phikwe). Dikgatlhong Dam, is located approximately 40 km to the north and supplies the southern regions of Botswana, including Gaborone.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 28

 

Shashe Dam was originally built to supply water to Selebi Phikwe and the historical BCL operations. The historical operation was able to source much of its water from an underground aquifer at #3 Shaft.

 

All electricity and power supply in Botswana is transmitted and managed by the Botswana Power Corporation (BPC). The Project is supplied through the National Grid, via a 220/66/11KV substation. The 220 KV substation is fed by two 220 KV overhead lines that run 7.6 km from the Phokoje substation.

 

5.3.2.1Selebi mines infrastructure

 

The purchased infrastructure at the Selebi Mines includes two mines currently on care and maintenance, namely Selebi (#2 Shaft) and Selebi North (#4 Shaft), and associated surface infrastructure.

 

The Selebi Mine has a vertical rock/service shaft down to the 300 m level, and a cable belt conveyor decline from the 300 m level to the 850 level. Stations are at 50 m vertical intervals, commencing on the 100 m level. A jaw crusher is located on the 300 m level, loading boxes are located on the 340 m level, and a spillage box is located on the 367 m level.

 

The -18° decline currently runs from the 250 m level to the 850 m level providing access to deposits between the 300 m level and 800 m level horizons. A single drum winder at the top of the decline enables transport of personnel and material and is also used for waste rock handling from decline development. Stations are cut at 50 m vertical intervals, with a crusher station on the 850 m level and a cable belt loading facility on the 875 m level. A tertiary sub inclined shaft equipped with twin rails extends from the 850 m level to the 1,050 m level. This shaft provides access to the levels below the 850 m level. A 4.8 m diameter, concrete lined, ventilation shaft is located approximately 1,000 m north of the rock/service shaft.

 

The Selebi North Mine is serviced by a 3.5 m diameter shaft down to the 745 m level and a twin 7° decline trucking ramp that is currently down to the 900 m level. The shaft is equipped with a Koepe winder with a two cage/six tonne skip. The cage has a four-person capacity. The shaft limitation suggests that it was primarily used for ore skipping, and that material and personnel were mainly transported via the ramp.

 

The Selebi Mines are powered by two overhead lines. Power is supplied by the Botswana Power Corporation (BPC).

 

5.3.2.2Tailings/waste/plant sites

 

The Project is at an MRE stage and potential tailings storage areas, waste disposal areas, and processing plant sites have not been assessed in detail. Both Selebi Main and Selebi North are historical mines under care and maintenance. Existing waste dumps exist on the property, and the flat topography provides locations for further waste dumps. The existing waste dump facilities would require investigation as to their sufficiency for future requirements. Although, there are no historical tailings storage facilities, historical or currently permitted, on the property, the flat lying topography and lack of built-up populated areas within the property allow for locations for potential tailings storage facilities. These would need to be permitted.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 29

 

5.4Physiography

 

5.4.1Topography

 

The topography of the Project area is generally flat and typical of the basement system of Botswana. The Project lies at an altitude between 780 metres above mean sea level (mamsl) and 980 mamsl, with a gentle gradient from southwest to northeast. A number of hills, ridges, kopjes, and inselbergs of granitoid rocks are found within the mining licence and surrounding areas, with the most prominent hill being Selebi Hill located at the southwest corner of the township boundary.

 

5.4.2Surface Water

 

Selebi Phikwe lies on the fringe of the semi-arid Kalahari and has a hot dry climate. Selebi Phikwe receives an annual average rainfall of 416.4 mm/year and over 90% of the annual rainfall occurs during the summer months from November to April. The Letlhakane River is situated approximately 10 km north of the Project site. This river and its tributaries are ephemeral, i.e., they contain water only in the rainy season for a few hours or days after rainstorms.

 

5.4.3Groundwater

 

Groundwater continuously seeps into the underground workings of the former producing Selebi and Selebi North mines, necessitating active dewatering. Selebi Mine pumps approximately 1,000 m³/day, while Selebi North pumps approximately 400 m³/day. Mine water discharges are monitored monthly through water quality sampling, while groundwater quality is assessed annually through sampling of mine and surrounding farmers’ boreholes in both areas.

 

5.4.4Flora and Fauna

 

Vegetation of the project area is described as Mopane woodland and shrub woodland biome, comprised of grasses, shrubs and large leaf trees. Grass is generally sparse. One protected tree species, the Baobab, was identified within the Project area.

 

Reptile diversity at the project site is very low. Even the areas where reptiles were to be commonly expected to frequent, are lacking in any reptilian presence. Project snake handlers have captured four species of snakes. For amphibians, three species of frogs have been identified near the evaporation ponds. Only twelve wild species of mammals were identified, including rabbits, squirrels, jackals, brown hyenas, and bats. Domesticated animals (cattle, dogs, goats and sheep) are also present. Many common bird species can be observed within the project area. The area is not a critical habitat for any of the bird species of conservation concern.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 30

 

6.History

 

The following paragraphs regarding the history of the Project are largely extracted from a previous TRS prepared by SLR (SLR, 2024).

 

6.1Prior and Current Ownership

 

Discussions between the Roan Selection Trust and the Bamangwato tribal chiefs, initiated in 1956, culminated in the signing of an agreement in 1959 that formed Bamangwato Concessions Limited (Bamangwato), allowing for the exploration and exploitation of the nickel and copper deposits in the Project area (Lungu, 2016).

 

In 1972, the Government of Botswana issued mining lease 13-NQ (State Grant 4/72), covering an area of 27,310.43 ha, to Bamangwato. This mining lease was granted for copper and nickel ore and associated minerals contained in these mined ores for a period of 25 years, with the option to renew.

 

In 1977, Bamangwato changed its name to BCL. BCL and predecessor Bamangwato operated the combined Selebi and Phikwe Mines from 1973 until its closure in 2016. Ore was mined from an open pit at Phikwe, as well as from four distinct underground production areas, namely Phikwe (1 Shaft, Phikwe Central, and Phikwe South), Southeast Extension, Selebi North, and Selebi. BCL was placed under provisional liquidation in October 2016, with all operations placed on care and maintenance.

 

PNRC submitted an indicative offer for the purchase of select assets owned by BCL to the Liquidator in June 2020. On March 24, 2021, PNRC signed an exclusivity Memorandum of Understanding (MOU) with the Liquidator. The MOU granted PNRC a six-month exclusivity period, allowing for the completion of additional Due Diligence and the drafting of related purchase agreements for the Botswana Ni-Cu-Co assets formerly operated by BCL.

 

The Project was acquired by PNRC, a private corporation formed under the laws of the Province of Ontario, on January 31, 2022, through its wholly owned indirect subsidiary PNRPL.

 

On September 28, 2021, PNRC announced that it had executed the Selebi Purchase Agreement to acquire the Selebi Mines, including the related infrastructure and equipment formerly operated by BCL, with the Liquidator. The acquisition closed on January 31, 2022, transferring the Selebi Mines and the new Selebi mining licence 2022/1L to PNRPL.

 

The current mining licence 2022/1L is smaller than the previous licence (State Grant 4/72), including only the Selebi Mines and their surrounding areas. The original State Grant 4/72 also included the Phikwe mines and associated infrastructure, including the concentrator and smelter plants used to process ore from both Selebi and Phikwe mines.

 

6.2Exploration and Development History

 

The information below describes work completed over the historical BCL Selebi Phikwe project and is largely summarized from Lungu (2016). As regional exploration was undertaken concurrently on both the Selebi and Phikwe projects, information relevant to Phikwe has been retained as extracting information from the exploration reporting which is pertinent to Selebi only is difficult. Where possible, MSA has noted where information is relevant to either Selebi or Phikwe.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 31

 

6.2.1Early Exploration (1959-1990)

 

Exploration in the Project area was initiated by Bamangwato in 1959.

 

The anomalous copper and nickel occurrences in the Selebi Phikwe area were all discovered through geochemical soil surveys (Gordon, 1973). The geochemical soil sampling was conducted in stages from reconnaissance to close interval sampling on identified targets. The 1.6 km long Ni-Cu geochemical anomaly at Selebi was defined in March/April 1963 and classified as a mineral occurrence in May/June 1963. Mineralization was found to outcrop as gossans at the three main target areas of Selebi, Selebi North, and Phikwe. Trenching and mapping were undertaken to determine the lateral extent and geology of the mineralization and associated lithologies. To test for sulphide mineralization at depth, wagon and diamond drilling was conducted on the most favourable targets. Magnetic surveying to define sub-cropping mineralization was also undertaken.

 

This early stage of exploration is not well documented.

 

6.2.1.1Geological mapping

 

The discovery of the Selebi and Phikwe deposits in 1963 and 1967 respectively, triggered scientific research work by groups and individuals in the vicinity of Selebi Phikwe, encompassing the current Project area. From 1964 to 1975, the Botswana Geological Survey conducted geological mapping and produced geological maps of the rock units and regional structures at a scale of 1:1,000,000 and 1:125,000. The mapping was completed concurrently with scholarly work by Gordon in 1973, Wakefield in 1974, and Gallon in 1986 which focussed on interpreting the structure and tectonics of the amphibolites hosting the Selebi and Phikwe deposits.

 

6.2.1.2Diamond drilling

 

Drilling was first conducted at Selebi Main in 1964, and was suspended due to poor results (Gordon, 1973). However, drilling resumed, in 1965 confirming improvement of the sulphide mineralization grades with depth.

 

Drilling at the Selebi and Phikwe copper and nickel anomalies continued until 1971, with the subsequent opening of the Phikwe open pit. At the end of this drilling campaign, 124 holes totalling 34,206 m and 73 holes totalling 19,294 m were completed at Phikwe and Selebi respectively (Gordon, 1973).

 

6.2.2Exploration (2005 to 2012)

 

Despite the time that had elapsed since the deposits were discovered, remarkably little exploration took place on the Mining Lease outside of the immediate area of deposits, probably because the company saw no need for surface exploration because additional reserves were easily defined by drilling the extensions of deposits.

 

However, as the new resources became increasingly deeper, the company saw the need for surface exploration. Beginning in 2005, BCL completed airborne geophysics, outcrop mapping, a 2D desktop structural study, a Titan24 DCIP/MT survey, surface and BHEM surveys and diamond drilling.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 32

 

6.2.2.1Surface diamond drilling

 

Diamond drilling was undertaken within the Project area from 2007 to 2012. A two-tier approach was adopted targeting on-mine/brownfields and exploration targets. On-mine drilling was undertaken with the objective of defining down dip and strike extensions of existing operations while exploration work targeted areas outside the mining infrastructure to test geochemical, geophysical, and geological targets in order to delineate stand-alone deposits.

 

A more detailed description of the diamond drilling on the Project can be found in Section 10 of this TRS. As of the effective date of this TRS, PNRPL had not sourced a complete database of regional exploration drilling over the Selebi Mines property.

 

6.3Past Production

 

Construction of the Phikwe processing plant began in 1970, at the same time as the sinking of the Phikwe (#1Shaft) and Selebi shaft (#2Shaft). In 1972, development work at Selebi was suspended in favour of open pit mining at Phikwe. The concentrator began operations in 1973 at a rate of 6,000 tpd, with the capacity increased to 10,000 tpd over time. In 1980, the Phikwe open pit was exhausted and the underground operations at Selebi were phased in. Selebi North Mine was commissioned in 1990. Production at all operations abruptly ceased in October 2016 when BCL was placed in liquidation.

 

A total of 26.6 Mt at grades of 1.03% Cu and 0.58% Ni were mined from Selebi Main between 1980 and 2016, and 13.9 Mt at grades of 0.66 % Cu and 0.74 % Ni were mined from Selebi North between 1990 and 2016 (BCL records and Morgan, 1982).

 

It should be noted that previous production is not necessarily an indication of future production and should not construed as such. The grade and tonnage of produced ore is a function of numerous factors inter alia mining method, operational controls, Mineral Resource shape, size and attitude, and the ability of the mine to control dilution.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 33

 

7.Geological Setting and Mineralization

 

7.1Regional Geology

 

The eastern portion of Botswana forms part of the Limpopo Mobile Belt (LMB) which represents a deep crustal section through an orogenic province between the Kaapvaal and Zimbabwe cratons (Carney et al., 1994). The LMB extends as a broad zone of tectonically deformed and metamorphosed rocks for approximately 900 km, between the stable Zimbabwe and Kaapvaal cratons. Geochronological studies indicate the age of major periods of folding and metamorphism are between 2.0 Ga to 2.69 Ga (Kampunzu et al., 2000).

 

The LMB is divided into three structural zones: two linear zones trending parallel to the belt, the northern and southern marginal zones, and the complex folded central zone (CZ) (Carney et al., 1994). The CZ region is characterized by complex structural fold patterns accompanied by regional and cataclastic metamorphism, with grades ranging from amphibolite to granulite facies and cataclastic tectonites (Carney et al., 1994).

 

The marginal zones are characterized by predominately metamorphosed igneous rocks whereas the CZ contains significant amounts of metasedimentary rocks (paragneisses, metapelites, quartzites, and marbles) coexisting with a variety of deformed and metamorphosed igneous rocks (Kampunzu et al., 2000).

 

The Project area described in this TRS lies in the northern portion of the CZ, just south of an east-northeast trending shear zone marked by the Letlhakane fault, at the boundary between the north marginal and central zones. Figure 7-1 illustrates the regional geological context of the Project area.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 34

 

Figure 7-1
Regional geology
 

 

7.2Local Geology

 

The Project occurs in the Phikwe Complex that is located within the CZ of the LMB, consisting predominately of Archean hornblende bearing tonalitic and trondhjemitic gneisses. The Phikwe Complex also contains the Selebi Phikwe belt of mafic–ultramafic intrusions hosted by medium to coarse grained, massive to weakly foliated, granoblastic to porphyroblastic granite gneiss and a variety of banded supracrustal gneisses comprising hornblende-gneiss, quartzo-feldspathic gneiss, and anorthositic gneiss. The protoliths to the hornblende gneisses are believed to be volcanics and shallow intrusions of tholeiitic basaltic and titanium rich ferrobasaltic composition, whereas the protoliths to the quartzo-feldspathic gneisses may have been calcalkaline volcano-sedimentary rocks (Brown, 1987). Subordinate amounts of pelitic schists, marbles, impure quartzites, and ironstones are also observed. Most of the aforementioned rocks are very sulphide poor (<200 ppm sulphur (S)) (Maier et al., 2008). A map of the local geology is presented in Figure 7-2.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 35

 

Figure 7-2
Local geology
 

 

A few age determinations constrain relationships in the Selebi Phikwe area. Samples of the granite gneisses have been dated at 2.6 Ga to 2.65 Ga (U-Pb SHRIMP method; McCourt et al., 2004). According to Wright (1977) and Brown (1987), the granite gneisses have intrusive relationships with the supracrustal rocks, implying that the latter are older than 2.6 Ga. The absolute and relative ages of the mafic–ultramafic intrusions remain unclear, as lithological contacts are mostly tectonic, however, it is clear that that they are older than 2.0 Ga.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 36

 

7.3Property Geology

 

A schematic geological map of the Selebi Phikwe area and a north-south section across the Selebi Phikwe nickel belt (along dense stippled line) is presented in Figure 7-3.

 

A structural and geological map was developed by Williams (2005) and is the most recent geological and structural map of the Project area (Figure 7-4). The map was developed using a combination of detailed mapping, GIS interpretation of remotely sensed images, integration of existing stratigraphic drill core, and geochemical datasets (Dirks, 2005). Within the Project area, all mineralized zones lie within the Selebi Synformal Basin.

 

The Selebi and Selebi North deposits form part of the Selebi Phikwe belt of intrusions that also contain the Phikwe, Dikoloti, Lentswe, and Phokoje deposits. In all of these deposits, the sulphide mineralization is predominately associated with boudinaged lenses and layers of fine to medium grained amphibolite interlayered with various types of gneisses (Gordon (1973), Wakefield (1976), Key (1976), Gallon (1986) and Brown (1987)). The ore bearing intrusions are generally relatively thin (e.g., on average 11 m in the Phikwe area), however, this may largely be the result of intense folding and shearing (Lear, 1979). The amphibolites predominately consist of hornblende, feldspar, gedrite, and mica. Minor metamorphic orthopyroxene and olivine also occur. Based on whole rock compositional data and Cross, Iddings, Pirsson, and Washington (CIPW) norms of a large number of samples, Brown (1987) estimated that the parental magmas to the intrusions were tholeiitic basalts (with approximately 8 wt% MgO) that crystallized variable proportions of olivine, pyroxene, and plagioclase (Maier et al., 2008).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 37

 

Figure 7-3
Schematic map and cross section of the Selebi Phikwe Area
 

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 38

 

Figure 7-4
Property geology
 

 

The mafic, hornblende rich mineralogy of the Selebi Phikwe host rocks, their association with Ni-Cu mineralization, and their geochemistry has been used to infer an igneous protolith of troctolitic-noritic gabbros locally associated with ortho-pyroxenite (Brown, 1987). Trace element geochemistry suggests a tholeiitic protolith, and the wide ranging and locally high chromium content is indicative of a cumulate intrusive rather than extrusive origin. Geochemical modelling suggests that the parent intrusive body of the Selebi Phikwe deposits was a mixture of cumulus phases (plagioclase, olivine, pyroxene, and chromite), intercumulus liquid, and an immiscible sulphide liquid (Brown, 1987).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 39

 

All of the mined deposits over the Project area are observed within, or at the hangingwall contact of the hosting amphibolite with gneisses. The gneisses forming the country rock of the Selebi Phikwe deposits can be divided into two main groups. The first group is a suite of well-banded hornblende gneiss, grey quartzo-feldspathic gneiss, with anorthosite, minor magnetite quartzite, and marble, and the second group is composed of granitic gneisses.

 

All mineralized horizons are conformable to the gneissic foliation. The contacts of the host amphibolite with the surrounding grey gneiss are conformable but typically sheared, with the development of abundant mica locally in the host amphibolite and coarse cataclastic textures in the grey gneiss (Brown, 1987).

 

Figure 7-5 illustrates the generalized stratigraphic column of the Phikwe Complex.

 

Figure 7-5
Generalized Stratigraphic Column
 

 

7.4Mineralization

 

The following sections are modified from Lungu (2016) by MSA.

 

The Ni-Cu mineralization in the Selebi North and Selebi Main deposits is hosted by hornblende rich amphibolites with varying amounts of plagioclase (labradorite to bytownite), gedrite, phlogopite, biotite, garnet, and sulphides (Gordon (1973) and Brown (1987)). Spinel, olivine, and orthopyroxene have been reported (Brown, 1987). The principal sulphide minerals are pyrrhotite, chalcopyrite, and pentlandite which occur in massive sulphides (70% to 100% sulphides), semi-massive and disseminated/stringer sulphides (up to 30% sulphide). Pyrite occurs as localized overgrowth. Magnetite occurs as rounded inclusions in massive sulphides and as later overgrowths.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 40

 

7.4.1Selebi Main

 

The Selebi Main deposit is an amphibolite-massive sulphide sill one metre to 35 m thick and approximately 2 km along strike. Within the deposit, three distinct interconnected, mineralized horizons were mined: the LOB, the Upper B (UB), and the Upper A (UA). The LOB was considered by BCL to be the eastern limb of an F1 age isoclinal fold plunging 20° towards N10°E that links the UB to the LOB. Towards the north, the UB splits creating the UA, which continues for approximately 150 m before pinching out. From the UA-UB split, the UB sulphide horizon continues, much thinner, for approximately 450 m, eventually changing into a barren amphibolitic schist two metres to three metres thick. BCL considered that hangingwall drag folding formed the UA as well as several minor splits north of the UA (Figure 7 6).

 

The Selebi Main deposit can be divided into two distinct areas. The southern half of the Selebi Main deposit is characterized by thick amphibolite while the north fringe area is composed of multiple sulphide horizons rarely thicker than three metres. In the north fringe area drag folds and a pinch and swell habit within the sulphide horizon are commonly observed. Pinch and swell features, common in the Selebi deposit, are predominately due to D1 boudinage and not a result of D2 folding (Brown, 1987).

 

Figure 7-6
Longitudinal sketch of the Selebi Deposit showing the fold plunge
 
Source:Lungu, 2016

 

Within the UB deposit, the host amphibolites exhibit clear sulphide zonation. Massive sulphides occur at the hangingwall contact. Along the actual contact centimetre scale cummingtonite crystals form an alteration fringe growing into the hangingwall quartzo-feldspathic gneisses. The massive sulphides are underlain by a massive amphibolite consisting of gedrite-hornblende-phlogopite with very little to no plagioclase and stringers of sulphide as well as disseminated sulphide. The gedrite crystals are coarse grained and orientated in the regional mineral lineation, which plunges shallowly to the north. This unit likely represents a highly altered and recrystallized metapyroxenite (Brown, 1987). Progressing into the footwall, the rocks contain increasingly less phlogopite, gedrite, and disseminated sulphide and increasing amounts of hornblende and plagioclase, thus, gradually transitioning into a hornblende-plagioclase amphibolite, i.e., the type of amphibolite that is characteristic within the banded gneiss suite (Dirks, 2005).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 41

 

7.4.2Selebi Central

 

An area termed Selebi Central was identified and explored by BCL. Nickel and copper mineralization occur at a number of positions within the host amphibolite, and occasionally within the hangingwall gneiss. Three zones within the host amphibolite were identified by BCL as follows:

 

●Zone A: Developed at the contact between the hangingwall gneiss and the host amphibolite.

 

●Zone B: Developed generally within the middle of the host amphibolite.

 

●Zone C: Developed at or near the base of the host amphibolite.

 

Of the three mineralized zones, Zone C is the most consistent, covering most of the areal extent of the Selebi Central deposit. Mineralization occurs generally as sulphide stringers or disseminations with grades averaging 0.6 % Ni and 0.7 %Cu.

 

Similar to the Selebi deposit, the Selebi Central deposit dips approximately 40° to the west.

 

The Selebi Central deposit is characterized by narrow zones within a host amphibolite package which ranges in thickness from zero metres to 40 m. Although a Mineral Resource was historically reported for the Selebi Central area by BCL, both MSA and NEXM consider that the narrow discontinuous mineralization does not have reasonable prospects for economic extraction and does not form part of the Mineral Resource for the Selebi Mines.

 

7.4.3Selebi North

 

The Selebi North structure consists of a South Limb that is connected to the North 2 (N2) Limb through an antiformal fold closure (commonly referred to as the fold nose), which is in turn connected to the North 3 (N3) Limb by a second fold structure (Figure 7-7). The fold structures comprise a synformal component and an antiformal component to form two S-shaped structures. The detailed structure has varied from surface with high levels of complexity being observed in certain areas, particularly between N3 and N2. In the upper areas of the mine, the South-Limb-N2 structure was termed the South Limb–N1 structure however the N1 Limb attenuated with depth, the N2 limb became dominant, and the N2 nomenclature was adopted in the deeper areas.

 

The folds plunge to the southwest at approximately 45°, however at depth the South Limb-N2 fold axis veers towards the south. The northern libs to the antiformal structures dip sub vertically, with dips lessening towards the synformal zones. The host amphibolite is conformable with the surrounding grey gneiss. Tight folding within the footwall gneiss is evident close to the amphibolite contacts, however, does not affect the structure and dip of the deposit.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 42

 

Figure 7-7
Relative positions of Selebi North deposit areas
 

 

In the South Limb and N2, massive sulphide lenses commonly 2 m to 5 m wide are concentrated in amphibolite at or near the contact with the hangingwall gneiss. These can continue along strike for several tens of metres and can be traced for longer distances down-plunge, however, have a pinch and swell characteristic. Less continuous lenses of massive sulphide occur with variably mineralized amphibolite away from the hangingwall. The crystalline amphibolite transitions to a schistose amphibolite which is poorly mineralized, although a variably mineralized zone can occur along the footwall contact of the amphibolite with the footwall gneiss.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 43

 

The South Limb dips 35° to 80° south and the amphibolite thickness ranges from 0.10 m on the fringes to 40 m in the central portion. The South Limb deposit is shallow dipping on the eastern extremity and steep towards the fold nose. Two segments can be defined and are separated by an open synformal structure. The western limb is predominately thick massive sulphides with relatively high nickel grades while the eastern limb is predominantly disseminated sulphides and discontinuous lenses of massive sulphides. The strike length of the South Limb in the historically mined areas is approximately 200 m.

 

The N2 Limb dips from 60° to 90° west with mineralization thicknesses ranging from 0.20 m to 3.5 m wide below the 828 m level. Structurally, the N2 Limb is aligned along a shear zone that has resulted in the separation of the N3 Limb and South Limb, however, remains connected to the South Limb through the fold nose. The N2 Limb and South Limb were previously mined and modelled separately, split along the fold nose (Figure 7-7).

 

Economic mineralization in the N2 Limb can be less continuous towards the N3 particularly in the broadly synformal area. Shear structures are observed separating the western limit of the N3 Limb and northern limit of the N2 Limb in places.

 

The N3 limb is characterized by a continuous massive sulphide lens that pinches and swells from a few centimetres to over 5 metres thick. Unlike the South Limb-N2 area, amphibolite is not always present and where is present is discontinuous. Generally, the N3 mineralization is massive sulphide with a footwall and hangingwall gneiss contact and therefore in-situ grades are high, commonly over 2% Ni. A strike length of approximately 300 m was developed on the 828 m level. Dips of the limb vary from 70° N to 90°. There is a marked decrease in grade towards the eastern extremity of the N3 Limb with the mineralization occurring as poorly mineralized to barren amphibolite. The western extremity of the mined area is characterized by an open synform with mineralization thinning out to sub-economic thicknesses in places and a generally increase in amphibolite proportion. Zones of shearing separate the N2 from the N3, however they are connected in places with drillhole evidence suggesting a continuous zone of potentially economic grades and thicknesses.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 44

 

8.Deposit Types

 

The following section is modified from Lungu (2016).

 

The deposits in the Project area are categorized as ortho-magmatic Ni-Cu sulphide-type deposits. They are hosted within amphibolite and understood as a tectono-metamorphically modified tholeiitic magma parents with an immiscible sulphide melt (Brown, 1987) which has undergone all the phases of deformation that have affected the enclosing gneisses.

 

The mineralogical composition of the host rock bodies, the suggested geochemistry of the basaltic intercumulus liquid, and the Ni-Cu content of the sulphide ores are consistent with the formation of the host rocks and sulphide ore bodies from a fractionating tholeiitic basaltic magma that intruded as a liquid mush (Gordon, 1973; Wakefield, 1976; and Brown, 1987) likely between 2,700 Ma to 2,650 Ma ago.

 

Intrusion of the host magma was followed by several phases of deformation and metamorphism which resulted in the ductile dismemberment and folding of the original intrusive complex as well as the massive sulphide lenses. The postulated genesis model (Figure 8-1) was originally suggested by Gordon, and later supported by Brown (Gordon, 1973; Wakefield, 1976; and Brown, 1987). The ages of syn-tectonic granitic gneiss units in the area vary between 2,650 Ma to 2,600 Ma indicating that deformation was concomitant with that recorded in the Zimbabwe Craton to the North (McCourt and Armstrong, 1998 and Jelsma and Dirks, 2002).

 

Both the Selebi North and Selebi Ni-Cu sulphide deposits are associated with an amphibolite layer which occurs within grey gneiss and lesser hornblende gneiss of Unit E of the Selebi Sequence (Brown, 1987). The sulphides mainly occur as massive sulphide, usually containing >70% sulphides with small amounts of silicate inclusions or as disseminated sulphides, usually <30% sulphides, with higher amounts of inclusions. Stringer sulphides are generally thin, <10 cm veins typically crosscutting the foliation in the amphibolite (Brown, 1987).

 

The Selebi Phikwe sulphides have been interpreted as having formed as an immiscible sulphide fluid in a deeper lying, crystallizing, mafic magma body, from which sills were injected to higher crustal levels, transporting the sulphide fluids. The host sill is now metamorphosed to amphibolite. Quartz-feldspar gneisses form the hangingwall and footwall.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 45

 

Figure 8-1
Ore genesis model for the Selebi deposits
 

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 46

 

9.Exploration

 

Exploration work completed by PNRPL from 2021 to September 2026 has consisted of surface and underground drilling supported by the development of an exploration drift and drill bays, the sourcing and digitization of existing historical information, the confirmation of collar and down hole location information of selected holes, and the completion of downhole location (gyro) surveys, televiewer surveys, and surface and BHEM surveys on high priority historical exploration holes. Three small, focused structural modelling studies were completed by SRK at Selebi (Lebrun and Tuitz, 2022), Selebi North (Hrabi, 2024) and the Hinge Zone (Hrabi, 2026). A 3D model of mine workings from 2D level plans and survey information was also completed. A summary is presented in Table 9-1.

 

Table 9-1
Summary of exploration activities

 

Activity Description Dates Contractor

Surface Diamond Drilling

39,181 m to October 16, 2026

17 holes intersected the target horizon

June 2025 and ongoing PNRPL employees assisted by Fusion Drilling
Diamond Drilling Underground at Selebi North 177 holes, 72,655m resource and expansion drilling August 2023 to January 2025 PNRPL employees assisted by Fusion Drilling
Diamond Drilling Regional Targets 11 holes, 2,074 m four VTEM anomalies tested September 2023 to November 2023 & August 2025

Discovery Drilling (2023)

 

PNRPL assisted by Fusion (2025)

Diamond and RAB Surface Drilling 15,074 m, 9 holes intersected the target horizon Mar 2022 to January 2023 Mitchell Drilling
Diamond Drilling and Reaming 60 holes reamed open, 2 holes extended to test amphibolite horizons, 2 wedged holes, 1 abandoned, 1 step-out hole for resource in-fill drilling Oct 2021 to September 2024 Discovery Drilling
Gyro Surveys 62 historical holes plus all new drillholes November 2021 and ongoing Genway/Reflex and PNRPL employees
BHEM Surveys 60 historical holes (includes extensions
33 PNRL surface holes (22 at Selebi Main and 11 regional)
75 PNRL underground holes
April 2022 to September 2026 PNRPL employees using equipment rented from Crone Geophysics
Surface EM Surveys 7 grids covering VTEM anomalies July 2023 to June 2025 PNRPL employees using equipment rented from Crone Geophysics
Televiewer/
Physical Properties Survey
5 holes: 3 historical holes, and two 2022 holes June 2022 to August 2022 Wireline Workshop
Selebi North Mineralization Model Wireframe of folded Selebi North mineralization August 2022 to November 2022.
Updated April 2024
SLR Canada
Structural Modelling Focused structural study at Selebi October 2022 to November 2022

SRK Canada and

SRK South Africa

Structural Modelling Focused structural study at Selebi North February 2024 SRK Canada
Structural Modelling Focused structural study at Hinge Zone May 2025 SRK Canada
Database Management Data entry of assays, lithologies, structural data and verification April 2021 (ongoing) PNRPL employees
Digitization of Mine Workings and Underground Geology Selebi and Selebi North underground infrastructure and stopes at Selebi North. Digitization of geology is ongoing. 2021 (ongoing) PNRPL employees

 

For historical exploration work (pre-2016) completed at the Project, refer to Section 6.2 of this TRS.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 47

 

9.1Digitization of Existing Information

 

Collection, sorting, and digitization of hard copy reports, maps, and drill logs found within the Geology offices at the BCL administration building is ongoing and to date has included:

 

●Scanning and digitization of original drill logbooks including descriptive lithology logging, some structural information, and analytical results of secondary elements (iron, cobalt, sulphur).

 

●Scanning and georeferencing of level plans at Selebi and Selebi North.

 

●Digitization of underground development drilling and channel samples.

 

●Digitization of detailed level plans with mapped mineralization, lithology, and structure.

 

●Georeferencing of surficial maps and surveys.

 

●3D digitization of mine development, ventilation raises, conveyors, production stopes, and ramps has been completed at Selebi and Selebi North. Scanning of geological level plans and digitization of geological and structural data is ongoing.

 

●Digital survey capture of the Selebi North ramp and lowest underground development levels has also been completed by PNRPL. These areas were not previously surveyed because of the sudden closure of operations in 2016.

 

9.2Collar, Downhole, BHEM, Televiewer, and Physical Property Surveys

 

9.2.1Collar Location (DGPS)

 

Location and re-entry of selected existing drillholes with the purpose of confirming collar and downhole survey information commenced in May 2021 and is ongoing. Holes were initially located using handheld GPS units and later confirmed using either Leica GS12 and Leica GS10 GPS units, or Trimble R8 DGPS equipment. A total of 335 collars, including 281 historical holes, have been accurately positioned. In general, only a small deviation from the original historical hole location was observed, with more significant differences noted at Selebi Central. Coordinates were provided in WGS84, UTM zone 35 South, with geoidal heights. Evidence of drilling was observed at a further 99 locations; however, the original collar location was not found.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 48

 

9.2.2Downhole Reaming and Surveying (GYRO)

 

Discovery Drilling, contractors hired by the Project Team, began work in October 2021 to re-open high-priority holes. GEN WAY T/A/Mining Surveying Systems was contracted to provide gyro surveys and AEGIS was contracted to carry out the initial BHEM surveys.

 

The drill arrived on site on October 17, 2021, and hole cleaning continued through October 2023. As of the effective date of this TRS, 60 holes have been re-opened.

 

Gyro surveys utilized the Reflex EZ-Gyro/Sprint Gyro, and due to the vertical nature of the holes, data was collected every 30 m in ‘Multi-Shot Mode’. Readings within each survey are individual and independent of the other readings above and below. Surveys were completed both entering and exiting the hole. As of the effective date of this TRS, downhole survey information has been collected in 60 re-opened holes, and all new drillholes.

 

9.2.3BHEM Surveys

 

The BHEM survey work program using the Crone PEM 3D BHEM system commenced on April 1, 2022, and is ongoing (Figure 9-1). As of September 21, 2026, BHEM surveys have been completed in 168 holes (60 historical surface holes, including extensions and wedges, 33 new surface holes (22 at Selebi and 11 regional) and 75 underground holes).

 

The BHEM surveys utilized the Crone PEM system, rented from Crone Geophysics & Exploration Ltd., in Mississauga, Ontario, Canada, and operated by local Botswana staff trained by Canadian operators. The system consisted of a transmitter powered by a 10 kW generator, a receiver capable of collecting full waveform data, and a three-component fluxgate magnetometer probe.

 

The transmitter loop consisted of a single turn 10-gauge wire placed on the ground; loop size varied from 400 m x 400 m to 1,000 m x 1,000 m and current varied from 10 A to 12 A. Surveys have been carried out using timebases between 50 and 1,000 ms (0.25 Hz to 5Hz). The receiver recorded full waveform data which was delivered at specified time gates. The data has been processed to a calculated residual step response to better quantify the conductive sources. This added processing has been beneficial due to the size of the highly conductive mineralized system.

 

In the current surveys, positional information for the loop and drillhole collars were collected by Drysdale and Associates Ltd or PNRPL employees using differential global positioning system (DGPS) equipment with post-processing using a local base station. Positional information was provided in the UTM projection Zone 35 South utilizing the WGS 1984 datum and the WGS84 geoidal elevation. Data were collected at survey intervals between five metres and 50 m.

 

Interpretation of the results was carried out using Maxwell, a commercially available modelling software package available from Electromagnetic Technologies (EMIT) of Australia. This software uses thin and thick plates to approximate conductive sources.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 49

 

Figure 9-1
BHEM surface map
 

Source: NEXM, 2026

 

The results of the 2022 BHEM surveys at Selebi indicated that the highest conductivity sat at the lower edge of the historical resource outlined by BCL in 2016, down-plunge of the previous mine workings. The 2025 and 2026 BHEM have subsequently outlined this highest conductivity area. The survey results also suggest that: (i) Selebi and Selebi North may be part of one continuous mineralized system, and (ii) there are multiple stacked conductors. The location and orientation of modelled BHEM plates are presented in Figure 9-2

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 50

 

Figure 9-2
Modelled BHEM plates

Source: NEXM, 2026

 

9.2.4Surface EM Surveys

 

Seven surface EM surveys were carried out over six clusters of VTEM anomalies between July 2023 and June 2025. The EM surveys utilized the Crone PEM system, rented from Crone Geophysics & Exploration Ltd. in Mississauga, Ontario, Canada, and operated by local Botswana staff trained by Canadian operators. The system consisted of a transmitter powered by a 10 kW generator, a receiver capable of collecting full waveform data, and an inductive coil mounted on a tripod.

 

Surveys were carried out using a timebase of 50 ms (5Hz). The receiver recorded full waveform data which was delivered in specified time gates. The data has been processed to a calculated residual step response to better quantify the conductive sources. This added processing has been beneficial due to the size of the highly conductive mineralized system.

 

Positional information for the loop and drillhole collars were collected by PNRPL employees using DGPS equipment with post-processing using a local base station. Positional information was provided in the UTM projection Zone 35 South utilizing the WGS 1984 datum and the WGS84 geoidal elevation. Data were collected at survey intervals of 25 m on 100 m spaced lines.

 

Drill targets were defined on four of the seven grids. Results are included in Section 10.1.2.1.

 

9.2.5Televiewer and Physical Property Surveys

 

Televiewer and physical property logging data were collected by contractor Wireline Workshop of South Africa between June 25 and August 4, 2022. Data were collected in three historical holes (sd141, sd119, and sd129b) and two 2022 drillholes (SMD-22-001-W1 and SMD 22 002). A shallow drillhole within Selebi Central was used as a test hole to determine which physical properties were useful to optimize data collection in deeper holes.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 51

 

Logging tools included the optical televiewer (OTV), ultraviolet optical televiewer, acoustic televiewer (ATV), full waveform sonic (FWS), natural gamma (NGAM), magnetic susceptibility (MSUS), density (SSDD), thermal neutron, conductivity, induced Polarization (IP), and resistivity (RLLS and RLLD). Other tools included a caliper to measure variations in hole diameter and a differential temperature probe.

 

9.3Technical Studies

 

9.3.12022 Selebi Main Structural Study

 

Televiewer data from five holes and a drillhole database was provided to SRK (Canada) to identify possible controls on mineralization down-plunge of the historical Selebi Mine, and to determine the relationship between the upper and lower mineralized amphibolite horizons, historically interpreted as two limbs of a tight isoclinal fold.

 

This work was supported by SRK (South Africa) through a review of drill core and underground exposures on site.

 

Through this work, no evidence was found for folding that could duplicate mineralization by tightened limbs or thicken mineralization within hinge zones; however, the following principal observations were made:

 

●Most mineralized zones are either bound or spatially associated with shear zones or fault breccias.

 

●Visible folding is rare and found outside mineralized zones.

 

●The distribution of alpha angles related to foliation/layering highlights structural domains and can be used to identify fold hinges.

 

●The upper portions of the holes are in a low alpha angle domain.

 

●The lower portions of the holes are a moderate to high alpha angle domain.

 

●The transition between the two domains is sharp, suggesting southwest dipping shears subparallel to mineralization (approximately 40° towards 210°, mine grid).

 

Televiewer data identified two main orientations of foliation/layering dipping at approximately 76° from one another in opposite directions. The main set is sub-parallel to foliation and oriented 55° towards 204° (mine grid) and a minor set is oriented around 22° towards 000° (mine grid). Field work is required to understand the characteristics of the minor set.

 

Televiewer data showed that the intersection of the high and low alpha angle domains produced a shallowly northwest plunging lineation of 15° towards 286°, which is coaxial with the plunge of mineralization in the historical Selebi Mine (15° towards 292°), suggesting the plunge of the mineralization is controlled by structure bounding the low and high alpha domains and/or their splays.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 52

 

Folding was mostly observed in the leucocratic neosome layers; folded layers were likely less competent than the surrounding rock and were preferentially buckled forming drag or possible sheath folds.

 

The plunge of mineralization in longitudinal section is approximately 15° towards 292°. Two moderate southwest dipping shear zones are interpreted to control the distribution of anomalous copper grades; mineralization thickens at their intersection (approximately 15° towards 280°), which is subparallel to the mineralization plunge at the historical Selebi Mine.

 

9.3.22022 Selebi North Structural Study

 

In 2022, in preparation for the underground drill program at Selebi North, SLR modelled the fold structure at Selebi North using drillhole data and selected level plans. This geometry was extrapolated down plunge and used to assist in drill planning. Some of the early drillholes did not intersected mineralization where the model predicted and SRK (Canada) was asked to review the information for ongoing drill planning.

 

The SRK desktop study used PNRPL’s oriented core data and geological mapping on mine level plans. The oriented core data for contacts and foliation were found to be inconsistent with the modelled N2 Limb. SRK interpreted the Selebi North structure to have complex moderate scale folding with better continuity down plunge and lower continuity along limbs, resulting in a down plunge variation in the width of mineralized domains. The geometry of the mineralized domains is modified by shearing along the limbs, and the shearing overprint locally cuts out mineralization on the limbs of folds (Hrabi, 2024).

 

9.3.32025 Selebi Mines Structural Study

 

In preparation for drilling the 2 km gap between the Selebi North and Selebi Main deposits, the Company commissioned a structural study to assist in drillhole planning. SRK (Canada) visited site May 2-13, 2025, and mapped at 23 stations in the lowest levels underground at Selebi North and Selebi Main and made observations on 22 drillholes.

 

A distinctive sequence was observed in both drill core and underground between the sulphide horizons at the N2 hinge. A sharp bounded contact marked by high strain divides the HW gneisses from the amphibolite and sulphide horizons. On the footwall side the sulphides are irregularly distributed with many examples of xenoliths of amphibolite and sulphide mutually engulfing one another.

 

SRK concluded that the down plunge extent of the Selebi North N2 closure remains open and the down plunge continuation of the Upper and Lower Selebi Main zones project to the west towards the projection of the South Limb eastward and the geometry of the domain between these zones should be defined through drilling.

 

9.3.4Petrological Studies by Peter Lightfoot

 

Between September 2023 and October 2026, consulting geologist Peter Lightfoot of Lightfoot Geoscience Inc. (LGI) carried out nineteen focused studies on the Selebi Main and Selebi North Ni–Cu–Co deposits for NexMetals Mining Corp. The work progressed from a review of historic studies and a site visit in 2023, through mineralogy and mineral chemistry in 2024 and geometallurgy in 2025, to a re-examination of the full 2026 drillhole compilation and a report on the igneous protolith (Lightfoot, 2026). Key findings include:

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 53

 

Nickel tenor studies: Nickel tenor (nickel content recalculated to 100% sulphide) is the same across textures and between amphibolite and gneiss hosts, so it is a robust magmatic signature. Studies have shown that the apparent low tenor population is actually chalcopyrite dilution. With copper-corrected tenor, the 2026 compilation shows a uniform 2.96–2.97% Ni in copper-free sulfide, with no change from surface to 2,017 m downhole depth. Instead, tenor varies laterally; three compact domains, two at Selebi North (around SNUG-23-013 and SNUG-24-077) and one in the Flexure Zone of Selebi Main, run 3.21–3.44%.

 

Mineralogy studies: The mineral assemblage is pyrrhotite–pentlandite–chalcopyrite throughout the host-rock series, with magnetite and minor pyrite. Pentlandite occurs as granular grains, as loops around pyrrhotite and as fine flames within it. Pyrrhotite carries 0.29–0.95% Ni, varying within single samples, possibly because hexagonal and monoclinic pyrrhotite are intergrown. Pentlandite carries about 35% Ni and 1.6–2.2% Co, with cobalt rising as nickel falls; Ni/Co in pentlandite is about 16 at Selebi North and 22 at Selebi Main. Platinum-group metals are depleted.

 

Host Rock studies: The 2026 work quantified the host amphibolite at 10–12% MgO. The thickest, most magnesian ultramafic intervals lie in the under-drilled structural keel between Selebi and Selebi North, which is identified as a drilling target. Immobile-element ratios show that both deposits are parts of one intrusion fed by one chromium-poor, crust-contaminated tholeiitic magma.

 

Deposit Analogy: The Thompson Nickel Belt was presented as an analogue. At Thompson, komatiitic magma intruded sediments on a rifted continental margin and picked up sulfur from sulfide-bearing sediments, forming nickel sulfide. Later thrusting and folding moved the soft sulfide, so the ore now sits in fold structures rather than where it first formed. The talk introduced two ideas later applied at Selebi: a productive sedimentary horizon that hosts the intrusions, and structural stacking that thickens the ore.

 

9.3.5Data Management and Drillhole Re-Logging

 

The original drillhole database provided by BCL was limited to broad lithological units and nickel and copper assay results for Selebi Main and Selebi North. Handwritten detailed lithology logs and analytical results for cobalt, iron, and sulphur, in addition to nickel and copper were located and have been scanned and digitized. Examination of core and relogging of the BCL historical holes is ongoing. In total, there are 296 Selebi Main and Selebi North surface holes and 152 Selebi Central holes, and 4,164 underground holes. Underground holes are not available for re-logging. As part of this work, errors related to collar elevations and from and to readings were identified and corrected.

 

9.4Exploration Potential

 

The exploration potential of the Selebi Mine is based on the hypothesis that the mineralizing systems which supported the Selebi North and Selebi Main mines are connected at depth. Exploration efforts by PNRPL indicate potential for mineralization continuity along strike, down dip and down plunge of the historical mine workings.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 54

 

Interpretation of the geophysical (BHEM) anomalies, televiewer surveys, structural modelling and surface drilling supports the hypothesis that the Selebi Main and Selebi North deposits are connected at depth and may represent a continuous system of mineralization.

 

The conductivity defined to date through BHEM surveys correlates well with known Ni-Cu mineralization intersected in drillholes.

 

The plunge of the Selebi North mineralization is shallowing at depth and also turning toward Selebi Main, providing the first geological evidence that the two deposits could join at depth. Mineralization remains open at depth at both the Selebi Main and Selebi North deposits, and there is potential to establish Mineral Resources in the gap.

 

The borehole geophysics has been very successful in imaging highly conductive metallic mineralization along the down-dip structure and early tests support the possibility that the two deposits connect over a length greater than 2,000 m within a single mineralized system and that mineralization may be present in at least two mineralized amphibolite hosted horizons identified as the Upper Interval and Lower Interval.

 

The 2022 and 2026 drill programs at Selebi Main have resulted in 23 new intercepts of mineralized amphibolite over a down-plunge distance of 1,500 m. The new mineralization remains open at depth and shows that there is potential to increase the size of the resource. Recent drill results in SMD-25-205, SMD-26-209 and SMD-26-212-W1 returned greater than 10 m intervals of massive sulphide. With the exception of sd119, these thicknesses are wider and more consistent than the results reported from the historical drilling, confirming up-side potential. This thickening down dip towards the down-dip extent is the primary reason for the increase in tonnage between the current MRE and the 2024 MRE (see Section 14.1).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 55

 

10.Drilling

 

In addition to reaming described in Section 9.2.2, PNRPL has drilled 235 drillholes, including wedges and abandoned holes, on the Project as of the effective date of this TRS. Drilling completed by the historical and current operators is summarized in Table 10-1, shown in Figure 10-1, and described below. The historical summary is not considered to be complete, and, at minimum, is missing some regional exploration target drilling completed by BCL.

 

In addition, PNRPL has added from historical records 1,789 channels totalling 2884.65 m at Selebi, and 3,035 channels totalling 12,503.52 m at Selebi North.

 

Table 10-1
Summary of drilling

 

Deposit Surface RAB3 Drill Holes Surface DDH4 Drill Holes Underground Drill Holes
Operator Count Length
(m)
Count Length
(m)
Count Length
(m)
Selebi
Historical (BCL)     134 104,156 2,619 86,696
PNRPL 2 707 501 51,852    
Total 2 707 184 156,008 2,619 86,696
Selebi North
Historical (BCL)     151 86,607 1,642 55,221
PNRPL     52 1,174 177 72,655
Total     156 87,781 1,819 127,872
Selebi Central
Historical     152 65,018    
Total     152 65,018    
Regional
Historical     43 21,863    
PNRPL     11 2074    
Total 57 5,220    
Notes:
1.Of these 50 drillholes, nine totaling 3,838 m, are wedged from a pilot hole.

 

2.Of these 5 holes, 4 holes totaling 821m, were wedged from the pilot hole. None of the holes reached target depth.

 

3.This table is not considered to be complete, and, at minimum, is missing some historical regional exploration target drilling.

 

4.RAB = Rotary Air Blast

 

5.DDH = Diamond Drill Holes

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 56

 

Figure 10-1
Drillhole collar locations
 

Source: NEXM, November 2026

 

10.1.1Historical Drilling

 

10.1.1.1Early drilling (1964 to 1994)

 

The earliest diamond drilling on the Project area is reported to have been completed in 1964 (Lungu, 2016). Gordon (1973) reports that by the end of 1971, drilling on the Selebi targets totalled 73 holes for 19,294 m. Drilling is reported to have continued between 1980 and 1994 to confirm the down-dip and northerly continuation of the mineralization at Selebi (Lungu, 2016).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 57

 

Documentation related to this early diamond drilling was not available for review. The MSA QP is not aware of the sample preparation, analyses, and security procedures followed for the drilling completed prior to 2007.

 

A summary of historical intercepts beyond the existing Selebi Main MRE is included in Table 10-2 and demonstrate existence of mineralization in a potentially contiguous area outside of the current MRE. Both sd133 and sd138/b fall along the down plunge extension of the existing Mineral Resource area, whereas sd134/b and sd135/b lie to the north and are predictably of relatively low grade and thickness.

 

Table 10-2
Summary of historical intercepts outside the MRE area

 

Hole ID From
(m)
To
(m)
Intercept Length
(m)
Estimated True
Thickness1
(m)
Grade
(% Cu) (% Ni)
sd133 1559.10 1560.30 1.20 1.09 1.14 1.57
sd134 1254.60 1256.18 1.58 1.49 0.58 0.55
sd134b 1253.62 1255.48 1.86 1.76 0.90 0.30
sd136 1301.24 1302.81 1.57 1.44 0.45 0.54
sd136b 1302.22 1304.07 1.85 1.75 0.30 0.23
sd138 1509.10 1513.70 4.60 4.52 2.01 0.54
Incl. 1511.10 1513.70 2.60 2.56 3.19 0.85
Incl. 1511.10 1513.10 2.00 11.97 3.96 1.05
sd138b 1508.30 1509.2 0.90 0.87 2.51 1.64

Note: Estimated true thickness is based on the drillhole intersection angle with average dip and strike.

 

10.1.1.22007 to 2010

 

Diamond drilling was undertaken within the Selebi area from 2007 to 2010. A two-tier approach was adopted targeting on-mine/brownfield and greenfield targets. On-mine drilling was undertaken with the objective of defining down dip and strike extensions of existing deposits while greenfield work targeted areas away from the mining infrastructure.

 

Greenfield drilling was conducted on areas a considerable distance from the mining operations but within the Project area. The sole purpose of this drilling was to delineate new standalone ore bodies. Drilling was undertaken at nine sites as follow-up to combinations of geophysical, geochemical, and geological anomalies.

 

Selebi Main

 

One drillhole, sdn145, from the post 2007 period is within the current Mineral Resource area close to the currently drilling defined down-plunge limit. This intersected two zones of mineralization. Note that true thicknesses are estimated based on intersection angle with modelled mineralization.

 

●sdn145

 

◌1517.90 to 1520.05 m; 0.17% Cu and 0.54% Ni over 2.15 m drilled length (2.08 m estimated true thickness); and

 

◌1578.00 m to 1580.75 m; 1.95% Cu and 0.30% Ni over 2.75 m drilled length (2.69 m estimated true thickness).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 58

 

Selebi Central

 

On-mine or brownfield drilling within the current Selebi Mining Licence was focused at Selebi Central. Drilling at Selebi Central commenced as follow-up to a VTEM anomaly. A total of 65,018 m was drilled in 152 holes, testing the area along strike from Selebi Main and Selebi North at depths ranging from 49 m to 1,358 m over an area of approximately 4,500 ha.

 

Selebi Central mineralization ranges from massive to disseminated sulphides hosted by amphibolite with an average thickness of one metre. Selebi Central forms the link between Selebi Main and Selebi North with the Selebi Central deposit joining the Selebi deposit at depth and Selebi North on strike to the north.

 

Selebi North

 

All of the drilling at Selebi North completed by BCL from 2007 to 2010 is within the currently defined extent of the Mineral Resource.

 

10.1.2Current Drilling

 

Surface drilling by PNRPL has to date consisted of testing the down dip extension at Selebi Main, testing the 2 km gap between Selebi Main and Selebi North, and a limited number of regional exploration drillholes. Drilling from underground at Selebi North was infilling and expansion drilling.

 

10.1.2.1Surface drilling

 

Selebi Project (March 2022 to January 2023)

 

Surface drilling at the Project was completed by contractors to PNRPL from March 14, 2022 to January 23, 2023. The primary purpose of the program was to test the down plunge extension of mineralization at Selebi Main. In total, PNRPL completed 24 diamond and two rotary air blast (RAB) surface drillholes (including wedges) totaling 15,074 m. A summary of significant intercepts at Selebi outside the defined Mineral Resource area is presented in Table 10 3.

 

Regional exploration (2023)

 

Concurrently with the underground drill program at Selebi North, the regional potential of the Selebi Mining Licence was evaluated through drilling of three, previously untested EM anomalies. A total of 10 drillholes were completed using a Boyles 56 drill retrieving NQ (47.6 mm) diameter core, totaling 1,852.89 m.

 

Mineralization was encountered in eight of the 10 holes, and with BHEM, demonstrated that the conductive sulphides were the source of the EM anomalies. Although no economically significant grades and widths of Ni-Cu mineralization were intersected, these results have established the presence of additional sulphidic horizons that warrant further exploration for down-dip and down-plunge potential. Stratigraphy similar to the Selebi deposit was intersected in SMWD-23-045 at VTEM Anomaly 5, located 1.5 km west of Selebi, where a 10 cm sulphide interval returned an assay of 0.77% Ni and 0.80% Cu. This hole targeted the near surface southern extent of a weak conductor with a 400 m down plunge extent that remains untested at depth.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 59

 

Surface exploration (2025-2026)

 

In January 2025, two of the three Zinex U5 drills that were operating underground at Selebi North were brought to surface and converted to surface A5 drills. Additionally, the company purchased a Marcotte HTM2500 drill capable of drilling to depths of 2,550 metres (NQ core). In January 2026, the third Zinex U5 was converted to a surface A5 rig and a second Marcotte HTM2500 drill was purchased by the Company. These drills were operated and maintained in-house using support from Fusion Drilling of Hawkesbury, Ontario, Canada.

 

The initial drilling program tested the two-kilometre gap between the Selebi Main and Selebi North deposits. Drilling then focused on the area down-dip of Selebi Main, called the Flexure Zone. To September 21, 2026, the data cut-off date, a total of 37,188 m in 28 holes were completed.

 

This drill program successfully intersected significant intervals of mineralization down-plunge of Selebi Main and defined a 1.5 long trend of thicker massive sulphide intersections.

 

Of significance are the results of SMD-25-202 and SMD-25-204, drilled in the 2 km gap between Selebi and Selebi North, shown in Table 10-3. These holes showed narrow intervals with low copper grade and high nickel grade in the upper intercept and narrow intervals of high copper grade and lower nickel grade in the lower intercepts.

 

Table 10-3
Summary of 2025 intercepts in the 2 km gap between Selebi and Selebi North

 

Hole ID From
(m)
To
(m)
Intercept Length
(m)
Estimated True
Thickness1
(m)
Grade
(% Cu) (% Ni)
Hinge Zone – 2 km gap between Selebi and Selebi North
SMD-26-202 1753.95 1754.65 0.70 0.63 0.81 2.39
SMD-26-202 1773.20 1773.70 0.50 0.45 6.33 0.64
SMD-26-204 1853.95 1854.30 0.35 0.31 0.42 2.40
SMD-26-204 1855.65 1856.50 0.85 0.76 4.29 0.95

Note: 1Estimated true thickness is based on a correction of 90% from drilled length.

 

Regional exploration (2025)

 

Using the A5 drill owned and operated in-house with assistance from Forage Fusion Drilling, one NQ sized drillhole tested a VTEM and Surface EM anomaly located on the west side of the Selebi Basin. BHEM confirmed the anomaly to be caused by a fault.

 

10.1.2.2Underground drilling (July 2023 to January 2025)

 

The 2023-2025 Selebi North Underground (SNUG) drilling program was initiated in August 2023 by Forage Fusion Drilling Ltd. of Hawkesbury, Ontario, Canada, who provided three Zinex U-5 drills and training of local operators. The purpose of this ongoing underground drilling campaign is to extend and infill existing mineralization in support of a MRE at Selebi North. To date, drilling has been conducted on levels 935 mL, 925 mL, 895 mL, 880 mL, and 810 mL, and 37,953 m of drilling has been completed in 177 holes, recovering BQTK (40.7 mm) diameter diamond drill core. Analytical results of the lower intersection in SNUG-25-200, located 155 m outside the MRE are shown in Table 10 4. The intersection indicates that the geometry of N3 is consistent with the geometry at higher levels.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 60

 

Table 10-4
Summary of PNRPL intercepted mineralization at Selebi North outside MRE area

 

Hole ID From
(m)
To
(m)
Intercept Length
(m)
Estimated True
Thickness1
(m)
Grade
(% Cu) (% Ni)
N3 – step out drilling
SNUG-25-200 633.30 633.65 0.35 - 0.91 0.88
Notes:
1.True thickness cannot be estimated because of the low density of drilling.

 

10.2Historical Drilling and Handling Protocols

 

The following section describes work undertaken by former operator BCL from 2007 to 2016.

 

10.2.1Surface Drilling

 

The following is taken from Lungu (2016).

 

Routine procedures were completed to a reasonable standard for the data to be acceptable for use in the interpretation of the geology and modelling of the mineralization. All data acquisition protocols, outlined below, were completed, or supervised by non-registered but adequately qualified BCL geologists and surveyors.

 

10.2.1.1Collar and down hole surveying

 

Collar positions were surveyed using a Trimble Differential GPS, models XT and XP, with ± 10 cm and ± 50 cm precision, respectively by qualified BCL geologists. Some collar positions were surveyed using Leica Total Station by qualified BCL surveyors.

 

Except for a few holes, downhole surveys were carried out immediately upon completion of a drillhole, by an external contractor using either the Reflex EZ-Shot or Gyro survey tool. Holes prior to 2007 were surveyed using a Sperry Sun multishot downhole camera. Both the Reflex EZ shot and the Sperry Sun rely on magnetic north.

 

In some cases, a time lag between drillhole completion and downhole survey opportunities rendered the survey impossible as holes collapsed in the interim period. These holes were flagged in the database and excluded from any Mineral Resource estimation work.

 

Where core orientation was measured, it was completed using a spear core marking tool.

 

10.2.1.2Core logging

 

All core logging was completed by degree qualified BCL geologists. Core was logged on paper log sheets and later uploaded in Century System’s Fusion database (now owned by Datamine). Core logging included identification of lithology, structure, alteration, mineralization, core recoveries, and other notable characteristics. Geotechnical logging was completed on selected holes.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 61

 

Core was initially cleaned and metreage marked before delineating lithological contacts and marking sample intervals. Sample intervals were drawn based on different petrological and physical characteristics of each sample length.

 

All cores were photographed with the start, end and intermediate intervals clearly marked on each box. Core was photographed after sampling and marked clearly before storage.

 

The MSA QP considers the lithological logging procedures for BCL surface exploration holes to be consistent with standard industry practice.

 

10.2.1.3Core recovery

 

Qualified, non-registered BCL exploration geologists regularly monitored core recoveries by daily visits to the drill rigs. Core recovered was reconciled at the drill rig and then entered into formatted Microsoft Excel spreadsheets.

 

The drilling contract stipulated 100% core recovery with ±5% deviation. Where anomalies were observed, immediate corrections were sought from the drillers. The recoveries for mineralized zones were good, ranging from 90% to 100%. Most of the lithologies in the Project area were competent gneisses which yielded good recoveries. There were only a few scenarios where core was lost due to collapsing formations or bad ground. In the weathered zone, to approximately the first 50 m below surface, core recoveries were generally poor and holes were commonly steel cased to avoid collapse.

 

Core recovery is generally high (above 95%) in the host lithology and core losses are therefore considered to have minimal effect on the quality of the Project drillhole database.

 

10.2.1.4Core sampling

 

The BCL standard operating procedures required sampling of the entire amphibolite host plus a minimum length of one metre in the hangingwall and footwall lithologies. The minimum sample length for exploration samples was set at 0.3 m, although approximately 7% of samples in the database are shorter than this threshold. Approximately 95% of all samples at Selebi are sampled at or below 1.5 m length. Chosen sample length was at the discretion of the logging geologist and selected based on the style of mineralization and whether the sample was within or adjacent to visible mineralization.

 

Samples were marked directly on the core, which was cut and split longitudinally using a diamond saw. Sample bags and ticket books were prepared prior to sample cutting. Core was cut from bottom to top (down hole to up hole) with the orientation line facing vertically upwards. One core half was submitted for analysis in most cases, however, where a resubmission was requested, the remaining half core was quartered, and a quarter was sent for duplicate or re-analysis.

 

The MSA QP considers the sampling procedures for BCL surface exploration holes to be consistent with standard industry practice.

 

10.2.1.5Core photography

 

Two photographs of core were taken, one wet and one dry, prior to core cutting. After cutting the procedure was repeated.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 62

 

10.2.1.6Sample shipping

 

Following the review of the relative density results by the geologist, a BCL technician completed the following steps prior to sample shipment to the laboratory:

 

●Secured the individual sample bags with cable tie to avoid sample loss.

 

●Packaged smaller secured bags into 430 mm x 760 mm x 250 mm plastic bags.

 

●Secured large bags with cable ties for added protection.

 

●Prepared sample dispatch documents (analytical services request sheet) in duplicate that listed sample numbers, elements to be analysed, and any other instructions.

 

●Transferred samples to a BCL driver for transportation to the onsite laboratory.

 

10.2.1.7Core and sample storage

 

It was a statutory requirement that all core obtained from exploration drilling be kept in storage for future reference. All BCL core was thus stored at the BCL core shed at the Phikwe Mine site.

 

All production pulp and coarse rejects from the BCL laboratory were kept in storage at the laboratory for three weeks before they were discarded. Coarse rejects from surface exploration campaigns were returned to the geology department and kept in secured storage at the core shed for one year after the campaign prior to being discarded.

 

10.2.1.8Database

 

Data were stored in Century System’s Fusion database (now owned by Datamine).

 

10.2.2Underground Drilling and Channel Sampling

 

The following is modified from Lungu (2016).

 

Underground drilling was used for either ore body profiling, grade control, hazard identification, and/or service holes. Drilling information was collected by BCL diamond drill crews consisting of a Foreman, Miner-in-Charge, Operator and Workman. BCL underground drilling used an AXT bit size (48 mm diameter hole and 33 mm core) for core sampling. Diamond drilling was carried out with slow rotation and gentle pressure with water used to lubricate and cool the bit. The U2 and U3 Pneumatic Kempe Diamond Drilling machines were used at the BCL underground mines to drill AXT size holes. The smaller sized U2 machine was predominantly used in stone raises for pre-stoping evaluation drilling (footwall delineation) while the larger U3 machine was used for all other exploration drilling including haulage exploration drilling, cover drilling for water and other service holes.

 

The drilled core was extracted and placed in core boxes, which could hold up to six metres of core. The core boxes were then transported from the drilling sites to the Geology core yard on surface where core logging was undertaken. Drillers were trained to take extra care when drilling through structurally weak ground caused by faulting and shearing.

 

Geologists planned and designed diamond drilling layouts, providing the drill site information, site name, location, measurements with reference to the nearest pegs, planned metres, borehole inclinations, and identities. It was the responsibility of the driller to track the progress of the drillhole and report the progress to the shift boss. The section geologist also checked this progress daily to verify the expected target. A copy of the drill layout was provided to the surveyor for collar survey to be completed. The daily drilling progress was captured on the drill ledger and any problems highlighted for prompt resolution.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 63

 

Underground borehole spacing along strike at Selebi Main was generally as fans 25 m apart along the footwall development. Up to eight holes were drilled from each position at various angles (-20° to +90°) generally close to perpendicular to the strike. Drilling was also carried out from secondary developments such as stope-raises and sill-drives where the deposit was not fully exposed from footwall contact to hangingwall contact.

 

At Selebi North, horizontal fan drilling from footwall development was carried out to guide drill-drive positions. Drilling into the sidewalls was completed where the drill-drives did not expose the full thickness of mineralization, predominantly into the footwall. Twelve drillholes were drilled by BCL steeply downwards from an underground exploration drilling drive; sn29001, sn29004 to sn29009 and sn29050 to 29054. Drilling employed a U8 Diamec drill rig for drilling BQ holes (56 mm diameter) up to 300 m long. Drilling was performed from the 810 m level hangingwall exploration drive to confirm the down dip extension of the South Limb and N2 beyond the 850 m level resource model limit to the 1,100 m level and were surveyed down-the hole.

 

At the drill site, drilled core was placed in secure core boxes capable of storing up to six metres of drilled core. The core boxes were then transported by the BCL drilling crew from the underground drilling site to the Geology surface core yard.

 

Core logging was undertaken by qualified BCL geologists. Core was logged in appropriate detail including identification of lithology, structure, alteration, mineralization, and other notable characteristics. A geologist identified and marked the section of the core to be sampled. The entire host rock amphibolite was sampled together with one metre of the adjacent footwall and one metre of the adjacent hangingwall gneiss.

 

Channel sampling was performed underground predominately from stope raises mined on dip, along the hangingwall contact or drill/sill drives mined within the mineralization exposing the hangingwall contact. These were predominately used for grade estimation for the mining stope, however at Selebi North, combined with the extension drillhole into the sidewall, where required, they were routinely used for resource estimation. Channel sampling used an air powered diamond saw with rotating diamond impregnated blades. A 5 cm wide groove was cut across the exposure and one metre into the hangingwall or footwall gneiss where exposed. The sample between the grooves was chipped out, placed in numbered plastic bags and assayed at the BCL laboratory. Sampling was carried out by dedicated sampling teams with supervision and quality control of the channel sampling by the mine geologists.

 

10.2.2.1Collar and down hole surveying

 

Underground drillholes were surveyed for the collar position and orientation using a Total Station Theodolite instrument, with a ±20 mm accuracy. The survey was carried out by trained BCL surveyors. Shorter holes drilled for ore body delineation were not routinely surveyed downhole. These holes were generally less than 50 m long, and it was assumed that no deviation occurred that warranted downhole surveying.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 64

 

Longer underground exploration holes drilled using the U8 Diamec drill at Selebi North were downhole surveyed by an external contractor, using the AUSLOG Model A698 nonmagnetic gyroscope with survey readings every 20 mm. The output survey log was then composited to provide readings over specified intervals, e.g., every 10 m, depending on any observed deviations.

 

10.2.2.2Core logging

 

Qualified BCL geologists recorded lithology, structure, alteration, mineralization, and other notable characteristics on BCL geology log sheets for each drillhole. Core photographs were taken on some drillholes. Below are the logging stages completed by the geologist:

 

●Core laid out on logging table.

 

●Metreage marking for core recovery.

 

●Detailed logging for lithology and mineralization.

 

●Core marking for sampling.

 

After the manual logging was completed as detailed above, the BCL geologist digitally captured the logging details in the Fusion Database using the DHLogger interface. Apart from being used for resource modelling, ore delineation drilling was used to inform the ore production department on ore body position and size to allow them to plan for eventual extraction. The logging detail thus captured was limited to defining the ore body and was sufficient for resource modelling and estimation, however, was of insufficient detail to permit detailed lithological or mineralogical studies.

 

10.2.2.3Core recovery

 

Core recovery reconciliation was completed during the logging process to check the discrepancy between the drilled metres and the recovered metres. Intersections used in BCL resource estimation should have a core recovery of at least 95%. Geotechnically, the Selebi Mines rock quality designation was generally high given the competent lithologies drilled through, e.g., gneissic footwall and hangingwall and amphibolite host. The core recovery within the mineralized zone was generally above 90%. Drillholes with low core recovery, mostly encountered when drilling through weak fracture zones, were not captured for resource estimation.

 

Drillers were always advised to drill slowly when experiencing blockages encountered when drilling through fractured or weak zones. In rare occurrences, where excessive core recovery was experienced, attempts were made to determine the reason during onsite core inspection by the geologist.

 

Core losses were generally very low and therefore not likely to affect the outcome of the MRE.

 

10.2.2.4Core sampling

 

Underground ore delineation drill core was subjected to whole core sampling over a variety of lengths as dictated by lithological contacts within the host rock. The main purpose of core sampling was to collect a sufficient number of representative samples to support resource evaluation and estimation.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 65

 

Sections of the core to be sampled were marked in red/white wax-based markers during logging. The entire host rock (amphibolite) was sampled together with at least one metre into the hangingwall gneiss in contact with the host, and similarly on the footwall gneiss. The minimum and maximum lengths of samples are 0.15 m and one metre, respectively.

 

All drill cores arising from underground ore delineation drilling were not split prior to sampling and density determination and grade analysis were completed on whole AXT size core.

 

Underground exploration core, drilled using the U8 Diamec drill rig at Selebi North, was first marked for sampling and then cut in half using a diamond saw. One half was sampled for density determination and grade analysis. The other half was kept in storage for future reference and re-submission, if required.

 

10.2.2.5Core photography

 

Drill core was not routinely photographed unless the responsible geologist required a photo of the core for discussion or reference.

 

10.2.2.6Sample shipping

 

Underground samples were transported to the laboratory using the same procedures as the surface samples.

 

10.2.2.7Database

 

Underground data were stored in a Fusion database.

 

10.3PNRPL Drilling and Handling Protocols

 

10.3.1Surface Drilling

 

The drill rigs were positioned on prepared drill pads over a surveyed and pegged collar location and oriented by alignment by positioned front sights. The drill head was then fine-tuned and set to the desired azimuth and inclination utilizing a Reflex TN-14 gyrocompass instrument (±0.2 azimuth latitude dependent and ±0.05° dip latitude dependent). Inclination was double checked using an inclinometer.

 

Holes were cased with HW casing through overburden or cored with PQ (85.0 mm). Once the core barrel was through the overburden, a reduction to recover HQ sized core (63.5 mm) was completed through the weathered zone until seated in competent rock and beyond. Depth of weathering typically ranged from 15 m to 30 m. The top of the hole was drilled using HQ sized rods, typically 100 m in recent drillholes, and up to 700 m in 2022 drillholes, then the rod string was reduced to pass through the HQ rods and drilled to target depth recovering NQ core (47.6 mm). For selected deep holes drilled by the Zinex A5, the rod string was further reduced to recover BQ core (36.5 mm).

 

Upon completion of the hole, the BQ and NQ rods were fully extracted, and HQ rods were extracted to a depth of between 9 m and 12 m beyond the base of weathering in order to keep the hole open for possible borehole surveys or re-entry. The HQ rod strings were capped (welded) with a steel base to prevent sinkage during rainy seasons.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 66

 

The drilled core was extracted and placed in metal core boxes, which, depending on core diameter, could hold up to five metres of core (NQ). The core boxes were then transported from the drilling sites to the geology core yard where core processing and logging was carried out by qualified PNRPL geologists.

 

10.3.1.1Collar and down hole survey

 

Collar positions were initially surveyed by external contractor, Drysdale and Associates Limited (Drysdale) of Francistown, Botswana, using a Leica Differential GPS system with current Leica Blue Certificates and provided to PNRPL in WGS84 coordinate system, UTM zone 35 South format with geoidal elevations. Collars are currently surveyed by trained PNRPL operators using a PNRPL owned Trimble R8 Differential GPS with ±0.08 cm horizonal precision and ±0.15 cm vertical precision.

 

Downhole surveys were carried out by Mitchell personnel using a Reflex EZ-Gyro and a Reflex Sprint IQ Gyro (±1.0° Az and ±0.3° dip, which are latitude dependent). Systematic readings, taken approximately every 30 m, tracked the hole trace so directional wedges could be used to redirect the hole if needed. Immediately upon completion of a drillhole, a PNRPL employee surveyed the hole using an alternate Reflex Sprint IQ instrument in continuous “sprint” mode, set to take readings every five metres.

 

Readings were taken when the survey tool was lowered, and a new hole survey was completed on the way up. The “in” and “out” surveys were compared to ensure the instrument was functioning properly and as an additional validation step. Reflex software automatically compares the two surveys, and the survey is considered successfully ‘closed’ if the difference is <1% between the two surveys.

 

Oriented core measurements were made at the drill by Mitchell personnel using a Reflex ACTIII tool.

 

10.3.2Underground Drilling

 

The underground drill rigs are positioned in drill bays, and the drill head is set to the desired azimuth and inclination utilizing a Reflex TN-14 gyrocompass instrument (±0.2° azimuth latitude dependent and ±0.05° dip latitude dependent) and double checked using an inclinometer.

 

All holes are cased with NW casing (88.9 mm) into the wall or floor of drill bay and drilled using BQTK sized core (40.7 mm). Upon completion of the hole, the casing is capped with aluminium cap with the drillhole name punched into it.

 

The drilled core is recovered and placed in metal core boxes, which are transported each shift to the geology core yard.

 

10.3.2.1Collar and down hole survey

 

Down hole surveys are carried out by PNRPL and Fusion Drilling personnel using an Axis-Champ-Gyro (±0.75° Az and ±0.15° dip). An initial shallow reading (less than 17 m) is taken to allow redirection if needed. After the first reading, systematic readings are taken approximately every five metres and upon completion the driller surveys the hole in continuous mode. Similar to the surface drilling protocol, “in” and “out” surveys are compared.

 

Axis-Camp-Gyro instruments are brought to surface once every week to be checked by PNRPL survey personnel. When the instrument fails checks, it is returned to the supplier for replacement.

 

Oriented core measurements are made at the drill by PNRPL and Fusion drilling personnel using a Reflex ACTIII tool.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 67

 

10.3.3Core Processing Routines (Surface and Underground)

 

10.3.3.1Core recovery

 

Qualified unregistered PNRPL exploration geologists regularly monitor core recoveries by daily visits to the drill rigs. Drillers are instructed to drill at a slower rate when experiencing blockages encountered at fractured or weak zones. Core recovery is reconciled at the core shed, recorded in formatted Microsoft Excel spreadsheets, and then imported into DHLogger.

 

Geotechnical logging, including rock quality designation (RQD), magnetic susceptibility, and conductivity, using a TerraPlus KT-10 is completed on all holes.

 

The rock quality designation at the Project is generally high due to the competent lithologies drilled through, e.g., gneissic footwall and hangingwall, and amphibolite host. Core recovery in the weathered zone near surface (up to 50 m depth) is poor and holes are steel cased to avoid hole collapse. The recoveries in the mineralized zones are good, ranging from 90% to 100%. Core loss is very low.

 

10.3.3.2Core logging

 

Core is initially cleaned and metreage marked before delineating lithological contacts and marking sample intervals. All core logging and sample selection are completed by degree qualified PNRPL geologists. Core is logged digitally into the Fusion database using the DHLogger interface. Core logging includes identification of lithology, structure, alteration, mineralization, core recoveries, and other notable characteristics. Logging is completed in sufficient detail to permit detailed lithological and mineralogical studies. Sample intervals are drawn based on different petrological and physical characteristics of each sample length.

 

10.3.3.3Core photography

 

All core is photographed with the start, end, and intermediate intervals clearly marked on each box. Core is photographed both wet and dry, and before and after sampling, and marked clearly before storage.

 

10.3.3.4Core sampling

 

The PNRPL standard operating procedures require sampling of the entire amphibolite host plus a minimum length of one metre in the hangingwall and footwall lithologies. Sample intervals range from a minimum of 0.25 m to a maximum 1.5 m in length, with the majority of sampling kept at one metre intervals. Samples below 0.5 m are taken to reflect mineralization and geological contacts, at the discretion of the site geologists. Approximately 10% of samples in the PNR 2023-2024 underground drillhole database are less than 0.50 m, and greater than 99% of all 2023-2024 underground core samples at Selebi North are sampled at or below 1.5 m length.

 

Prior to cutting, the core is aligned in the box and photographed. Samples are marked directly on the core, which is cut longitudinally using a diamond saw. Core is cut from bottom to top (up hole) with the orientation line facing vertically upwards. After cutting, one half of the sawn core sample is placed in an individual plastic sample bag along with its sample number and sent for analysis in sample batches. The remaining half core is placed back in the core box and retained for reference purposes, i.e., quartered for duplicates or re-analysis.

 

Sample tag books recording the drillhole number, estimated sulphides, lithology, and the sample interval are maintained at the core shed at the Selebi North Mine site.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 68

 

10.3.3.5Sample shipping

 

Following the review of the density results by the geologist, the following steps are completed prior to sample shipment to the laboratory:

 

●Secured the individual sample bags with cable tie to avoid sample loss.

 

●Packaged smaller secured bags into 430 mm x 760 mm x 250 mm polyweave bags.

 

●Secured large bags with cable ties for added protection.

 

●Prepared sample dispatch documents (analytical services request sheet) in duplicate listing sample numbers, elements to be analysed, and any other instructions.

 

●Transferred samples to a PNRPL driver for transport to the laboratory.

 

10.3.3.6Core and sample storage

 

It is a statutory requirement that all core obtained from exploration drilling be kept in storage for future reference. All drill core was thus stored at the PNRPL core processing facility at the Selebi North Mine site. Mineralized intervals are stored in a sea container for protection from the weather and non-mineralized core is stored outside on concrete slabs.

 

For the analyzed sample material, all coarse rejects were placed in storage at the ALS laboratory in Johannesburg for a period of 45 days and were then disposed of. The ‘Master Pulps’ were stored at the laboratory for 90 days in case re-analysis was required, and then periodically shipped from the ALS laboratory to Selebi Phikwe, Botswana for long term storage by PNRPL. Pulps are kept in secured storage in sea containers at the Selebi North Mine site.

 

The MSA QP considers the core processing routines and lithological logging procedures for exploration holes to be consistent with standard industry practice.

 

10.3.3.7Database

 

PNRPL drill hole logging data are maintained in DHlogger software, with regular backups. Analytical data is currently maintained in spreadsheets outside of DHLogger. Historical databases are maintained separately in a series of MS Access, mining software (Datamine), or MS Excel file types. The MSA QP recommends that a comprehensive and validated database representing historical drill holes be prepared and merged with the current database, and that analytical results be imported directly into and maintained within a data management software.

 

10.4MSA QP Opinion on Drilling Campaigns at Selebi

 

The MSA QP considers that the PNRPL drilling, surveying, logging and sampling work is of a high standard consistent with modern good practices. All drilling is diamond drilling, recoveries are generally high (particularly in the mineralised zones), and modern survey techniques are employed.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 69

 

Recoveries for historical underground BCL drilling data were logged and sampling practices were similar to those used by PNRPL. Although local inaccuracies may arise due to the lack of down-hole survey data for most of the BCL underground holes, the holes are short and such inaccuracies are not material to the global Mineral Resource estimate. Despite the controls in place, the historical underground data should be carefully validated spatially prior to use in Mineral Resource estimation.

 

The surface drilling completed by BCL was over a period of several decades. Examination of historical records reveal that largely consistent practices were in place from one campaign to the next. Down-hole survey techniques were less sophisticated than modern practices and errors may occur. Given the approximately 200 m spacing at Selebi Main, and the tabular nature of the deposit, minor survey accuracies are unlikely to have a material impact on the Mineral Resource Estimate. Resurveying of the Selebi Main holes has mitigated some risk in this aspect, although not all holes were re-surveyed. At Selebi North, the folded structure is more sensitive to spatial inaccuracy, and the positions of mineralised intercepts should be closely examined to ensure they are spatially consistent with the PNRPL holes and underground exposures, prior to use in Mineral Resource estimation.

 

All historical drilling data considered for inclusion in the Mineral Resource is from diamond drill core drilling, similarly to that completed by PNRPL

 

The MSA QP is of the opinion that there are no drilling, sampling, or recovery factors that could materially impact the accuracy and reliability of the results globally, however, should local estimates be required for detailed mine planning more extensive spatial validation of the historical data is required.

 

10.5Hydrogeology Data

 

GCS Botswana (Pty) Ltd (GCS) was appointed by BCL in Liquidation to conduct a specialist hydrogeological study to complement a mine closure process for the BCL Complex (BCL and TNMC Mines) and the following information is summarized from their 2020 report entitled “BCL Complex Hydrogeological Study; Selebi Phikwe and Tati).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 70

 

GCS conducted a series of data driven and field investigations, including groundwater and surface water sampling, geophysical investigations, borehole drilling, and aquifer testing. The data collected were used to create a conceptual hydrogeological model over the area and to explore closure management plans and risks for the Project.

 

Selebi and Selebi North mines are actively dewatered, with water pumped to the Million Gallon Dam (MGD) within Phikwe. In 2020, a cumulative volume of approximately 1,400 m3/day was pumped from Selebi North and Selebi. With the cessation of mine dewatering, flooding periods for Selebi and Selebi North are estimated to be between 12 and 13 years, and 33 and 53 years, respectively. The potential exists for the mine workings to flood to a level that may encroach the upper shallow aquifer and surface water rivers and streams. It is GCS’ opinion that after cessation of mine dewatering, the workings will flood, but that the water table will stabilize below the upper geological strata and that none of this water will decant from any of the shafts (Labuschagne and Stapelberg, 2020).

 

The MSA QP considers that the quantity of water ingress is relatively small and has no impact on the initial assessment.

 

10.6Geotechnical Data

 

The MSA QP understands that geotechnical (RQD) data has been acquired over several years and has been used to support the mine development at Selebi. As of the date of this TRS, these reports were not available for review. The lack of geotechnical data is a limitation as it does not allow for quantitative or semi-quantitative assessment of dilution, support and extraction parameters.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 71

 

11.Sample Preparation, Analyses and Security

 

11.1BCL Sample Preparation, Analysis, and Security

 

The following sections describe work undertaken by former operator BCL from 2007 to 2016.

 

11.1.1Sample Preparation and Analysis

 

Core samples from both surface and underground drilling were delivered by BCL personnel to the onsite BCL laboratory, which served as the primary laboratory, for analysis. The BCL laboratory received accreditation from the Southern African Development Community Accreditation Service in accordance with the ISO/IEC 17025:2005 international standard for technical competence of nickel and copper analysis in March 2016. While most samples in the historical database were analyzed prior to this accreditation, in the years prior to accreditation the laboratory had been actively working with the Botswana Bureau of Standards to achieve this goal. As part of this work, a selection of samples was sent to ALS Chemex (ALS) Tati-Phoenix and Nkomati laboratories for quality assurance and quality control (QAQC) purposes. The ALS laboratories are independent and were accredited according to the South African National Accreditation System.

 

At the BCL laboratory, samples were crushed in a two-step process to ±5 mm, then a ±300 g sample was riffle split and pulverized to <325 mesh (45 µm).

 

The BCL laboratory used a four acid (HNO3-HClO4-HF-HCl) digestion to treat the samples.

 

At the BCL laboratory, surface samples were assayed for copper, nickel, iron, sulphur, and cobalt using flame atomic absorption spectroscopy (FAAS). ALS analyzed the samples by inductively coupled plasma (ICP)–atomic emission spectroscopy (AES) for a suite of 33 elements (including platinum group elements) according to its analytical code ME-ICP61. ALS analyzed samples with copper and nickel values >1% (>10,000 ppm) by ICP-atomic absorption spectroscopy (AAS) according to its analytical codes Cu-OG62 and Ni-OG62, respectively.

 

Underground samples were routinely analyzed by FAAS for nickel and copper, however, provisions were available for analysis of other elements including cobalt, iron, and sulphur, as required.

 

11.1.2Density Determination

 

Bulk density (density) determination was completed using the water immersion method (Archimedes method) by a trained BCL geological technician. The method entails the weighing of a dry sample in air and in water. Density determinations of all samples were carried out in a closed environment at the core shed to avoid external disturbances that may affect the scale reading. Dry samples were weighed using an electronic scale sensitive to 0.1 g and capable of measuring weights up to 3,100 g.

 

Density of a particular sample lithology was reviewed for correspondence with the sample description of the lithology on the log sheet and if there were any marked discrepancies, the process was repeated and the density recalculated.

 

The recorded bulk density was validated by a geologist to confirm if it corresponded to the lithology as logged. If correct, the geologist approved the batch for dispatch to the laboratory and the density measurements were recorded on a log sheet, otherwise the whole process was repeated.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 72

 

The MSA QP considers the historical density determination procedure to be adequate and consistent with standard practices.

 

11.1.3Sample Security

 

11.1.3.1Sample shipping

 

Following the review of the density results by the geologist, a BCL technician completed the following steps prior to sample shipment to the laboratory:

 

●Secured the individual sample bags with cable tie to avoid sample loss.

 

●Packaged smaller secured bags into 430 mm x 760 mm x 250 mm plastic bags.

 

●Secured large bags with cable ties for added protection.

 

●Prepared sample dispatch documents (analytical services request sheet) in duplicate listing sample numbers, elements to be analysed plus any other instructions.

 

●Transferred samples to a BCL driver for transportation to the onsite laboratory.

 

11.1.3.2Core and sample storage

 

It was a statutory requirement that all core obtained from exploration drilling be kept in storage for future reference. All BCL exploration core was thus stored at the BCL core shed at the Phikwe Mine site. For core from underground drilling, the whole core sample was prepared for analysis within the interval selected for sampling. Hangingwall and footwall cores were discarded.

 

All production pulp and coarse rejects from the BCL laboratory were kept in storage at the laboratory for three weeks before they were discarded. Coarse rejects from surface exploration campaigns were returned to the Geology department and kept in secured storage at the core shed for one year after the campaign before being discarded.

 

11.1.4QAQC Protocols

 

There is no evidence that QAQC samples were submitted as part of analytical programs prior to 2007.

 

QAQC protocols including insertion rates as presented in Table 11-1 were implemented by BCL in 2007 and are summarized from Lungu (2016). The QAQC procedures were applied to all aspects of geological sampling; surface exploration, underground channel sampling and underground drilling.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 73

 

Table 11-1
Historical QAQC sample insertion rates

 

QAQC Sample Type Frequency Placement
Field Duplicate  1 in 201 Random, Preference for Within Mineralized Zone 
Check Assay (Pulp Return)  0 to 5 in 20 Random 
Coarse Rejects (Coarse Return)  0 to 5 in 20 Random 
Blank 1 in 20 Random, Preference for Within Mineralized Zone 
Certified Reference Material (CRM) 1 in 20 Random 

Notes: 

1.Source: modified from Lungu, 2016 
2.Field duplicate submission was limited to surface and Selebi North underground exploration holes only. Small diameter underground drill holes were submitted whole to the laboratory for analytical testing

 

CRMs comprised:

 

●AMIS0060; accepted mean value of 0.3356% Cu and 0.3117% Ni

 

●AMIS006; accepted mean value of 1.306% Cu and 3.549% Ni

 

The blank material comprised of hangingwall gneiss from cores taken away from the mineralized zones.

 

In addition to blind sample submissions to the laboratory by the BCL geological department, the BCL laboratory included certified reference material (CRM) samples for internal monitoring at a rate of 1 in 10, as well as duplicate samples (rate unknown).

 

The BCL laboratory participated in a “Round Robin” check assay program with Tati Nickel and Nkomati laboratories.

 

11.1.5QAQC Results

 

Lungu (2016) concluded that BCL’s QAQC protocols were inconsistently followed both temporally and in different parts of BCL mines, however, he reviewed available results and observed them to be sufficient to support the estimation of Mineral Resources. Lungu (2016) recommended that QAQC protocols be standardized across the site and for all sample types and that sample support from drillholes be delineated spatially and used to support classification criteria.

 

A sample of the CRM data was made available to MSA in a spreadsheet format for nickel assays (Figure 11-1). Three low outlier values were noted for AMIS0061, which are potentially mislabeled samples. The remaining assays of the two CRMs indicate that BCL was capable of producing accurate assays for nickel.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 74

 

Figure 11-1
BCL CRM AMIS060 and AMIS060 control charts
 
 

 

Source: BCL Archive (server)

 

The report (as sourced from BCL Archive (server)) provided for the “Round Robin” exercise between BCL, Tati Nickel and Nkomati laboratories concluded “there was insufficient agreement between the three laboratories. There was no clear warranty of rejection because of the limited amount of data to assign the best value.”.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 75

 

11.2PNRPL Sample Preparation, Analysis, and Security

 

11.2.1Sample Preparation and Analysis

 

Samples collected at the Project are submitted to ALS Chemex South Africa in Johannesburg, (ALS Johannesburg) for preparation and analysis. ALS Johannesburg is independent of PNRPL, and its facilities are accredited to the International Organization for Standardization/International Electrotechnical Commission (ISO/IEC) 9001:2008 standards, for all quality management and to ISO/IEC 17025:2005 for all relevant procedures.

 

A check assaying exercise was carried out in 2024 whereby pulp duplicates were assayed by SGS South Africa (PTY) Ltd. (SGS) of Johannesburg, South Africa for a set of the 2023-2024 Selebi Main samples. This facility is also an accredited facility to SANAS ISO 17025 by SANAS.

 

The following analysis is undertaken at the ALS Johannesburg facilities:

 

●Sample Preparation: PREP-31 and PREP-32H. Samples are crushed to 70% less than 2 mm, riffle split to 250 g, pulverized split to greater than 85% passing 75 µm. PREP-32H provides a larger pulverized sample for pulp duplicates.

 

●Analysis: ME-ICP81. Samples are decomposed using a peroxide fusion with an ICP-AES finish to measure Ni, Cu, Co, As, Pb, Zn, S, Fe, Al2O3, CaO, Cr2O3, Fe2O3, K2O, MgO, MnO, SiO2, TiO2.

 

●Analysis PGM-ICP23. Analyses for Pt, Pd, and Au are by fire assay with an ICP-AES finish.

 

●Analysis ME-ICP61. Samples are analysed using four acid digestion with ICP-EAS finish are completed to measure Ag.

 

●Analysis S-IR08. If sulphur over-runs occur, total S is determined by LECO furnace and infrared spectroscopy.

 

In the MSA QP’s opinion, the sample preparation and analytical procedures for the PNRPL samples are acceptable for the purposes of Mineral Resource estimation.

 

11.2.2Density Determination

 

Bulk density (density) determination was completed using the water immersion method (Archimedes method) by a trained PNRPL geological technician. All determinations were carried out in a closed environment at the core shed to avoid external disturbances that may affect the scale reading. Dry samples were weighed using an electronic scale sensitive to 0.1 g and capable of measuring weights up to 3,100 g.

 

Density of a particular sample lithology was reviewed for correspondence with the sample description of the lithology on the log sheet and if there were any marked discrepancies, the process was repeated and recalculated.

 

The recorded densities were validated by a geologist to confirm if they correspond to the lithology as logged. If correct, the geologist approved the batch for dispatch to the laboratory and the density measurements were recorded on a log sheet, otherwise the whole process was repeated.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 76

 

The MSA QP considers the density determination procedure to be adequate and consistent with standard practices. Density measurements were recorded on all core samples in 2022, 2023 and 2024 to build a database to support the interpolation of density during resource estimation.

 

11.2.3Sample Security

 

Samples are handled and transported by PNRPL personnel or contractors. Drill core is stored at the onsite core storage facility, the grounds of which are locked. The storage facilities are open with 2022 mineralized intervals stored in a locked sea container. A core storage map is maintained by PNRPL. Sample rejects are stored at the ALS site and then are disposed.

 

Residual coarse rejects are placed in air proof plastic bags and stored on pallets at the ALS prep lab in South Africa. The coarse rejects are stored for a period of 90 days and then they are disposed. The ‘Master Pulps’ in ALS Johannesburg are periodically shipped to Selebi Phikwe, Botswana for long term storage by PNRPL.

 

In the MSA QP’s opinion, the sample security procedures are adequate for the purposes of Mineral Resource estimation when considered alongside additional verification tests completed by the MSA QP, however, improvements are warranted, specifically with reference to the historical data.

 

11.2.4QAQC Protocols

 

CRM samples (standards) are inserted regularly at a rate of one per 20 samples within a batch not exceeding 200 samples. CRM samples were chosen based on anticipated nickel content of the proximal mineralized core sample. Six different CRMs were used:

 

●CFRM-100, CFRM-101 and CFRM-102:

 

◌These CRMs were primarily used. These were sourced from Sudbury nickel-copper sulphide mineralization and manufactured by CF Reference Materials Inc., Ontario.

 

●AMIS0283, AMIS0316 and AMIS0385:

 

◌These CRMS are manufactured by African Mineral Standards in South Africa.

 

◌AMIS0283 was sourced from Sudbury, AMIS0316 was sourced from Nkomati Cu-Ni-PGM mine in South Africa, and AMIS0385 was sourced from the Savannah Nickel Mine in Western Australia.

 

Blank samples (blanks) are inserted regularly at a rate of one per 20 samples. Two types of blank material were used:

 

●Field blank – chips sourced from a quartzite quarry near Mmadinare.

 

●Certified blank – pulverized silica blank from CF Reference Materials Inc. (CFRM-900).

 

A coarse reject duplicate was assayed every 7% for Selebi Main and every 10% for Selebi North.

 

Pulp duplicates were assayed at SGS for 6% of the Selebi Main samples.

 

QAQC sample insertions maintain consecutive numerical order. All CRMs are certified for nickel and copper and are matrix matched. QAQC sample results are reviewed upon receipt by the corporate geology team and re-assaying is done when a batch fails the initial QAQC.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 77

 

The QAQC database for Selebi contains approximately 2,324 QAQC samples from 183 drillholes drilled between 2022 and 2026. A summary of the QAQC sample statistics is presented in Table 11-2.

 

Table 11-2
QAQC sample statistics

 

Project QAQC Type Count Assay Frequency
Selebi Main Standard 79 6%
Blank 57 5%
Interlaboratory Pulp Duplicate 72 6%
Coarse Duplicate 88 7%
Selebi North Standard 612 6%
Blank 385 4%
Interlaboratory Pulp Duplicate 0  -
Coarse Duplicate 1031 10%

 

11.2.5QAQC Results

 

11.2.5.1Blanks

 

The QAQC dataset contained 442 blanks, comprising a mix between field blanks and certified blanks. Most of the assays were below the failure limit of 0.01%. Some minor contamination or trace amounts of the analytes in the field blank is evident. Blanks’ statistics and performance is presented in Table 11-3.

 

Table 11-3
QAQC blanks performance summary - PNRPL samples at ALS

 

Assay Mean Min Max Count Fail Count Fail %
Ni % 0.003 0.0001 0.030 442 5 1.1%
Cu % 0.003 0.0001 0.088 442 19 4.3%
Co % 0.001 0.0001 0.013 442 2 0.5%

 

11.2.5.2Standards

 

For the principal CRMs (CFRM-100, CFRM-101, CFRM-102), failure rates were less than 3% except for Co assays of CFRM-100 (24% failure rate) and Ni assays of CFRM-102 (10% failure rate) based on a three standard deviation tolerance. Cobalt performance is expected based on the low expected Co grade. Most of the Ni failures of CFRM-102 occurred in 2023, with significant performance improvement since then. Mean bias is relatively low with no preferential positive or negative bias. Co assays exhibited the highest mean bias. The low values of two assays for CFRM-100 suggest some errors potentially related sample names or blanks.

 

The AMIS standards were less frequently inserted hence the failure rates are not considered meaningful. No concerns were noted.

 

CRM statistics and performance is presented in Table 11-4, and selected control charts for the CFRM standards Ni analyses are shown in Figure 11-2.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 78

 

Table 11-4
QAQC - CRM performance summary PNRPL samples at ALS

 

CRM Assay CRM value Mean value Bias % Count Fail number Fail %
AMIS0283 Ni% 2.26 2.27 0% 2 0 0%
Cu% 2.74 2.80 2% 2 0 0%
Co% 0.09 0.10 10% 2 0 0%
AMIS0316 Ni% 0.59 0.60 1% 10 2 20%
Cu% 0.21 0.22 4% 10 2 20%
Co% 0.03 0.03 -8% 10 3 30%
AMIS0385 Ni% 1.77 1.87 5% 4 1 25%
Cu% 0.96 1.03 7% 4 1 25%
Co% 0.10 0.10 3% 4 1 25%
CFRM-100 Ni% 0.30 0.31 3% 351 3 1%
Cu% 0.35 0.35 -1% 351 6 2%
Co% 0.02 0.02 3% 351 83 24%
CFRM-101 Ni% 1.19 1.17 -2% 139 4 3%
Cu% 0.88 0.90 2% 139 1 1%
Co% 0.04 0.03 -10% 139 2 1%
CFRM-102 Ni% 2.45 2.50 2% 166 17 10%
Cu% 1.69 1.73 2% 166 2 1%
Co% 0.06 0.05 -8% 166 0 0%

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 79

 

Figure 11-2
CRM control charts for Ni (CRFM100, 101 & 102)
 
 
 

Source: MSA, 2016, compiled from NEXM data

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 80

 

11.2.5.3Duplicates

 

The QAQC database contained 1,191 duplicates of which 1,119 were coarse reject duplicates and 72 were pulp duplicates (check assays).

 

Coarse Duplicates

 

Coarse reject (preparation) duplicate samples are submitted for analysis to evaluate sample homogeneity at the coarse crush stage during sample preparation, and analytical precision. Samples represent a second 250 g sample portion from a riffle splitter. Results for Cu and Ni were generally good, with Co displaying greater variability at the lower grade range (less than 0.02% Co; Figure 11-3). Four errors were observed with respect to Cu assays, where the first leg returned between 2% and 4% Cu and the second leg was barren. Generally coarse rejects are acceptable where 80% of the assays have a half absolute relative difference (HARD) of less than 10% or 90% have a HARD of less than 20%. This was achieved for copper and nickel. Cobalt assays did not achieve the pass criteria, however removal of the very low-grade samples within the “method precision” or “noise range” would improve the HARD values to acceptable levels.

 

Table 11-5
2025 Duplicates Statistics

 

Type Assay Count Percentage HARD < 10% Percentage HARD  < 20%
Coarse Reject Ni% 1119 86% 94%
Cu% 1119 81% 89%
Co% 1119 71% 85%

 

Figure 11-3
Scatter plots for coarse duplicate samples
   

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 81

 

Intentionally left blank

 

Source: MSA, 2016, compiled from NEXM data

 

Intra-laboratory Pulp Duplicates (Check Assays)

 

A check assaying exercise was carried out in 2024 whereby pulp duplicates were assayed by SGS South Africa (PTY) Ltd. (SGS) of Johannesburg, South Africa for a set of the 2023-2024 Selebi Main samples. SGS is also an accredited facility to ISO 17025 by SANAS. The pulp duplicate results indicated that the primary laboratory (ALS) reported consistently higher values for copper, nickel and cobalt than the secondary laboratory (SGS), which is particularly apparent for the higher nickel and cobalt grades (Table 11-6 and Figure 11-4). This suggests a potentially significant positive bias of the ALS data (31% for Ni, 10% for Cu and 15% for Co). This conclusion is not backed by results of CRMs assayed at ALS, which demonstrate acceptable accuracy by assay results from six different CRM’s, sourced from two different manufacturers, that did not show consistent bias or of such magnitude. PNRPL technical staff proposed that the results could be caused by a resettling of the pulp sample over the extended time between preparation and submission to SGS, and that the bias could be resolved through remixing of the pulp prior to splitting and resampling. Further check assay work is recommended on a routine basis and retrospectively to check the potential bias.

 

Table 11-6
2025 Inter-laboratory duplicates statistics (ALS vs SGS)
Type Assay Count Mean SGS Mean ALS SGS Bias Percentage HARD < 10% Percentage HARD < 20%
Interlaboratory
(ALS vs SGS)
Ni% 72 0.435 0.569 -31% 57% 85%
Cu% 70 0.647 0.710 -10% 76% 90%
Co% 72 0.020 0.023 -15% 33% 74%

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 82

 

Figure 11-4
Scatter plots for pulp duplicate samples (check assays)
Intentionally left blank

 

Source: MSA, 2016, compiled from NEXM data

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 83

 

11.3MSA QP opinion on Adequacy of the Sample Preparation, Security and Analytical Procedures

 

In the MSA QP’s opinion, the sample preparation procedures for nickel, copper and cobalt are acceptable. Sufficient sample security is in place. Based on the QAQC results, copper and nickel assays have shown acceptable performance at the ALS Laboratory.

 

A check assaying exercise resulted in a difference between the pulp duplicates assayed by SGS (secondary laboratory) and those by ALS (primary laboratory). The difference is significant and particularly apparent for the higher nickel and cobalt grades. Such inaccuracy in the ALS results is not backed by results of CRMs assayed at ALS, which demonstrate acceptable accuracy by assay results from six different CRM’s, sourced from two different manufacturers, that did not show consistent bias or of such magnitude. Further check assay work is recommended on a routine basis and retrospectively to check for any potential bias.

 

The processes used to collect the BCL data are well documented and conform to industry norms. Although the BCL QAQC data does not appear to be comprehensive, sufficient evidence that QAQC was in place from 2007 onwards and that QAQC was being actively managed by BCL. A subset of the historical BCL assay data, largely Selebi Main BCL surface drilling was not subjected to modern QAQC.

 

The MSA QP considers that the PNRPL assay data can be confidently used in a Mineral Resource Estimate. The lack of independent QAQC protocols for pre-2007 BCL assays and incomplete QAQC data for the BCL data should be considered in the Mineral Resource classification, with estimates based largely on BCL data, particularly pre-2007, being assigned relatively low confidence.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 84

 

12.Data Verification

 

A site visit was carried out to the Selebi Mines project by the MSA QP from 03 November 2025 to 08 November 2025. During the site visit, existing infrastructure was examined, and current drilling sites and the underground workings were inspected. At Selebi Main, the freshly blasted mineralization in several of the metallurgical sampling areas was observed.

 

Drilling exploration by PNRPL at both Selebi Main and Selbi North was in progress during the time of the site visit. The drilling, surveying logging, sampling and QAQC protocols were reviewed by the MSA QP.

 

For both Selebi Main and Selebi North, a selection of the drillhole sample assays in the PNRPL data were checked against independently accessed assay certificates. MSA was provided with original assay certificates for the PNRPL drillholes and has access to the ALS Web retrieve system where assay results can be obtained directly from the laboratory. MSA cross-checked the assays certificates for several assay batches against the values in the Excel database. No transcription errors were found.

 

A selection of historical (BCL) database assay results were compared against current digital records. No material issues were found.

 

Where possible, historical surface holes were re-accessed, down-hole surveys were completed using a gyroscopic tool and downhole geophysics was completed by PNRPL. Where holes were re-surveyed, the new survey replaced the old survey. In general, the gyroscopic survey confirmed the surveys completed at Selebi Main using magnetic survey tools. Newer holes drilled by BCL in the post-2010 campaign, mostly at Selebi North, tended to exhibit larger discrepancies.

 

12.1Selebi Main

 

12.1.1Drilling verification

 

The historical data was verified through drilling of new holes between historical holes, and a twin intercept was achieved by drilling from a wedge from one BCL surface hole that was accessed. It should be noted that the following comparisons state drilled thicknesses, which are not true thicknesses. All drillholes were collared vertically from surface and therefore the apparent thickness comparisons are reasonable.

 

Drillhole intercept for sd120 (BCL) compared with sd120-W1A (PNRPL):

 

●sd120: 2.74% Cu, 1.16% Ni over 3.47 m

 

●sd120-W1A: 2.98% Cu, 1.56% Ni over 2.55 m

 

●The distance between the intercepts is approximately 48 m.

 

In attempting a bias test, clusters of BCL and PNPRL data that occurred relatively close to one another were identified by MSA. These are shown in Figure 12-1; the white line between clusters representing the approximate distance between them (i.e., between 48 m and 177 m).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 85

 

Figure 12-1
Data clusters selected for bias test

Note: Holes used in bias test shown as hole names with white border

 

The differences in copper grade, nickel grade and intercept length between the clusters of PNRPL and BCL data are shown in Figure 12-2. There is no consistent bias between the length and copper grade of the BCL intercepts and the PNPRL intercepts. However, the BCL intercepts are generally higher in nickel grade with five out of the six BCL intercepts having higher nickel grade.

 

The length weighted mean of the BCL data is higher for both copper grade and nickel grade (Table 12-1). The length weighted mean is skewed by the high grade and thick sdn119 intercept. Removal of the sdn119 / SMD-22-009 pair gives a closer comparison, and then the PNPRL data mean is 21% lower for Cu, 36% lower for Ni and 15% higher for length.

 

Table 12-1
Comparison of BCL with PNRPL intercepts

 

Company Length-density weighted Data mean
Cu% Ni% Length Cu% Ni% Length
All
BCL 3.04 1.83 8.22 2.55 1.46 8.22
PNRPL 1.82 0.93 6.63 1.93 0.89 6.63
sdn119 and SMD-22-009 removed
BCL 2.22 1.30 6.7 2.39 1.34 3.02
PNRPL 1.55 0.82 6.9 1.89 0.86 4.47

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 86

 

Figure 12-2
Comparison between drillhole clusters selected for bias analysis between BCL and PNRPL intercepts

 

Source: MSA, 2016

 

Recognizing the high mineralization variability, BCL generally drilled a second intersection by wedging a deflection from the mother hole. The short deflections generally achieved an intersection within 5 m of the mother hole. High variability is observed between the mother hole and deflection in many cases (Figure 12-3) and therefore higher differences are expected when pairs are significantly further apart as seen in the six comparisons for the bias analysis.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 87

 

Figure 12-3
Comparison between BCL mother hole and deflection
 

Source: MSA, 2016

 

The Selebi Main deposit exhibits trend and generally high variability, therefore the validity of the bias test based on relatively widely spaced data is tenuous. However, the analysis served to confirm the relatively thick area between SMD-22-009A and sd119, and sd120 compared well with the verification deflection (sd120-W1A) given the variability of the mineralization.

 

12.1.2Site visit verification by the MSA QP

 

During the November 2025 site visit, the following verification work was performed.

 

●Historical hard copy records were located.

 

●The metallurgical sample positions, broken mineralization and fresh mineralization in the recently blasted sample positions was observed for three of the samples along 950 sill drive. Although no underground drilling was taking place during the site visit, several cross-cuts had been developed into the hangingwall of the deeper sill-drives for future underground drilling purposes (Figure 12-4).

 

●The BCL drillhole cores covering the PNPRL leases have been transported from the BCL central storage facility at Phikwe to PNPRL’s storage area at Selebi North. Mineralization is clearly discernible in the historical cores; however, the sulphide material has oxidized, and the condition of the remaining cores is variable (Figure 6 4).

 

●PNPRL surface drillhole mineralized intercepts were examined for the following holes:

 

◌SMD-22-001, SMD-22-001-W1, SMD-22-006AW2, SMD-22-009A

 

◌SMD25-201 (drilled in the extension area / “Flexure Zone”), SMD-25-202 (drilled in the deep extension area / “Flexure Zone” outside MRE)

 

The mineralization was observed to be consistent with the logged descriptions, and the magnitude of the nickel and copper grades was verified against the assay sheets by visual inspection.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 88

 

●Drillhole collars were located in the field and hand-held GPS readings were taken to verify their positions against the PNPRL database entries for the following:

 

◌Drillholes SMD-25-203, SMD-25-204, SMD-25-205 and SMD-25-207 (Figure 12-4). These were being drilled at the time of the site-visit in the extension area / “Flexure Zone” of the MRE.

 

◌The drill sites of completed holes; SMD22-006 and SMD-25-202 (Figure 12-4) were inspected.

 

◌The historical hole collars of sd144, that was later extended for a depth of 1,200 m to 1,400 m by PNPRL, and sd135C, that was also extended, were located.

 

The handheld GPS readings confirmed the drillhole coordinates within reasonable limits.

 

Figure 12-4
Selebi Main site visit photos

 

(top left to bottom right: PNPRL drilling platform, blasted undergound metallurgical sample, capped collar of SMD-22-006, Marcote HM2500 rig at SMD-25-207, BCL Selebi Main core stored at Selebi North coreyard, PNRPL core storage, logging and sampling area)

 

     
   
   
       
Source:Witley, November 2025

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 89

 

12.1.3Logging and sampling verification of historical records

 

PNRPL re-captured the Selebi Main hard copy logging and sampling data. The MSA QP compared the PNRPL captured data for 52 exploration drillhole intercepts, comprising 635 records, against a database export from 2004. Minor inconsistencies in the start and end of sample intervals within the intercept were noted. One drillhole, sd133, had significantly different data. The original hard copy data was then investigated, and it was found that the PNRPL data is correct relative the historical record. It is unsure why the 2004 data differ in this case and further investigation is required. It should be noted that sd133 is outside of the Mineral Resource area. A value of 3.03 % Ni and trace copper was shown on the original handwritten log for sd34. This is considered an error in the original data and was already corrected by PNRPL to 0.03% Ni following examination of the logging data. The MSA QP agrees with this edit.

 

A basic transcription of the main lithologies described in the logs has been completed. MSA considers that further work is required to validate the logging data.

 

12.2Selebi North

 

12.2.1Drilling verification

 

No specific re-sampling of twin drilling was carried out. However, examination of the underground results by the MSA QP demonstrated that the PNRPL drilling results are consistent with those in the BCL data, aside from spatial issues described in a later section.

 

12.2.2Site visit verification by the MSA QP

 

During the November 2025 site visit the following verification work was performed.

 

●Historical hard copy records were located (Figure 12-5). These are stored in fire-proof vault at the Selebi North offices. Historical exploration drillhole records were available as hand logs and transcribed assays as well as for grade control underground holes.

 

●Drilling in progress, previous PNRPL drillhole sites and the collars of completed drillholes were observed underground (Figure 12-5)).

 

●The BCL drillhole cores covering the PNRPL leases have been transported from the BCL central storage facility at Phikwe to PNRPL’s storage area at Selebi North. Mineralization is clearly discernible in the historical cores; however, the sulphide material has oxidized, and the condition of the remaining cores is variable (Figure 12-5)). The entire core was sampled for underground drillholes and therefore there are no remaining cores, and other no residual material was kept.

 

●PNRPL surface drillhole mineralized intercepts were examined for the following holes:

 

◌SNUG-24- series; 094, 096-W1, 102, 110, 113, 114, 119, 141, 144, 158, 165 & 179

 

◌SNUG-25- series; 184, 186, 189, 191 & 192

 

The drillholes were independently selected by the MSA QP for verification purposes spatially across the deposit and to provide insight on specific geological structures. The mineralization was observed to be consistent with the logged descriptions, and the magnitude of the nickel and copper grades was verified against the assay sheets by visual inspection.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 90

 

Figure 12-5
Selebi North site visit photos

 

(top left to bottom right: historical intercept sdn15, SNUG-24-119 (N2 intercept), desnity measuring apparatus, rig in progress underground, collars of undergound holes in drill bay, historical log sheet of SDN134a, vault at Selebi North)

 

     
   
   
       

Source: Witley, November 2025

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 91

 

12.2.3Logging and sampling verification of historical records

 

Hard copy records of four BCL surface exploration holes were examined against the PNRPL database. Nickel, cobalt and copper assays, and density had been correctly transcribed. A basic transcription of the main lithologies described in the logs has been completed. MSA considers that further work is required to validate the logging data.

 

12.3Summary and Opinion of the MSA QP on the Data Verification

 

The verification work has confirmed the audit trail of the historical BCL data. The verification demonstrates that the historical and recent data have been accurately captured by PNPRL, although with limitations largely related to the capture of lithological logging. Mineralization in the PNPRL drillholes was observed to be consistent with the logging and assaying.

 

Portions of the Selebi Main deposit have been drilled by PNPRL, that have verified the nature of the mineralization, although the natural grade variability and limited data set failed to conclusively verify the grades. PNPRL is encouraged to complete additional drilling verification in order to improve the confidence in the historical data.

 

The Selebi North BCL surface drillhole data has been replaced by the PNPRL underground drilling, and it was not necessary to use the historical surface drilling. The nature of the mineralization in the BCL drillholes was observed to be consistent with that of the PNPRL surface and underground data, although some positional discrepancies in the intercept positions were noted for the surface drillhole intercepts.

 

The MSA QP is of the opinion that the historical BCL data is suitable to use in conjunction with the recent PNPRL data. The lower confidence in the BCL data should be considered in the Mineral Resource classification.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 92

 

13.Mineral Processing and Metallurgical Testing

 

The BCL concentrator and smelter plants located on the nearby Phikwe property operated for over 40 years, processing ore from both Selebi and Phikwe until the operations were placed on care and maintenance in October 2016. The processing complex that was located adjacent to the historical Phikwe Mine, and outside the Selebi Project area, has since been demolished.

 

The concentrator operated at capacities ranging from 6,000 tpd up to a maximum of 10,000 tpd. The preferred technology adopted for the concentrator was designed to produce a low-grade bulk sulphide nickel-copper concentrate.

 

The Outokumpu flash smelting furnace was commissioned in 1973 and processed mixed Selebi and Phikwe concentrates. The smelting equipment was upgraded over the years to facilitate the incorporation of nickel-copper concentrates received from the Nkomati Nickel Mine (a joint venture (JV) between Norilsk Nickel Africa Pty. Ltd. and African Rainbow Minerals) and the Phoenix Mine (Tati Nickel Mining Company, later a subsidiary of BCL). The smelter produced a high-grade sulphide matte containing nickel, copper, and cobalt, which was shipped off-site to refineries for further processing.

 

NexMetals metallurgical current objectives are significantly different than those of the historical BCL operations. NexMetals considered the previous smelter on the adjacent Phikwe property to be outdated, in poor condition, and not consistent with current environmental standards. NexMetals current plan is to use flotation to produce a marketable product.

 

13.1Historical Metallurgical Testwork

 

Several metallurgical testwork programs have been completed on the Selebi deposits. Table 13-1 summarizes the programs described in previous reports.

 

Table 13-1
Summary of previous metallurgical testwork carried out by NexMetals

 

Year Company Program Description Reference
2021 SGS Canada Inc. (SGS) Separate Concentrate Study Conceptual-level metallurgical testwork assessing production of separate copper and nickel concentrates (SGS, 2021). SLR, 2022
2023 Stark Resources (Stark) Ore Sorting Testwork Preliminary assessment of pre-concentration methods to upgrade Selebi material (Stark, 2024). SLR, 2024
2023 SGS Flotation Optimization Testwork Testwork to improve nickel recovery and to produce concentrates for downstream hydrometallurgical testing, using the remaining Selebi Main (S Comp) and Selebi North (SN Comp) composites from the 2021 program. SLR, 2024
2023 DRA Projects (Pty) Ltd. (DRA) Front End Solutions (FES) Study Conceptual study evaluating process options for concentrate production and processing (DRA, 2023). DRA, 2023

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 93

 

13.2Recent Testwork

 

In 2024, NexMetals engaged Flowsheets Metallurgical Consultants Inc. (Flowsheets) to develop a process flowsheet for the Selebi material. Flowsheets selected and collected the metallurgical samples and evaluated two flowsheet options: one producing separate copper and nickel concentrates, and one producing a bulk copper-nickel concentrate. The testwork was carried out at the Glencore XPS laboratory in Sudbury, Ontario.

 

In 2025, NexMetals initiated two further programs. Metso was engaged to evaluate whether the Selebi bulk concentrate could be treated by pressure oxidation, as part of further development of the bulk concentrate flowsheet. IMS Engineering was also engaged to run sensor-based ore sorting tests on a Selebi bulk sample to assess whether waste could be rejected ahead of processing.

 

Additionally in 2025, NexMetals appointed Fuse Advisors Inc. (Fuse) to oversee the metallurgical testwork programs. At that time, the project strategy was to produce a bulk concentrate as feed for an onsite hydrometallurgical facility. After reviewing the data room and completing a risk assessment, Fuse recommended that the metallurgical focus return to producing separate saleable concentrates. Blue Coast Research (BCR) was then engaged to carry out a flotation testwork program to assess the production of saleable copper and nickel concentrates.

 

Based on the results of these recent programs and a review of historical data, NexMetals is developing a process flowsheet to produce separate saleable copper and nickel concentrates. The following sections summarize the recent testwork that supports this approach.

 

13.2.12024/2025 XPS TESTWORK PROGRAM

 

The 2024–2025 XPS metallurgical test work program was carried out at XPS Expert Process Solutions (XPS), a commercial metallurgical laboratory in Falconbridge, Ontario, under the supervision of Flowsheets Metallurgical Consulting Inc. (Flowsheets). The primary objective was to develop a flowsheet capable of producing separate copper and nickel concentrates. The program also investigated optimization of a bulk concentrate flowsheet.

 

The program was structured into three phases:

 

●Phase 1: Geometallurgical unit studies, including mineralogical characterization

 

●Phase 2: Preparation of the Master Composite, flowsheet development, and variability test work

 

●Phase 3: Pilot plant campaign (not completed)

 

●Additional Scope: Bulk concentrate production for Metso hydrometallurgical testwork program

 

13.2.1.1Sampling and sample preparation

 

Four geometallurgical units were identified with input from project staff at site: Selebi Main, Selebi South Limb, Selebi N2 and Selebi N3. The unit names reflect geographic location, but each unit showed distinct mineralogical differences.

 

Primary samples of approximately 10 tonnes were collected from the underground workings in the Selebi mining areas. A subset of the collected samples was selected by Flowsheets for blending (Table 13-2).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 94

Table 13-2
Source of samples for the 2024 processing program

 

                  Mass Shipped (kg)  
Unit Workplace Sample ID Brief Description Local X Local Y Local Z Tonnes Blended Composite Tonnes Mintek Laboratory Stark Date Shipped
N3 Limb 856mL -1700 Sample A Massive sulphide, Moderate grade 34632.8 85014.6 36.9 10 30 494.8 937.1 24-Jul-24
856mL -1700 Sample B Narrow massive sulphide, Low grade 34656.4 84971.4 37.5 10
826mL- 1700 Sample C Massive sulphide, High grade 34670.3 84967.6 69.5 10
 
N2 Limb 895mL -2100 Sample B Disseminated sulphide with minor massive, overall moderate grade 34918.6 84846.7 -3.3 9.69 24.69 796.0 1540.6 24-Jul-24
910mL -2100 Sample E Poor to barren schistose amphibolite rock, low grade 35003.9 84680.8 -20.1 5
925mL -2100 Sample D Massive sulphide, High grade 35111.0 84553.5 -38.9 10
 
South Limb 895mL -800 FW Sample A Disseminated sulphide with minor massive, overall moderate grade 35093.0 84629.6 -7.0 3.75 22.5 752.1 1410.4 24-Jul-24
910mL -700 FW Sample B Massive sulphide, High grade 35090.6 84690.4 -23.3 10
925mL -800 Access Sample C Poor to barren amphibolite rock, Low grade 35112.4 84567.8 -39.0 8.75
 
Selebi Main 950mL-3775 Sample A Thick massive sulphide band (65%)
Weakly mineralized amphibole schist (30%)
Footwall grey gneiss (5%)
38404.9 83475.7 -28.8 6 18   1213.5 23-Aug-24
1050mL-3895 Sample B Weakly mineralized amphibolite (70%)
Narrow massive sulphide bands (25%)
Hangingwall grey gneiss (5%)
38233.8 83459.7 -128.5 6 1125    
1050mL-4120 Sample C Narrow sulphide bands (25%)
Semi-massive sulphides (25%)
Weakly mineralized amphibole schist (20%)
Footwall grey gneiss (30%)
38031.4 83566.0 -128.5 6  
1000mL-3825 Sample D Pegmatite       50 kg    
950mL-3960 Sample E Dolerite Dyke       50 kg    

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 95

 

The samples were crushed to a 36 mm top size and subsampled using Gy’s fractional shovelling method (Gy, 1978), following Gy’s Safety Line to maintain sample representativity. The resulting subsamples were shipped to Mintek in Johannesburg, South Africa for crushing to 12 mm top size and further blending, with sub-samples sent to XPS in Sudbury, Ontario, Canada. Net weights were 652 kg for Selebi Main, 361 kg for Selebi South Limb, 412 kg for Selebi N2 and 502 kg for Selebi N3.

 

At XPS, each sample was crushed, blended and subsampled. A 10 kg split at a 3.5 mm top size was taken for work index testing. Approximately 85 kg was then crushed to a 1.7 mm top size and blended into replicate 2 kg charges for flotation testwork.

 

13.2.1.2Mineralogy

 

For the mineralogy analysis of the geometallurgical samples, microprobe (EPMA) compositional analysis, X-Ray Diffraction (XRD) and TIMA quantitative mineral measurement were used. The assay head results are shown in Table 13-3.

 

Table 13-3
Assay head grades: Selebi geometallurgical units

 

Method 8-Peroxide ICP-OES 1C-OES
Analyte Cu % Ni % Co % Fe % S % Si % Mg % Au ppb Pd ppb Pt ppb
Main 2.25 1.46 0.053 34.5 17.9 10.5 2.74 84 245 206
South Limb 1.14 1.04 0.056 30.4 14.7 11.7 4.58 33 58 28
N2 0.59 0.96 0.052 28.9 13.6 13.4 4.02 24 49 46
N3 1.49 1.99 0.108 43.6 26.0 7.6 0.70 28 52 69

 

EPMA Data

 

The initial EPMA data reported as shown in Table 13-4.

 

Table 13-4
Initial EPMA data

 

Mineral S % Fe% Co% Ni% Cu%
Chalcopyrite 34.68 30.43 -0.01 0.01 35.10
Pentlandite 32.77 30.21 1.63 35.33 -0.02
Pyrrhotite 38.77 60.23 -0.01 0.64 0.01
Pyrite 53.21 47.23 -0.01 0.03 0.01

 

Inspection of Table 13-4 suggests that the cobalt in solid solution, relative to other known pentlandites in other mining regions, is unusually high, suggesting that at least some of the pentlandite will have enhanced flotation characteristics.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 96

 

 

Bulk Modal Assembly

 

The bulk modal assembly of the geometallurgical units is shown in Figure 13-1.

 

Figure 13-1
Bulk modal assembly: Selebi geometallurgical units
 

 

Pyrrhotite occurs as a sulphide gangue in the range of 30-65%. Amphibole follows the abundance of pyrrhotite at 12-50%.

 

Sulphide Mineralogy

 

The nickel and copper deportment by host mineral is shown in Figure 13-2. It is clear that 20-30% of the pentlandite is texturally held in pyrrhotite as flame pentlandite and chalcopyrite shows very little textural association with other sulphides.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 97

 

Figure 13-2
Nickel and copper deportment: Selebi geometallurgical units
   

 

Sulphide grain size distribution

 

The grain size distributions of pentlandite and chalcopyrite are shown in Figure 13-3.

 

Figure 13-3
Nickel and copper deportment: Selebi geometallurgical units
   

 

13.2.1.3Flotation

 

Geometallurgical unit testing

 

The four individual geometallurgical units listed in Item 13.2.1.2 were tested in duplicate using a rougher flotation test. The averaged grade-recovery curves for each duplicate set are shown in Figure 13-4. Inspection of Figure 13-4 shows that each geometallurgical unit has its own flotation behaviour.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 98

 

Figure 13-4
Copper and nickel and sulphur grade-recovery curves for geometallurgical units
 
 
 

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 99

 

Master composite preparation

 

The Master Composite was prepared from information at the mine site regarding the relative tonnages of each geometallurgical unit. This composition is shown in Table 13-5. This composite will be used for flowsheet development.

 

Table 13-5
Formulation of Master Composite

 

Geometallurgical Unit Mass
kg
Mass
%
Selebi Main 50.0 50.0
Selebi South 22.5 22.5
Selebi N2 16.0 16.0
Selebi N3 11.5 11.5
Totals 100.0 100.0

 

Development of a selective flowsheet

 

Three flowsheet configurations were tested on the Master Composite. The aim was a saleable copper concentrate grading 28% Cu with less than 0.5% Ni, followed by a bulk nickel–cobalt concentrate. The development changed one or two variables at each stage. The first test identified excessive nickel recovery to the copper circuit. Rev E, demonstrated below in Figure 13-5, then addressed collector selectivity and liberation, and Rev F tested a finer primary grind and finer regrinds. The key results are compared in Table 13-6.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 100

 

Figure 13-5
Simplified selective flowsheet – Rev E
 

 

Table 13-6
Summary of Master Composite saleable copper concentrate testwork

 

Flowsheet Primary grind Cu conc Cu grade % Cu conc Cu rec % Cu conc Ni grade % Ni rec to Cu conc % Ni conc Ni grade % Ni conc Ni rec %
Baseline 100 µm 13.26 89.4 5.31 44.7 2.83 16.7
Rev E 75 µm 17.52 81.7 4.91 27.9 4.32 20.2
Rev F 53 µm 19.37 81.3 4.5 23.1 4.06 29

 

 

The initial baseline test gave high copper recovery of 89.4%, which showed that chalcopyrite responds well to flotation. It also gave a clear baseline for the selectivity problem. The copper concentrate graded only 13.26% Cu and carried 5.31% Ni, with 44.7% of the nickel reporting to the copper circuit. Further investigation traced part of this to the 3894 collector used in the copper rougher, which is also a strong nickel collector. Even so, pentlandite flotation this aggressive in direct competition with chalcopyrite is unusual.

 

Three comparative rougher–scavenger tests were then run at primary grinds of 100, 75 and 53 µm (Figure 13-6) to assess whether liberation was a limiting factor. Based on these results, Rev E adopted a primary grind of d80 = 75 µm and removed the 3894 collector from the copper circuit. These two changes raised the copper concentrate grade to 17.52% Cu and reduced nickel recovery to the copper concentrate by 38%, from 44.7% to 27.9%. The nickel concentrate grade also improved, to 4.32% Ni. Copper recovery fell to 81.7%.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 101

 

Rev F reduced the primary grind to 53 µm, with regrinds at 20 and 15 µm. This improved the copper concentrate grade further, to 19.37% Cu, while holding copper recovery steady at 81.3%. Nickel recovery to the copper concentrate fell to 23.1%, and recovery to the nickel concentrate rose to 29.0%.

 

Overall, each revision improved copper–nickel selectivity, and Rev F gave the best overall performance. However, none of the configurations met or came close to the 28% Cu, <0.5% Ni target. The amount of nickel still reporting to the copper concentrate at 53 µm suggests that natural pentlandite floatability and further flowsheet development is required.

 

Figure 13-6
Effect of primary grind on copper and nickel flotation, Master Composite
 
 

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 102

 

Cobalt in pentlandite investigation

 

As a result of the strong pentlandite flotation seen in the copper circuit, electron probe microanalysis (EPMA) was carried out on each geometallurgical unit to determine the cobalt content of the pentlandite. The results are presented in Table 13-7.

 

Table 13-7
Cobalt in pentlandite by geometallurgical unit

 

Geometallurgical Unit % Ni in Pentlandite % Co in Pentlandite
Selebi Main 35.33 1.63
Selebi South 34.89 2.34
Selebi N2 35.05 2.02
Selebi N3 35.03 2.24

 

Cobalt in the Selebi pentlandite ranges from 1.63% to 2.34%. This is approximately two to three times the levels typically reported for copper–nickel deposits where clean copper concentrates are produced. Cobalt substitution in the pentlandite lattice can increase electrical conductivity and enhance flotation response (Lotter et al., 2016). This enrichment is therefore considered a likely contributor to the strong pentlandite flotation observed, and to the difficulty of rejecting nickel from the copper concentrate. On this basis, a bulk copper–nickel flowsheet was selected for further development, in preference to a separate saleable copper concentrate.

 

Development of a bulk flowsheet

 

Given pentlandite floated so strongly into the copper concentrate, development moved to a bulk flowsheet. The aim was a combined copper–nickel concentrate with minimal pyrrhotite recovery. The flowsheet allows for two flotation rates within the sulphides: a fast-floating fraction (chalcopyrite and more strongly doped pentlandite) and a slower-floating fraction (less doped pentlandite).

 

The bulk flowsheet was developed in three stages on the Master Composite:

 

●Rev Ga tested the base bulk circuit, including a nickel scavenger on the first cleaner tailings.

 

●Rev Gb added a cleaner stage for the scavenger concentrate and was run in duplicate.

 

●A simulated locked cycle estimated the effect of recycling the cleaner tailings.

 

The bulk flowsheet is demonstrated below in Figure 13-7.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 103

 

Figure 13-7
Simplified bulk flowsheet

 

 

Key results are summarized in Table 13-8.

 

Table 13-8
Summary of Master Composite saleable copper concentrate testwork

 

Flowsheet Mass % Cu Grade % Cu Rec % Ni Grade % Ni Rec % Co Grade % Co Rec %
Rev Ga – Bulk cleaner conc (BCC) 18.2 8.5 95.3 4.51 61.7 0.217 65.7
Rev Ga – BCC + scavenger conc 29.3 5.45 98.6 3.68 81.3 0.172 84.1
Rev Gb – Final conc (average of duplicates) 19.5 8 96.1 4.38 65 0.21 67.1
Rev Gb – Simulated locked cycle (average) 22 7.25 98.2 4.35 72.4 0.21 75.2

 

Rev Ga (Table 13-8) used a primary grind of d80 = 53 µm, a rougher concentrate regrind to d80 = 25 µm, and a first cleaner at pH 9.5. The first cleaner tailings were retreated in a nickel scavenger. The test showed that the slower-floating pentlandite could be recovered. Adding the scavenger concentrate raised nickel recovery from 61.7% to 81.3%, but the bulk concentrate grade fell to 3.68% Ni.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 104

 

Rev Gb (Figure 13-7 and Table 13-8) added a cleaner stage to upgrade the scavenger concentrate. The combined final concentrate averaged 8.00% Cu and 4.38% Ni, at recoveries of 96.1% Cu and 65.0% Ni. The duplicate tests agreed closely, which shows the flowsheet’s performance is reproducible. The second and third cleaner tailings and the scavenger cleaner tailings were not recycled in this open-circuit format. Together they carried 8.2% of the feed mass, 2.5% of the Cu, 15.8% of the Ni and 14.9% of the Co.

 

Recycling these cleaner tailings was simulated in Excel over six cycles (Table 13-8). The simulation estimated a final bulk concentrate grading 7.25% Cu and 4.35% Ni at 22.0% mass pull. Recoveries were 98.2% Cu, 72.4% Ni and 75.2% Co, which is a gain over the open-circuit Rev Gb results of about 2.1% Cu, 7.4% Ni and 8.1% Co. Nickel grade stayed close to the open-circuit value.

 

The bulk flowsheet addresses the copper–nickel selectivity problem by recovering both metals into one concentrate, with high copper recovery and improved nickel and cobalt recovery. The simulated Rev Gb product is considered representative of a bulk concentrate that could be produced at site. The recycle results are based on a mathematical simulation, so they should be confirmed by physical locked cycle testing.

 

13.2.1.4Conclusions

 

This work has sampled and characterized four geometallurgical units sampled from the Selebi project. A Master Composite was prepared in alignment with the potential production tonnages of these units. This Master Composite was used as test material for flowsheet development. Two flowsheet formats were developed and tested. These were: a selective flowsheet producing a saleable copper concentrate and a bulk base metal concentrate; and a bulk flowsheet producing one base metal concentrate. It was found that some of the pentlandite in this ore floated unusually fast in competition with the chalcopyrite and contaminated the saleable copper concentrate. Investigation showed that this was due to unusually high cobalt tenors in the pentlandite, which had doped the pentlandite and likely increased its flotation capabilities.

 

13.2.2Stark Ventures ore sorting program

 

In 2024, Stark Ventures were engaged by NEXM to investigate whether the Selebi Mines material bulk sample could be upgraded using X-Ray Transmission (XRT) ore sorting technology, following up on the 2023 preliminary amenability study (Stark, 2024). The key objectives were to:

 

●Use XRT to remove low-grade waste material from the bulk sample

 

●Keep metal losses to the rejects to a minimum

 

The information presented in this section is largely derived from the 2025 Stark XRT Test Work Report (Fundikwa, 2025).

 

13.2.2.1Sample and sample preparation

 

In 2024, NexMetals provided a 5,983 kg bulk sample with the same source as the sample sent to Mintek. top size was 36 mm.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 105

 

13.2.2.2Results

 

Sighter tests at TOMRA and allmineral were used to choose the most suitable original equipment manufacturer (OEM), and allmineral was selected to carry out the bulk test work.

 

The bulk test reduced mass by 15.2% by ejecting low-grade reject material, losing 2.1% of the nickel and 2.2% of the copper to the rejects. From a metallurgical perspective, these results show that XRT ore sorting can be considered for removing coarse waste particles upstream of milling and flotation.

 

13.2.2.3Conclusion

 

The bulk test was successfully conducted at allmineral, with comprehensive data collection and analysis confirming the potential of the ore material for XRT sorting.

 

13.2.32025 IMS Ore Sorting Program

 

In 2025, NEXM engaged IMS Engineering, an independent engineering company to carry out an ore sorting test work program under the supervision of NEXM. The program investigated whether Selebi material can be pre-concentrated by rejecting waste early in the process. The specific objective was to utilize X-Ray Transmission (XRT) to obtain a minimum Ni recovery target of 95.0% and a minimum waste ejection of 20.0%

 

The information presented in this section is largely derived from the 2025 IMS Selebi Mine Sensor Sorting Report (Lusinga, 2025).

 

13.2.3.1Sample and sample preparation

 

NexMetals provided a 5,983 kg sample from Selebi Main for X-ray transmission (XRT) ore sorting testwork. It was taken from blasted underground material and on-site geologists hand-picked the sample from the five 4 tonne samples, targeting an overall head grade of 1.35% Cu and 0.70% Ni (Table 13-9).

 

Table 13-9
Selebi Main sample description

 

Unit Workplace Sample ID Brief Description Local X Local Y Local Z Tonnes Collected
Selebi Main 950mL-4040 Sample 1 Massive sulphide band (15%)
Amphibolite schist <5% Sulphides (50%)
Footwall grey gneiss (35%)
38166.6 83610.7 -34.0 4
950mL-4130 Sample 2 Narrow massive sulphide bands (10%)
Amphibolite schist <5% Sulphides (50%)
Hangingwall grey gneiss (40%)
38085.6 83654.3 -34.0 4
950mL - 3920 Sample 3 Narrow sulphide bands (15%)
Semi-massive sulphides (5%)
Weakly mineralized amphibole schist <5% sulphides (40%)
Footwall grey gneiss (40%)
38276.0 83543.9 -34.0 4
1050mL-3775 Sample 4 Massive, semi-massive and disseminates (15%)
Amphibolite schist <5% Sulphides (50%)
Footwall grey gneiss (35%)
38348.1 83409.4 -128.6 4
1050mL-3980 Sample5 Massive, semi-massive and disseminates (15%)
Amphibolite schist <5% Sulphides (50%)
Footwall grey gneiss (35%)
38148.0 83487.2 -128.5 4

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 106

 

Results

 

Sensor sorting tests were conducted on two size fractions, -75 mm +30 mm and -30 mm +10 mm. The -10 mm fraction was analysed for valuable metal deportment to the finer size fractions. Based on the tests that were conducted at IMS Engineering, the following results were found:

 

●For the -30 mm +10 mm fraction, a 95.1% Ni recovery was achieved by ejecting 32.3% of the feed material in that size range as waste. A 97.4% Ni recovery was achieved through an ejection rate of 24.9%.

 

●For the -75 mm +30 mm fraction, a 94.7% Ni recovery was achieved by ejecting 39.9% of the feed material in that size range as waste. To achieve a 97.0% to 98.0% Ni recovery an ejection rate of 25.0% - 30.0% is expected, based on the grade recovery curve created in the beginning of the test campaign.

 

●Analysis of the -10 mm fraction indicated there was no clear deportment to the fine spectrum of the PSD of Ni, Cu or any of the precious metals i.e. Ag, Au, Pt, and Pd.

 

13.2.3.2Conclusion

 

The sensor-based sorting testwork showed that the Selebi material responds well to upfront waste rejection (pre-concentration), and the program met its initial target criteria. However, financial evaluations of both an underground and a surface ore sorting plant did not show a favourable economic case. Ore sorting has therefore not been included in the current process flowsheet.

 

13.2.42024/2025 Metso Testwork Program

 

In 2025, NexMetals engaged Metso to conduct metallurgical test work under the supervision of Fuse Advisors Inc. (Fuse). The testwork was carried out at the Metso Research Center in Pori, Finland. The primary objective of the program was to evaluate the amenability of the Selebi bulk concentrate to pressure oxidation (POX). The specific objectives were to:

 

●Determine the extraction of Cu, Ni, Co, Au, Ag and major impurity elements under varying process conditions.

 

●Assess the impact of key variables, including feed particle size and feed solution composition.

 

The information presented in this section is derived from the 2025 Metso summary presentation. The test work program was discontinued at an intermediate stage as project priorities shifted back to the production of two saleable concentrates.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 107

 

13.2.4.1Sample and sample preparation

 

A bulk Selebi concentrate was produced by XPS under the oversight of Flowsheets Metallurgical Consulting Inc. More than 5 kg of concentrate was generated from the Selebi Master Composite using the bulk flowsheet developed during the 2024–2025 XPS/Flowsheets testwork program. The resulting concentrate sample was shipped to the Metso Research Center in Pori, Finland, for hydrometallurgical testing.

 

Results

 

Test 1 was completed using the as-received feed material with a P80 of approximately 24 µm. The sample was first subjected to pulping in an open autoclave at pH 2 for 30 minutes to dissolve carbonates, using a solution containing 6 g/L Cl⁻ and 2.5 g/L Fe³⁺. This was followed by pressure oxidation (POX) conducted at 220°C, under an oxygen partial pressure of 7 bar, at 9.1% solids, and with a residence time of 2 hours. The test achieved high extraction (solids), yielding 99.8% Cu, 99.7% Ni, and 97.5% Co.

 

13.2.4.2Conclusion

 

Process conditions were unstable during the initial 20 minutes of the test; however, the operation subsequently stabilized and achieved excellent leach recoveries on the Master Composite concentrate. These results confirm the amenability of the Selebi material to pressure oxidation (POX). No further optimization or downstream hydrometallurgical testwork was conducted following this test, as the metallurgical program was reprioritized to focus on the production of two saleable concentrates.

 

13.2.52025/2026 Blue Coast Research Testwork Program

 

In 2025, NexMetals engaged Blue Coast Research (BCR), a commercial metallurgical laboratory, to carry out a test work program under the supervision of Fuse. The program further assessed the potential to produce separate marketable copper and nickel concentrates. The key targets were to reduce nickel misplacement in the copper concentrate to below 1% and to achieve a nickel concentrate grade exceeding 10%. Residual samples from the initial XPS test work program were sent to BCR to replicate the Master Composite and establish a benchmark for comparison.

 

The program comprised the following components:

 

●Flowsheet development using the geometallurgical sample set, blend, and grind size established during the XPS program.

 

●Flowsheet optimization, with particular focus on primary grind size and nickel recovery.

 

●Flowsheet development using a diluted feed and revised blend to better represent the resource.

 

●Variability test work based on the optimized flowsheet.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 108

 

13.2.5.1Sample and sample preparation

 

Initial exploratory testwork at BCR involved combining the geometallurgical samples using the same blending ratios as those applied in the Flowsheets program to replicate the Master Composite. The samples were received at a top size of 3.5 mm, crushed to a final top size of 1.7 mm, and then blended into 2 kg replicate batches for testwork. The resulting head grades were consistent, confirming that the samples were successfully replicated and suitable for benchmarking purposes.

 

During the later stages of the testwork program, two of the geometallurgical samples were blended with waste material from the corresponding geological domains. This dilution was applied to better represent the overall resource head grade and to evaluate the impact of lower feed grades on metallurgical performance and recoveries.

 

13.2.5.2Initial flowsheet development

 

During the initial programs at SGS, a bulk flotation flowsheet followed by copper–nickel separation was developed to produce saleable concentrate grades. The Flowsheets program subsequently adopted a sequential Cu Ni flotation approach. BCR elected to continue with the sequential flowsheet to enable a more detailed evaluation of the individual circuit performance.

 

Copper Concentrate Optimization

 

Rougher flotation tests were conducted at the 75µm primary grind as used in the Flowsheets testwork program. Initial observations indicated that highly reducing conditions (ORP approximately -450 mV) at the mill discharge suppressed copper flotation, producing a dense froth with no visible mineralization. Aeration raised the ORP toward neutral conditions, restoring copper floatability and enabling recovery even without collector addition as seen below in Figure 13-8. The use of lime and soda ash was found to further depress copper recoveries. These results suggest that excessively reducing conditions inhibit sulphide mineral flotation by limiting surface oxidation, and that maintaining a moderately oxidizing environment is critical for effective copper recovery.

 

Figure 13-8
Selebi mill discharge
 

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 109

 

Referring to Figure 13-9, copper rougher and cleaner baseline tests (blue) were conducted under standard parameters using sodium sulphite and TETA as depressants, with pH adjusted to 10.0. These conditions resulted in moderate copper rougher recovery of 85% and significant nickel misplacement of 40%. In contrast, the pre-aeration test at natural pH without depressants (yellow) achieved higher copper recovery of 90% and grade, while achieving the lowest nickel misplacement of 13%. When stainless steel grinding media was used (green), copper recovery was similar to the natural pH condition; however, nickel misplacement increased.

 

Figure 13-9
Copper grade versus recovery and nickel misplacement
   

 

Maintaining copper nickel selectivity in the cleaner circuit proved challenging, with performance shown to be highly sensitive to both collector dosage and pull rate. The best combination of copper recovery, concentrate grade, and minimized nickel misplacement was achieved under natural pH conditions, with a regrind size of 38 µm and conservative dosage of 2 grams per tonne (g/t) Aerophine 3418A. 2-kilogram (kg) batch tests achieved 85% copper recovery at a 27% Cu concentrate grade, with 1% Ni at a grade of less than 1% Ni reporting to the concentrate, as shown in Figure 13-10.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 110

 

Figure 13-10
Copper grade versus recovery
 

 

Nickel concentrate optimization

 

Previous mineralogy indicated pyrrhotite as an abundant sulphide gangue mineral. The close textural association with pentlandite was suspected to limit nickel liberation and reducing overall recovery efficiency.

 

Initial test work using sodium isopropyl xanthate (SIPX) as the primary nickel collector demonstrated limited selectivity, particularly at higher dosages during cleaner stages. Potassium ethyl xanthate (PEX) was subsequently identified as a more selective collector, achieving improved cleaner-stage recoveries. Early results also showed significant nickel losses to Cleaner 1 tails; however, finer regrinding enhanced mineral liberation, improving both grade and recovery. Further gains were achieved by increasing PEX dosage to 40 g/t and extending cleaner flotation time. Overall, the optimized conditions enabled the production of saleable nickel concentrates exceeding 10% grade (Figure 13-11).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 111

 

Figure 13-11
Copper grade versus recovery
 

 

Locked cycle testwork (LCT-1)

 

The flowsheet developed for the locked cycle test (LCT) is presented in Figure 13-12. The LCT was conducted under the conditions that achieved the highest grades and recoveries in the batch testwork. The locked-cycle test passed all stability checks, with mass and metal stability averaging approximately 100% across Cycles 4–6. Nickel cleaning in the copper concentrate improved, yielding 0.64% Ni, while copper results aligned with forecasts at 27.6% Cu with 87% recovery. Nickel exceeded expectations, achieving 10.5% Ni at 56% recovery, with cobalt closely tracking nickel and averaging 102% stability. The final nickel concentrate graded 0.59% Co with a recovery of 64.7%. Table 13-10 summarizes the mass and metal balance of the LCT.

 

Table 13-10
LCT-1: Projected metallurgy – based on cycles 4-6

 

Product Weight Assays % Distribution
g % Cu (%) Ni (%) Co (%) Fe (%) S (%) Cu Ni Co Fe S
Cu Cleaner 3 Conc. 307.9 5.11 27.6 0.64 0.03 36.5 35.0 87.0 2.48 2.2 5.4 10.3
Ni Cleaner 3 Conc. 421.7 7.00 2.43 10.5 0.59 51.0 36.5 10.5 55.9 64.7 10.4 14.8
Ni Cleaner 1 Tail 1,199.3 19.9 0.05 1.16 0.04 58.8 35.8 0.6 17.6 12.8 34.2 41.3
Rougher Tail 4,095.1 68.0 0.05 0.46 0.02 25.2 8.53 1.9 24.0 20.4 50.0 33.6
Calculated Head 6,024.0 100.0 1.62 1.31 0.06 34.3 17.3 100.0 100.0 100.0 100.0 100.0

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 112

 

Figure 13-12
LCT flowsheet progression
 

 

13.2.5.3Flowsheet optimization

 

LCT-1 successfully produced two saleable concentrates and supported advancement to flowsheet optimization. Table 13-11 summarizes a series of subsequent locked cycle tests and batch variability testwork conducted to further refine the flowsheet and align it with the projected mine plan.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 113

 

Table 13-11
LCT-1: Projected metallurgy – based on cycles 4-6

 

Test ID Comp ID Purpose
LCT-1 Master Composite Produce 2 saleable concentrates on Master Composite at 75 µm
LCT-2 Master Composite Optimize flowsheet: primary grind (150 µm) and nickel recovery
LCT-3 Resource Composite Dilute Selebi Main and N3 samples, adjusted geometallurgical blend to match mine plan
Batch Test (F41-F48) Resource Composite Variability testwork Selebi Main, N2, N3 and South Limb
LCT-4 Resource Composite Adjusted Cu regrind to 25 µm, to improve nickel misplacement in copper concentrate. *Results not reported, due to not meeting stability requirements
LCT-5 Resource Composite Adjusted Cu regrind to 25 µm increased collector addition in copper cleaner 1

 

LCT-2 grind and nickel recovery optimization

 

To investigate nickel losses and guide further optimization, the rougher and cleaner tails from the LCT underwent mineralogical analysis, results provided in Figure 13-13. Analysis revealed that a large portion of the rougher and cleaner tails were fine liberated nickel sulphides.

 

Figure 13-13
Nickel deportment and sulphide liberation
   

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 114

 

Batch testwork focused on coarsening the primary grind and managing fines in the nickel cleaner to improve overall nickel recovery. LCT-2 demonstrated that the primary grind size can be coarsened to 150 µm without materially impacting copper performance, while also yielding an improvement in final nickel recovery screening to nickel regrinding to minimize fines generation and recovery loss. The test produced a Cu concentrate grading 27.5% Cu at 86.5% recovery, with nickel misplacement of 1.04%. The Ni concentrate assayed 11.1% nickel at 58.2% recovery (Table 13-12.

 

Table 13-12
LCT-2: Projected metallurgical – based on cycles 4-6

 

Product Weight Assays % Distribution
g % Cu (%) Ni (%) Co (%) Fe (%) S (%) Cu Ni Co Fe S
Cu Cleaner 3 Conc. 292.6 4.78 27.5 1.04 0.05 35.0 35.6 86.5 3.70 3.6 4.8 9.7
Ni Cleaner 3 Conc. 432.7 7.07 2.24 11.1 0.57 49.2 37.1 10.4 58.2 63.9 10.1 15.0
Ni Cleaner 1 Tail 1747.8 28.6 0.03 1.05 0.04 59.2 35.1 0.6 22.3 16.6 48.9 57.4
Rougher Tail 3648.9 59.6 0.06 0.36 0.02 21.0 5.23 2.5 15.8 16.0 36.2 17.8
Calculated Head 6122.0 100.0 1.52 1.35 0.06 34.6 17.5 100.0 100.0 100.0 100.0 100.0

 

LCT-3 resource composite

 

Following initial optimization of the Master Composite, the high-grade geometallurgical units were diluted with gneiss and weakly mineralized amphibolite from Selebi Main and gneiss from the N3 limb to better align with projected mill feed grades. The blend was further adjusted to more accurately reflect the anticipated mining profile, notably increasing the contribution of Selebi Main from 50% to 67% (Table 13-13). These modifications were designed to further challenge the flowsheet and confirm that key performance targets could be achieved at the required concentrate grades.

 

Table 13-13
Master versus resource composite

 

Geometallurgical Unit Master Composite Resource Grade
Mass, % %Cu %Ni Mass, % %Cu %Ni
Selebi Main 50 2.25 1.46 67 1.21 0.76
Selebi South 22.5 1.14 1.04 15 1.17 1.01
Selebi N2 16 0.59 0.96 10.5 0.61 0.92
Selebi N3 11.5 1.49 1.99 7.5 0.89 1.15
Composite (Actual) 100 1.56 1.28 100 1.12 0.87

 

LCT-3 was subjected to the same LCT conditions as LCT-2. The nickel circuit met the 10% Ni grade target, with 53% recovery to final concentrate, consistent with the lower nickel head grade. The copper circuit produced a final copper concentrate grading over 29% Cu at an overall recovery of 81%. Nickel content reporting to the copper concentrate averaged 1.3% Ni, slightly above the targeted specification (Table 13-14).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 115

 

Table 13-14
LCT-3: Projected metallurgical – based on cycles 4-6

 

Product Weight Assays % Distribution
g % Cu (%) Ni (%) Co (%) Fe (%) S (%) Cu Ni Co Fe S
Cu Cleaner 3 Conc. 195.2 3.26 29.4 1.31 0.06 32.5 34.5 80.6 4.87 5.0 4.4 9.6
Ni Cleaner 3 Conc. 276.6 4.62 3.78 10.0 0.50 47.1 36.5 14.7 53.0 56.5 8.9 14.3
Ni Cleaner 1 Tail 943.5 15.8 0.06 1.18 0.04 58.3 35.4 0.7 21.2 16.7 37.7 47.5
Rougher Tail 4565.5 76.3 0.06 0.24 0.01 15.6 4.41 3.9 20.9 21.8 49.0 28.6
Calculated Head 5980.7 100.0 1.19 0.88 0.04 24.4 11.8 100.0 100.0 100.0 100.0 100.0

 

Variability testwork

 

Variability testwork was conducted on N2 and South Limb samples, as well as on diluted Selebi Main and N3 materials. The N2 and South Limb samples exhibited difficulty in achieving the target copper concentrate grade within the copper circuit, accompanied by higher than target nickel misplacement.

 

Selebi Main, which has the lower nickel head grade, was unable to achieve final concentrate grade targets without incurring reduced recoveries (Figure 13-14).

 

Figure 13-14
Individual geometallurgical unit Cu and Ni grade versus recovery
   

 

Due to limited sample availability, only a restricted number of investigation tests could be conducted on each geometallurgical sample; however, additional testwork was completed for the South Limb and N2 zones. Reducing the copper regrind size from 35 µm to approximately 27 µm resulted in a significant improvement in copper concentrate grade, along with a notable reduction in nickel misplacement. For the South Limb (F-41 and F-46), the finer regrind increased the copper concentrate grade from 23% to 26% Cu and reduced the nickel grade in the copper concentrate to below 1% (Figure 13-15). Similarly, in the N2 zone, the finer regrind increased the copper concentrate grade from 11% to 21% Cu and decreased the nickel grade in the copper concentrate from 4.2% to 1.7% Ni (Figure 13-15).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 116

 

Figure 13-15
South Limb and N2 unit Cu grade versus recovery and Ni grade versus Cu rec
   

 

LCT-4/5 resource composite

 

Due to the elevated nickel misplacement of 1.3% in the LCT-3 copper concentrate, and informed by the variability optimization results, an additional locked cycle test (LCT) was conducted at a finer copper regrind to better control nickel misplacement and improve copper grade and recovery. LCT-4 did not meet stability criteria and is therefore excluded from this report; however, it indicated that increased collector addition in Copper Cleaner 1 was required to maintain copper recovery when reducing the regrind size from 35 µm to 25 µm.

 

LCT-5 was subsequently conducted at a 25 µm copper regrind with an increased Aerophine 3418A dosage in Copper Cleaner 1 (from 6 g/t to 10 g/t). The test produced a copper concentrate grading 30.2% Cu at 86.4% recovery, with Ni reduced to 0.91%, achieving the target for nickel misplacement. The nickel concentrate assayed 9.07% Ni at 47.4% recovery (Table 13-15). The improvement in copper grade and reduction in nickel misplacement confirm the effectiveness of the finer regrind. However, as conditions in the nickel circuit were not optimized in parallel, a decrease in nickel grade and recovery was observed. Further investigation into nickel circuit reagent selection and dosage is recommended in subsequent testwork to ensure nickel performance targets are achieved under the revised conditions.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 117

 

Table 13-15
LCT-5: Projected metallurgical – based on cycles 3-5

 

Product Weight   Assays
g % Cu (%) Ni (%) Co (%) Fe (%) S (%) Cu Ni Co Fe S
Cu Cleaner 3 Conc. 194.6 3.26 30.2 0.91 0.04 33.0 35.0 86.4 3.42 3.3 4.4 9.7
Ni Cleaner 3 Conc. 270.1 4.53 2.11 9.07 0.46 50.1 36.7 8.4 47.4 52.7 9.3 14.2
Ni Cleaner 1 Tail 887.1 14.9 0.05 1.36 0.05 55.8 35.1 0.7 23.3 18.8 34.0 44.5
Rougher Tail 4611.6 77.3 0.07 0.29 0.01 16.5 4.78 4.6 25.9 25.2 52.3 31.6
Calculated Head 5963.4 100.0 1.14 0.87 0.04 24.4 11.7 100.0 100.0 100.0 100.0 100.0

 

13.2.5.4Concentrate Quality

 

Final concentrate assays from LCT 1 (Table 13-16) indicate that both the copper and nickel concentrates are likely to meet typical commercial smelter acceptance specifications, supporting their marketability. For copper concentrates, elements that commonly attract smelter penalties include arsenic, antimony, bismuth, lead + zinc, mercury, nickel + cobalt, fluorine + chlorine, cadmium, selenium + tellurium, and insolubles (e.g., SiO₂, Al₂O₃ and MgO). For nickel concentrates, they include arsenic, lead, mercury, zinc, chlorine + fluorine, and magnesia (MgO). With the exception of nickel + cobalt in the copper concentrate (0.77% combined), which may exceed the penalty threshold of some smelters, all analysed impurities are below typical penalty thresholds. The nickel concentrate’s very low MgO content is also favourable for smelting. Overall, the results suggest no significant smelter-related concerns with concentrate quality, although lock cycle test results are indicative only and should be confirmed on variability samples.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 118

 

Table 13-16
Lock cycle-1 copper and nickel concentrate quality assessment
Analyte Analytical Method Unit Copper Concentrate Nickel Concentrate
Potentially Payable Metals
Ni 4AD-ICP % 0.744 10.593
Cu 4AD-ICP % 27.772 2.491
Co 4AD-ICP % 0.023 0.546
Ag 4AD-ICP g/t 47.5 20.2
Au FA-ICP g/t 0.75 0.27
Pd FA-ICP g/t 0.57 0.64
Pt FA-ICP g/t 0.36 0.84
Other Elements
As 4AD-ICP ppm 4 2
Sb 4AD-ICP ppm 51 20
Bi 4AD-ICP ppm 10 34
Cd 4AD-ICP ppm 33.9 9.7
Cl INAA % 0.01 < 0.01
Ctot Eltra % 0.26 0.05
F FUS-ISE % < 0.01 < 0.01
Fe 4AD-ICP % 36.21 50.15
Pb 4AD-ICP ppm 44 29
MgO FUS-XRF % 0.26 < 0.01
Hg 1G ppb 19 11
Mo 4AD-ICP ppm <1 3
Se 4AD-ICP ppm 25 <10
SiO2 FUS-XRF/FUS-ICP % 0.04 0.57
Al2O3 FUS-XRF/FUS-ICP % 0.71 0.23
Stot Eltra % 34.88 35.73
Te 4AD-ICP ppm 58 48
Zn 4AD-ICP ppm 670 358

 

13.2.5.5BCR testwork summary

 

The 2025–2026 Blue Coast Research (BCR) testwork program was undertaken to evaluate the ability to produce marketable copper and nickel concentrates while reducing nickel misplacement in the copper concentrate to below 1% and achieving a nickel concentrate grade above 10%. The program included flowsheet development, optimization, and variability testing using both master and resource composites representative of the Selebi deposit. Initial locked cycle testwork (LCT-1) successfully produced saleable concentrates, while subsequent optimization (LCT-2 and LCT-3) refined grind size and feed composition to improve nickel recovery and align with the mine plan. Variability testing highlighted challenges in copper grade and nickel misplacement for certain zones, which were mitigated through finer copper regrinding. Final testing (LCT-5) demonstrated that a finer regrind combined with increased collector addition improved copper grade, reduced nickel misplacement to below 1%, and maintained overall metallurgical performance in the copper circuit. The final concentrate assays from (LCT 1) suggest that both the copper and nickel concentrates are likely to be clean, marketable products, with no penalties for deleterious elements expected.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 119

 

13.2.6Metallurgical Estimate and Assumptions

 

Recoveries for the Selebi deposit were estimated from the most recent testwork program completed at BCR.

 

The test samples were collected from blasted material in the underground workings, taken from the Selebi Main and Selebi North (SL, N2 and N3) domains. These samples are considered to be reasonably reflective of the early years of mine production and are considered appropriate for developing preliminary metallurgical assumptions.

 

The BCR program included a series of locked cycle tests that progressively developed and optimized the sequential copper–nickel flotation flowsheet. Grind size, reagent regime and feed composition were evaluated across the series. The metallurgical assumptions are based on the average of LCT 2 and LCT 3. Both tests were run at a grind size of 150 µm and cover a range of feed grades representative of the updated MRE grades.

 

Silver was not tracked through the LCT program for recovery determination. Silver recovery was therefore estimated from the mass pull, head and concentrate assays.

 

Table 13-16
Metallurgical recovery assumptions – average of LCT-2 and LCT-3

 

Product Assays % Distribution
Cu (%) Ni (%) Co (%) Ag (ppm) Fe
(%)
S
(%)
Cu Ni Co Ag Fe S
Cu Cleaner 3 Conc. 28.5 1.17 0.06 55 33.8 35.1 83.6 4.28 4.3 40.5 4.6 9.7
Ni Cleaner 3 Conc. 3 10.6 0.54 25 48.1 36.8 12.6 55.6 60.2 26 9.5 14.7

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 120

 

13.3Conclusions and QP Recommendations

 

Recent testwork utilized fresh samples obtained from underground blasting at multiple locations, including Selebi North (South Limb, N2, and N3) and Selebi Main. These samples were selected and prepared by Flowsheets and were used in both the XPS/Flowsheets and BCR testwork programs. The Fuse QP considers these samples to be representative of the early years of mine development and appropriate initial flowsheet development. However, it is recommended that future work incorporate systematic drill core sampling that is spatially representative of the deposits. In particular, Selebi Main and potential expansion areas should be comprehensively sampled to assess potential mineralogical variability with depth and lateral extent.

 

Preliminary flotation results indicate that copper–nickel separation is achievable. However, more representative sampling and testwork are needed to confirm that target concentrate grades can be achieved consistently across all deposit areas and that nickel misplacement to the copper concentrate stays within acceptable limits. The primary grinding conditions that support effective separation also need to be better understood, to ensure the same performance can be reproduced at plant scale.

 

Furthermore, pre-concentration techniques have not been applied to Selebi materials in flotation testing to date. Should pre-concentration be advanced, further metallurgical testwork on upgraded material will be required to evaluate its impact on recovery and overall process performance.

  

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 121

 

14.Mineral Resource Estimation

 

14.1Introduction

 

The Mineral Resource Estimate (MRE) was prepared and completed in October 2026 by MSA, a third-party firm comprising mining experts in accordance with 17 CFR § 229.1302(b)(1).

 

The MRE was undertaken using the following software: Leapfrog Geo for selected lithological modelling; Datamine Studio RM for selected lithological modelling, block modelling, and grade estimation; and Datamine Supervisor for statistical and geostatistical evaluation.

 

14.2Mineral Resource Disclosure Basis

 

Selebi Main and Selebi North are spatially separate deposits with their own unique characteristics. Separate Mineral Resource models were prepared for Selebi Main and Selebi North.

 

The Mineral Resource Estimate (“MRE”) for the Selebi Mines Project was prepared by MSA.

 

For the purposes of this Technical Report Summary (“TRS”), the Mineral Resources are prepared and reported in accordance with SEC Regulation S-K 1300. MSA is the QP, as defined by Subpart 1300 of Regulation S-K, responsible for the Mineral Resource disclosure presented herein. The MSA QP has reviewed the estimation methodology, classification criteria and supporting technical information and considers the Mineral Resource Estimate suitable for disclosure under SEC Regulation S-K 1300. The MSA QP has reviewed and approved the scientific and technical information summarised in this section.

 

14.3Selebi Main

 

14.3.1Mineral Resource Estimation Database

 

The final date of acceptance of data into the MRE was 21 September 2026. A summary of the data received is tabulated in Table 14-1.

 

Of the 270 drillholes in the database, 254 intersected mineralization. The others were mainly of in insufficient depth while one drillhole, sd112, intersected a dolerite dyke and is unmineralized. The database contained 31 wedges and deflections, and these were used for geological modelling and grade estimation following the relevant data analysis.

 

Table 14-1
Database Summary

 

Program Number of Drillholes Total Metres
BCL Surface (pre-2010) 69 81,869
BCL Underground (2007 – 2010) 171 5,653
PNRPL 2022 - 2023 15 14,293
PNRPL 2025 - 2026 15 26,739
Total Drillholes 270 128,554

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 122

 

Drillhole spacing within the area of interest ranges from approximately 200 m x 200 m to a spacing of as close as approximately 25 m strike by 10 m dip for the underground fan drilling.

 

Figure 14-1
Plan showing location of drillhole collar by drilling program
 

Note: Coordinates as local mine grid

 

14.3.2Data Validation and Preparation

 

The data validation process included the following checks:

 

●Examining the sample assay, collar, down-hole survey and geology data to ensure that the data are complete for all the drillholes.

 

●Examining the de-surveyed data in three dimensions to check for spatial errors.

 

●Examination of the assay and density data to ascertain whether they are within expected ranges.

 

●Checks for “FROM-TO” errors, to ensure that the sample data do not overlap one another or that there are no unexplained gaps in the sampling.

 

14.3.2.1Spatial location of historical data

 

BCL Underground Drilling and Sampling

 

Down hole surveys were not completed for the BCL short underground drillholes and typically the dip and dip-direction were surveyed at the collar, else the set-up inclination and direction was accepted. Drillhole collar surveys were completed after the holes had been drilled and potential for errors exists. MSA examined the drillhole data spatially and drillholes were rejected where obvious errors were encountered, which typically included:

 

●Collars outside of underground excavations.

 

●Holes with directions 180 degrees to the planned drilling direction.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 123

 

●Drillhole fans where positive dips were incorrectly assigned to down-holes and negative dips to up-holes.

 

Underground holes drilled from the sill drives were not included as they provided partial intercept data and would not add any value to the data set. Underground channel data were also not included.

 

Due to the lack of drillhole survey data, and the sensitivity of the Mineral Resource to low intersection angles, underground holes drilled downwards were rejected as well as those holes that were not drilled orthogonal to strike. Holes that were accepted were from sets of fan drilled holes collared from the footwall haulage beneath the sill-drive. Specifically, these included horizontal holes orthogonal to strike, vertical up-holes and the inclined hole in a fan drilled closest to a normal intersection with the mineralization.

 

BCL Surface Holes

 

Surface holes at Selebi Main are relatively widely spaced and the majority of the drilling of relevance to the MRE is outside of the near mined area that has extensive underground drilling coverage. Spatial issues are less obvious in the absence of closely spaced underground data and underground excavations. The mineralized intercepts of BCL surface drillholes were examined for alignment with the mineralized structures and no issues were found. The MRE is not sensitive to subtle errors in the surface drilling intercepts outside of the underground areas due to the relatively consistent general dip and strike. Discrepancies between intercepts from multiple deflections obtained from wedges were noted on a scale of less than 5 m, some of which may be due to local irregularities in the mineralization, which are common at Selebi Main. None of the BCL surface drillholes were rejected due to spatial errors.

 

14.3.2.2Treatment of unsampled or missing assays

 

Two historical drillholes, sd38 and sd74, contained missing assays for either Ni or Cu for eight samples. These were set to 0.001 % for both Ni and Cu based on adjacent samples not reflecting mineralization. Approximately 56 underground drillhole samples contained zero values for Ni and Cu, and these were retained as zero values. The underground drillholes did not contain Co assays, and 302 samples did not have density values. Regression formulas were used in these instances to ensure that relationships between highly correlated attributes are locally retained. A summary of the data availability, including for other assays not used in the MRE, is shown in Table 14-2.

 

Table 14-2
Assay availability in final dataset

 

Total Samples Ni Cu Co Pd Pt Au Ag S SG
5,453 5,396 5,394 2,328 1,228 1,228 1,228 1,228 2,328 5,151
Percentage of Total 99% 99% 43% 23% 23% 23% 23% 43% 94%

 

14.3.2.3Regression Analysis

 

A regression analysis was conducted to be able to assign values for the missing Co and relative density values. BCL developed a regression formula for Selebi Main relative density based on the Ni grade and density of thousands of underground drillhole core samples. This regression was verified as reasonable and used by MSA to assign any missing density values. The Selebi Main regression formula is:

 

Density = 0.3696*Ni + 2.9469

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 124

 

Ni and Co displayed a strong correlation, and the following polynomial regression formula was derived (Figure 14-2):

 

Co = -0.0072*Ni2 + 0.0576*Ni

 

Figure 14-2
Ni-Co regression analysis

Source: MSA, 2026

 

The regression for Co was largely applied to the underground drillhole data, which informs a small area of the Mineral Resource.

 

14.3.3Mineralization Criteria

 

A Net Smelter Return (NSR) value of greater or equal to USD 70/t was used as a threshold to create a mineralized volume. The parameters for NSR are tabulated in Table 14-3.

 

Metal prices were based on the previous three to five years, while also considering long-term forecasts sourced from industry and broker research. The nickel price is subject to large fluctuations, primarily driven by Indonesian supply that dominates world markets. Given the fluctuations, the nickel price assumption was based on a five-year average (January 2022 to August 2026) LME spot price rounded up to the nearest 1,000 USD/t (20,000 USD/t or 9.1 USD/lb). The price for cobalt was based on the LME average spot price over the same time period. Copper has shown a general upward trend in price over the past two years, from average LME prices of approximately USD4.2/lb in 2024 to approximately 6.1USD/lb in 2026 up until the end of August. The approximate average three-year price of 5.1 USD/lb for copper for 2024, 2025 and 2026 (to end August 2026) was therefore used.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 125

 

Other parameters were based on metallurgical test work and a marketing study completed for NEXM (Aird, 2026). The NSR calculation assumes the production and sale of two concentrates, one for nickel and the other for copper.

 

Table 14-3
NSR parameters (two concentrate option)

 

Parameter Nickel Copper Cobalt
Cu Concentrate Recovery (%) 4.28 83.6 4.3
Ni Concentrate Recovery (%) 55.6 12.6 60.2
Cu Concentrate Grade 0.75 27.7 0.023
Ni Concentrate Grade 10.5 2.5 0.5
Cu/Ni Concentrate Moisture Percent 8
Concentrate Transport USD/wmt 160
Treatment Charge Cu Concentrate USD/dmt 82.5
Treatment Charge Ni Concentrate USD/dmt 0
Metal from Cu Concentrate: Payability (%) 96.5
Metal from Ni Concentrate: Payability (%) 78 40 50
Metal from Cu Concentrate: Refining Cost USD/lb (on payable metal) 0.08
Metal; from Ni Concentrate: Refining Cost USD/lb (on payable metal) 0
Metal Price per lb 9.1 5.1 20.0

 

A copper equivalent (CuEq) value is stated in certain tables of this report. CuEq was calculated based on relative recovered value received for each metal excluding costs. Received value for each metal was calculated using the formula: in-situ grade*concentrator recovery*payability*metal price. The ratio between received copper value and total other metal value was then used to calculate CuEq using the formula CuEq =(Cu%*96.4+Ni%*87.0+Co%*132.7)/96.4.

 

14.3.4Geological Modelling and Estimation Domains

 

Geological modelling was undertaken in Datamine Studio RM3 utilizing implicit vein modelling techniques. The surface and underground drillhole intercepts were coded as either Upper or Lower domain based on thickness, spatial relationship, lithology and grade. Domain codes targeted a minimum thickness of 1.5 m inclusive of dilution and a minimum NSR of USD70/t to ensure the mineralization model incorporated principles of reasonable prospects for economic extraction (RPEE). Any intercepts that were less than 1.5 m wide using the USD70/t threshold were diluted with the surrounding low-grade samples until the minimum thickness criterion was achieved.

 

The following three-dimensional models were created:

 

●Upper Domain mineralization. This is the most continuous domain and always existed in the model.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 126

 

●Lower Domain mineralization. This is a discontinuous domain and was modelled in areas where several contiguous intercepts occur.

 

●Dyke using interpretation by PNRPL.

 

●Mined out underground. PNRPL provided the available underground digital survey data. MSA digitized an area to enclose the stoped-out area (including any remnant pillars) and separately the development. The mined-out area assumes that the entire thickness of mineralization has been mined/sterilized and all areas above the stoped-out digital survey data are depleted.

 

A view of the modelled mineralized zones is presented in Figure 14-3.

 

Figure 14-3
Mineralization domains relative to surveyed mined aras and drillhole data (view looking north)

 

Note: Coordinates as local mine grid

 

14.3.5Statistical and Geostatistical Analysis

 

14.3.5.1Sample Compositing

 

All samples within the mineralized zones were composited to 1 m by length and density weighting, based on the dominant sample length. Figure 14-4 illustrates the sample length distribution of the uncomposited drillhole data within the mineralized zones. A statistical comparison between the composited and uncomposited data within the mineralization zones is summarized in Table 14-4.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 127

 

Figure 14-4
Histogram of sample interval length

 

   

Source: MSA, 2026

 

Table 14-4
Composited vs uncomposited statistics 

 

Domain Assay Uncomposited 1 m composites
Samples Min Max Mean CV Samples Min Max Mean CV

Upper

Domain

Ni % 1874 0.00 6.83 0.80 1.26 1431 0.00 5.44 0.76 1.12
Cu % 1874 0.01 18.93 1.64 1.67 1431 0.01 14.20 1.50 1.30
Co % 492 0.00 0.18 0.04 0.91 341 0.00 0.16 0.05 0.76
Pt g/t 162 0.00 0.55 0.05 1.60 138 0.00 0.55 0.06 1.40
Pd g/t 162 0.00 0.48 0.09 1.00 138 0.00 0.34 0.09 0.81
Au g/t 162 0.00 0.88 0.07 1.65 138 0.00 0.68 0.06 1.28
Ag g/t 162 0.25 32.10 4.89 1.06 138 0.25 23.82 5.11 0.87
S % 489 0.01 37.50 12.47 1.02 340 0.04 37.30 13.77 0.86
SG 1817 0.00 5.07 3.30 0.17 1408 0.00 4.94 3.29 0.16

Lower

Domain

Ni % 234 0.00 3.64 0.84 1.14 183 0.02 3.44 0.78 0.98
Cu % 232 0.00 18.25 1.35 1.78 182 0.01 9.18 1.27 1.28
Co % 225 0.00 0.15 0.04 0.95 180 0.00 0.14 0.04 0.82
Pt g/t 141 0.00 0.52 0.05 1.25 118 0.00 0.50 0.05 1.16
Pd g/t 141 0.00 0.71 0.07 1.24 118 0.00 0.69 0.07 1.12
Au g/t 141 0.00 0.40 0.04 1.30 118 0.00 0.38 0.04 1.20
Ag g/t 141 0.25 53.40 4.82 1.51 118 0.25 35.80 4.64 1.18
S % 225 0.01 34.40 10.32 1.09 180 0.05 34.27 9.72 0.98
SG 226 2.51 5.13 3.43 0.16 177 2.60 5.13 3.43 0.14

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 128

 

14.3.5.2Evaluation of Outliers (Grade Capping)

 

Grade capping was applied to the 1 m composite samples for Ni, Cu, Co and density to restrict the influence of outliers that have a low probability of occurrence. Selection of the top cut (grade capping) values was based on histograms and log-probability plots. A summary of the grade capping applied is presented in Table 14-5.

  

Table 14-5
Global top-cap statistics

 

Variable Data Mean Max CV Samples Top-cap
value
Percentile Number
capped
Ni % Raw 0.21 5.44 2.43 7321      
Capped 0.21 3.20 2.41 7312 3.2 99.9 9
Change % 0.3 41.1 0.6 0.1      
Cu % Raw 0.37 14.2 2.93 7321      
Capped 0.37 9.2 2.85 7305 9.2 99.8 16
Change % 1.1 35.2 2.5 0.2      
Co % Raw 0.02 0.16 1.42 2121      
Capped 0.02 0.12 1.41 2113 0.12 99.6 8
Change % 0.3 25.0 0.8 0.4      
SG Raw 2.77 5.13 0.29 7643      
Capped 2.77 4.5 0.29 7592 4.5 99.3 51
Change % 0.0 12.3 0.20 0.7      

 

14.3.6Core Recovery

 

The fresh igneous rock at Selebi Main is competent and the MSA QP observed that the core loss was minimal.

 

14.3.7Density

 

For the mineralized zones, in-situ density values were estimated into the block model using the relative density measured on site using the Archimedes method, and the regressed values.

 

14.3.8Moisture

 

All estimates are on a dry basis.

 

14.3.9Variography

 

Variography was undertaken in Datamine’s Supervisor software. Data were transformed to normal scores and the modelled variances were back transformed for grade estimation. The variogram rotation was aligned with the down-plunge direction and in the mineralized plane, although it was observed that Ni has a slightly different plunge to Cu (Table 14-10).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 129

 

Table 14-6
Semivariogram rotation angles – Selebi Main
Domain Variable Rotation Angle Rotation Axis
Upper Ni % 20 140 45 3 (Z) 1 (X) 3 (Z)
Cu % 20 140 25 3 (Z) 1 (X) 3 (Z)

 

The spherical variogram models are not well structured and show a high proportion of short-range variability (Figure 14-5 and Figure 14-6). A summary of the variogram parameters is presented in Table 14-7.

 

Figure 14-5
Ni grade semivariograms for Upper domain
 

Source: MSA, 2026

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 130

 

Figure 14-6
Cu grade variograms for Upper domain
 

Source: MSA, 2026

 

Table 14-7
Semivariogram parameters – Selebi Main

 

Variable Nugget Effect Sill 1

Range of the First Structure

(m)

Sill 2

Range of the Second Structure

(m)

Sill 3

Range of the Third Structure

(m)

1 2 3 1 2 3   1 2 3
Upper domain
Ni % 0.46 0.40 25 40 12 0.40 240 240 12 - - - -
Cu % 0.46 0.33 20 20 10 0.33 70 140 10 0.09 210 320 10

 

Co data were not available for the closely spaced underground drillholes rendering short distance continuity analysis less effective. Due to the strong correlation between Ni and Co, the Ni variograms were used for Co.

 

14.3.10Block Model and Grade Estimation

 

14.3.10.1Block Model Parameters

 

A rotated block model (204 degrees on X and 40 degrees on Z) was produced, with a parent block size of 25 mX by 25 mY by 2 mZ. The X (easting) and Y (northing) dimensions accommodate locally varying dip where there are closely spaced data and consider the results of a kriging neighbourhood analysis (KNA; Figure 14-7). Sub-celling of up to 1/5th of the parent block size was used to ensure adequate resolution on the edges of geological domains.

 

The primary block model attributes relate to the estimated attributes; Ni, Cu, Co and density. Wireframe dip, dip direction, and true thickness were included to allow for dynamic anisotropy and mining considerations.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 131

 

Figure 14-7
KNA block size analysis
 

Source: MSA, 2026

 

14.3.10.2Search parameters and number of samples

 

The search ellipsoid parameters were based on the variography results.

 

The final search ellipsoid parameters are as follows:

 

●Search Distances: 150 m (major), 100 m (semi-major), 20 m (minor).

 

●Ellipsoid rotation angles: 20° about Z, 140° about X, 45° about Z for Ni and Co and 25° for Cu.

 

Where a block estimate was not achieved with enough sample composites in the first search ellipsoid, the ellipsoid was expanded by a factor of 2 and then 3.

 

A kriging neighbourhood analysis (KNA) was carried out on the 1 m composite sample nickel grade to guide the selection of the number of sample composites used for block estimation (Figure 14-8). A minimum of 15 composite samples and maximum of 40 composite samples was used for the first search, a minimum of 10 and maximum of 20 for the second search, and a minimum of 5 and maximum of 20 samples for the third search. Maximum composites allowed from an individual drillhole for block estimation was set at 4 to ensure estimates were achieved from an array of drillholes.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 132

 

Figure 14-8
KNA number of samples analysis
 

Source: MSA, 2026

 

14.3.10.3Grade Estimation

 

Nickel, copper, and cobalt grades were interpolated into the rotated block model using ordinary kriging. Relative density and true thickness were estimated using inverse distance squared. Gold, silver, platinum and palladium were not estimated due to low data coverage (23%) and they not being spatially representative as grades for these elements were only available for the PNRPL holes that were predominantly drilled in the southern area.

 

The search volume was aligned with the semivariogram orientation, and dynamic anisotropy was applied to accommodate variations in the strike and dip of the mineralization.

 

Hard boundaries were utilized so that only samples within each domain were used for the estimation of the grade within that domain. An NSR value was calculated within the block model, using the estimated grades, utilizing the same parameters as used for the drillhole data NSR calculation. Block model grade and NSR value distribution plots are presented in Figure 14-9 to Figure 14-14.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 133

 

Figure 14-9
Upper Domain NSR (USD/t) distribution – plan view
 

Note: Coordinates as local mine grid

 

Figure 14-10
Upper Domain Ni (%) distribution - plan view
 

Note: Coordinates as local mine grid

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 134

 

Figure 14-11
Upper Domain True Thickness (m) distribution – plan view
 

Note: Coordinates as local mine grid

 

Figure 14-12
Lower Domain NSR (USD/t) distribution – plan view
 

Note: Coordinates as local mine grid

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 135

 

Figure 14-13
Lower Domain Ni (%) distribution: plan view
 

Note: Coordinates as local mine grid

 

Figure 14-14
Lower Domain True Thickness (m) distribution – plan view
 

Note: Coordinates as local mine grid

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 136

 

14.3.11Block Model Validation

 

Validation of block-models was carried out by visual comparison of drillhole and block grades in sections (Figure 14-15 and Figure 14-16), global average grade comparison and swath plots.

 

Figure 14-15
Block model NS cross section
 

Note: Coordinates as local mine grid

 

Figure 14-16
Block model NE-SW cross section
 

Note: Coordinates as local mine grid

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 137

 

14.3.11.1Swath Plots

 

The swath plots confirmed that the model reflects grade trends with no consistent bias for nickel, copper, and cobalt. Swath plots for the Upper Domain are presented in Figure 14-17.

 

14.3.11.2Statistical Validation

 

A comparison between the mean block model and 1 m composite sample grades (capped) is presented in Table 14-8 for both mineralization domains within the Inferred area. The differences between the data and model are well within acceptable limits and generally less than 5% except for Cu, which was 10%. This was examined further and explained by some lower copper grade intercepts in sparser drilled areas having a larger influence on the model than the better drilled areas.

 

Table 14-8
Statistical comparison of block model and composite means

 

Domain Assay 1 m Composite Mean Block model Mean Percent difference (block model to data)
Upper Domain Ni % 0.92 0.95 3%
Cu % 1.62 1.46 -10%
Co % 0.06 0.06 -3%
SG 3.42 3.33 -2%
Lower Domain Ni % 0.75 0.77 3%
Cu % 1.37 1.33 -3%
Co % 0.04 0.04 3%
SG 3.43 3.40 -1%

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 138

 

Figure 14-17
Swath Plots (Upper domain)
   
   

Note: Coordinates as local mine grid, Source: MSA, 2016

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 139

 

14.3.12Mineral Resource Classification

 

The Selebi Main MRE has been classified as Measured, Indicated or Inferred Mineral Resource in accordance with SEC Regulation S-K 1300. No Measured Mineral Resources were declared for the Project.

 

14.3.12.1Approach to Classification

 

Classification of the Selebi Main Mineral Resource was based on the degree of geological uncertainty, grade continuity and variability, frequency of the drilling data and confidence in the data.

 

The main considerations in terms of the Mineral Resource classification are as follows:

 

●Confidence of the geological and mineralization model:

 

◌The confidence in the mineralization model (NSR) is good on a broad scale it being informed by adequate drilling and constrained to a distinct geological unit. The Upper domain occurring in a planar unit that extends between approximately 1.5 km and 2.5 km along strike, and from surface to approximately 4.5 km down plunge (approximately 1.9 km vertically), remaining open at depth.

 

◌Local variability occurs, over a scale of metres and tens of metres that cannot be captured in the geological model with the current drillhole spacing.

 

◌The mineralized zones are continuous, occurring in a folded unit that extends between approximately 1.5 and 2.5 km along strike and from surface to approximately 2.7 km down plunge (approximately 2.0 km vertically), remaining open at depth.

 

◌Structural, discontinuities are not common. A single large dyke has been modelled.

 

●Database quality including presence and performance of QAQC:

 

◌The data collected by PNRPL passes QAQC tests. The quality of the BCL assays is less certain.

 

◌The similarity of grade distributions between the BCL data and the PNRPL data has not been confirmed due to relatively large distances between BCL and PNPRL drillhole intercepts. An intercept from a single deflection drilled from a BCL drillhole by PNPRL compared well with the nearby BCL intercept.

 

◌The upper portion of the Mineral Resource is informed by close spaced fan drilling on sections 25 m apart in near mined areas that were completed by BCL. Their positions are confirmed by their alignment with underground workings. The BCL underground data informs a small area of the Mineral Resource to approximately 150 m deeper than the mined out area.

 

●Grade shell continuity is high for the Upper domain and sporadic for the Lower domain. Thickness variability of the grade shell and grade within the grade shell is high over short distances and cannot be captured at the current drillhole spacing.

 

●The grade model validation is acceptable.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 140

 

14.3.12.2Summary of Mineral Resource Classification

 

Considering the aforementioned factors, the Selebi Main Mineral Resource has been classified as Inferred taking into account data quality, geological modelling uncertainty, drillhole spacing and kriging outputs:

 

●The majority of the Inferred Mineral Resource is informed by drillholes with an approximate spacing of 200 metres or significantly less in and around the mined areas.

 

●The Mineral Resource extent was extrapolated a maximum of 100 metres along strike, 150 metres down plunge or the lesser of halfway to a below threshold drillhole intercept.

 

●Areas of potential exist in the block model outside the classified area that have been intercepted by historical and PNRPL drillholes (refer to Section 10); however, the data are sparse and do not allow for reporting of a Mineral Resource. Classification plots for the individual domains are presented in Figure 14-18 and Figure 14-19.

 

Figure 14-18
Plan view of Upper domain classification
 

Note: Coordinates as local mine grid

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 141

 

Figure 14-19
Plan view of Lower domain classification
 

Note: Coordinates as local mine grid

 

14.3.13Assessment of Reasonable Prospects for Economic Extraction (RPEE)

 

The MSA QP considers that given the depth, thickness and dip of the Mineral Resource a likely primary method of mining will be underground sub-level open stoping. Current metallurgical testwork supports flotation to produce separate copper and nickel concentrates.

 

A cut-off NSR value of USD75/t was applied based on mining costs, concentration costs and general and administration costs (G&A) as shown in Table 14-9. In assessing “reasonable prospects for economic extraction” (RPEE), the Mineral Resource was queried to ensure that at a minimum vein thickness of 1.5 m an NSR cut-off value of USD75/t was achieved. All of the block model within the Inferred boundary passes this constraint. Block model cells of less than USD75/t NSR occur within the mineralization model, however, they are included as internal dilution that must necessarily be included to extract the higher grade mineralization around them and are reported as part of the Mineral Resource. It is the MSA QP’s opinion that, due to irregular massive sulphide veining, opportunities to separate out the below cut-off value material requires close spaced drilling before such selectivity within the vein can be applied.

 

Table 14-9
NSR cut-off value parameters

 

Parameter Unit Value
Mining Cost USD/t mined 47.6
Concentrate production cost USD/t milled 20.0
G&A USD/t milled 5.5

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 142

 

The reader is advised that the assessment of economic potential that is incorporated in the Mineral Resource is a high-level assessment and is solely for the purpose of reporting Mineral Resources with reasonable prospects for economic extraction and does not represent an attempt to estimate Mineral Reserves.

 

14.3.14Mineral Resource Statement

 

For the purposes of this Technical Report Summary (“TRS”), the Mineral Resources are prepared and reported in accordance with SEC Regulation S-K 1300. MSA is the QP, as defined by Subpart 1300 of Regulation S-K, responsible for the Mineral Resource disclosure presented herein. The MSA QP has reviewed the estimation methodology, classification criteria and supporting technical information and considers the Mineral Resource Estimate suitable for disclosure under SEC Regulation S-K 1300.

 

Definitions for resource categories used in this TRS are aligned with those defined by SEC in S-K 1300. Mineral Resources are classified into Measured, Indicated, and Inferred categories. No Measured Mineral Resources were declared for the Project.

 

The Mineral Resource after the removal of narrow low-grade areas that do not honour RPEE is presented in Table 14-9.

 

Mineral Resources are not Mineral Reserves and have not demonstrated economic viability. The reported Inferred Mineral Resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorised as Mineral Reserves as defined by S-K 1300. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to an Indicated or Measured Mineral Resource category.

 

Mineral Resources are reported at a cut-off value of USD75/t NSR and a minimum thickness of 1.5 metres. The assessment to satisfy the criteria of RPEE is a high-level estimate and is not an attempt to estimate Mineral Reserves.

 

A summary of the Mineral Resource estimate is presented in Table 14-10.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 143

 

Table 14-10
Selebi Main Mineral Resource Statement as of 28 September 2026

 

Class Deposit Tonnes
(millions)
Grade Contained metal Total contained CuEq
(Mlbs)
Cu
(%)
Ni
(%)
Co
(%)
Cu
(kt)
Ni
(kt)
Co
(kt)
Inferred Upper Domain 23.52 1.61 1.05 0.05 377.9 247.5 12.8 1,365
Lower Domain 8.95 1.31 0.77 0.04 117.4 69.4 3.4 407
Total 32.47 1.53 0.97 0.05 495.4 316.8 16.2 1,772

Notes:

1.Mineral Resources have been classified in accordance with SEC Regulation S-K 1300 and have been estimated under the supervision of the Qualified Person, MSA, a third-party firm comprising mining experts as defined by S-K 1300.
2.The 2026 MRE has been prepared in accordance with S-K 1300 definitions. Mineral Resources are exclusive of Mineral Reserves. There are no Mineral Reserves reported.
3.Mineral Resources, which are not Mineral Reserves, have no demonstrated economic viability. There is no guarantee that all or any part of the Mineral Resource will be converted into a Mineral Reserve. The estimate of Mineral Resources may be materially affected by geology, environment, permitting, legal title, taxation, socio-political, marketing, or other relevant issues.
4.It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to an Indicated or Measured Mineral Resource.
5.Mineral Resources reported on a 100% NEXM ownership basis.
6.All tabulated data have been rounded and as a result minor computational errors may occur.
7.kt = thousand tonnes, Mt = Million tonnes, Mlbs = million pounds
8.Mineral Resources are reported in situ (point of reference).
9.The Mineral Resource is report as in situ dry tonnes; figures are reported in metric tonnes.
10.Mineral Resources are reported at a cut-off value of USD75/t NSR (Net Smelter Return), defined as received value of final metal recovered minus off-site costs, and a minimum practical mining thickness of 1.5 metres. Blocks with values of less than USD75/t NSR were included as internal dilution, where enclosed by higher grade mineralization.
11.Mineral Resources are estimated using long-term prices of USD9.10/lb Ni, USD5.10/lb Cu, USD20.00/lb Co. The same metal prices were used in NSR calculations.
12.Mineral Resources are estimated using nickel, copper and cobalt recoveries of 55.6%, 96.1%, and 60.2%, respectively, derived from metallurgical studies which consider a two-concentrate scenario.
13.Payabilities and off-site treatment and refining costs were derived from an independent marketing study commissioned by NEXM.
14.Bulk density has been estimated in the block model based on an extensive data set of measurements taken from drillhole cores by BCL. The average density is 3.51 t/m3 for the Upper vein and 3.38 t/m3 for the Lower vein.
15.Mineral Resources are reported using NSR values which assume mining costs of USD47.60/tonne, concentrate processing costs of USD20.00/tonne and G&A of USD5.50/tonne.
16.Areas depleted or sterilized by mining were removed from the mineral resource as well as an interpreted dyke.
17.The copper equivalent (CuEq) value was calculated based on relative recovered value received for each metal excluding costs. Received value for each metal was calculated using the formula: in-situ grade*concentrator recovery*payability*metal price. The ratio between received copper value and total other metal value was then used to calculate CuEq. Formula is: CuEq =(Cu%*96.4+Ni%*87.0+Co%*132.7)/96.4.
18.The effective date of the Selebi Main Mineral Resource is 28 September 2026, this being the date the Selebi Main MRE was concluded and reported shortly thereafter. This is earlier than effective date of the Selebi North MRE, hence earlier than the effective date for this TRS.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 144

 

14.3.15Grade Tonnage Curves

 

The grade-tonnage curves for the Upper and Lower domains are presented in Figure 14-20 and Figure 14-21, respectively.

 

Figure 14-20
Grade-Tonnage Curve: Upper domain Inferred

Source: MSA, 2026

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 145

 

Figure 14-21
Grade-Tonnage Curve: Lower domain Inferred

Source: MSA, 2026

 

14.3.16Comparison with Previous Estimates

 

On behalf of Premium Nickel Resources Ltd. (now known as NEXM), a Mineral Resource estimate for Selebi Main was prepared by SLR using available drill hole data as of June 30, 2024.

 

The MRE was prepared using results from BCL historical drill holes completed and the PNRPL drilling data. Mineral Resource domain and block modelling work was completed using Seequent’s Leapfrog Geo and Edge software. The MRE targeted mineralization above an NSR threshold of USD70/t.

 

The Mineral Resource estimates as prepared by SLR are tabulated in Table 14-11. The information regarding the mineral resource estimate prepared by SLR (September 20, 2024) reported herein should be considered as historical in nature. NEXM is not treating the SLR September 20, 2024, mineral resource estimate as current.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 146

 

Table 14-11
Previous Selebi Main mineral resource estimate, SLR September 20, 2024

 

Classification Deposit Tonnes Grade Contained metal
(millions) Cu
(%)
Ni
(%)
Cu
(kt)
Ni
(kt)
Inferred Selebi Main 18.89 1.69 0.88 319.2 165.5
Total Inferred 18.89 1.69 0.88 319.2 165.5

Notes:

1. CIM (2014) definitions were followed for Mineral Resources.

2. Mineral Resources are estimated at a net smelter return (NSR) value of USD70/t.

3. Mineral Resources are estimated using a long-term prices of USD10.50/lb Ni and USD4.75/lb Cu, and a USD:BWP exchange rate of 1.00:13.23.

4. Mineral Resources are estimated using nickel and copper recoveries of 72.0% and 92.4%, respectively, derived from metallurgical studies, which consider a conceptual bulk concentrate scenario.

5. Bulk density has been estimated.

6. Mineral Resources are reported within conceptual underground reporting shapes considering a minimum thickness of 1.5 m.

7. There are no Mineral Reserves.

8. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

9. Totals may not add or multiply accurately due to rounding.

 

The MSA QP notes that considerable amounts of drilling work have been completed since the SLR (2024) estimates that has resulted in a remodelled and expanded Mineral Resource footprint. Furthermore, MSA has included cobalt in the updated estimate and has calculated NSR using updated assumptions.

 

Previous resource estimates for the Project were prepared under different assumptions, databases, drilling densities and economic parameters. Direct comparison between estimates may not be appropriate without consideration of these differences.

 

The current Mineral Resource Estimate reflects additional verification drilling, revised geological interpretations, updated estimation methodologies, revised economic assumptions and reporting in accordance with SEC Regulation S-K 1300.

 

14.3.17Mineral Resource Uncertainty Discussion

 

The principal sources of uncertainty affecting the Mineral Resource Estimate include geological interpretation, continuity of mineralization, grade interpolation, bulk density assumptions, metallurgical recovery assumptions, commodity price assumptions, geotechnical conditions, the ability of the mine to control dilution, and future mining selectivity. Additional infill drilling, production data and operating experience may result in future revisions to Mineral Resources.

 

The MSA QP notes that future economic assessment could result in a change in the NSR cut-off value applied, which would result in a change in the tonnage of the Mineral Resource. The MSA QP did not independently audit recovery, processing costs, or other assumptions for deriving the NSR cut-off value but does consider the inputs to be reasonable for the purposes of declaring a Mineral Resource.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 147

 

Portions of the deposit remain sparsely drilled, that should be investigated through more-closely spaced sample intervals, which would improve understanding of the grade distribution and continuity.

 

With the exception of these potential risks to Mineral Resources, the MSA QP is not aware of any other factors to which the mineral resource estimates could be materially affected, such as environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors.

 

Specific issues relating the Inferred Mineral Resource data and interpretation are discussed as follows:

 

●The Selebi Main Mineral Resource is informed by PNRPL drilling data of high confidence and BCL data of lesser confidence, due to it being historical in nature. The BCL surface drilling was carried out using processes similar to those used by PNRPL but prior to the application of modern QAQC on pre-2007 assays.

 

●At Selebi Main, a significant extension (the “Flexure Zone”) to the historically defined mineral resource area is entirely informed by PNRPL drilling data collected from 2025 to 2026. This accounts for approximately 40% of the Selebi Main Mineral Resource. Outside of the extension area, PNPRL drilling from 2022 to 2023 and 2026, combined with BCL surface drilling, informs most of the southern area accounting for approximately 25% of the total Mineral Resource area. Approximately 35% of the Mineral Resource is largely reliant on BCL surface and underground drilling data that has not been conclusively verified by PNRPL drilling. Portions informed by BCL data that have yet to be conclusively verified by infill and/or twin drilling lie on the downward extent of an area that has been defined by mining for approximately 2 km from surface in plunge extent and vertically to 1.1 km. Although the entire Selebi Main Mineral Resource has been classified as Inferred, the MSA QP considers that the portions largely informed by the historical BCL drilling data have a higher level of uncertainty than those informed by PNRPL data.

 

●One of the BCL surface drilling intercepts at Selebi Main is particularly thick and of high-grade (sdn119). This occurs within an area covered by both BCL and PNRPL drilling, with the PNRPL drilling confirming a thick high-grade trend, although the sdn119 intercept thickness remains anomalous. Three-dimensional modelling using the surrounding drillholes, restricted the impact of the intersection, although the risk to the Mineral Resource volume could be of significance (5% to 10%) but within the tolerance expected for Inferred Mineral Resources.

 

●An unresolved issue exists with regards to confirmation of ALS assays by a second laboratory (SGS). Both laboratories are reputable ISO17025 SANAS accredited commercial laboratories independent of PNPRL. The results suggest a potentially significant positive bias of the ALS data (31% for Ni, 10% for Cu and 15% for Co), which is particularly apparent for the higher nickel and cobalt grades. This conclusion is not backed by results of CRMs assayed at ALS, which demonstrate acceptable accuracy by assay results from six different CRM’s, sourced from two different manufacturers, that did not show consistent bias or of such magnitude. Further check assay work is recommended on a routine basis and retrospectively to check for any potential bias.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 148

 

●The general shape of Selebi Main is tabular comprising two parallel tabular bodies, the lowermost of which is less continuously developed. Additional mineralisation has been intersected, particularly in the “Flexure Zone” that indicates an additional layer may be sporadically developed. Correlation of the layers is not definitive at the drillhole spacing at Selebi Main and the grades and tonnages may be impacted positively or negatively by changes in interpretation with additional drilling.

 

●The Selebi main interpretation is simplistic due to the relatively widely spaced data. Historical mining at Selebi Main experienced short scale dip, strike, grade and thickness variability in some areas. While this does not impact significantly on the overall grade and tonnage of the Mineral Resource, the grade of the mined production from future mining operations that may be contemplated could be negatively affected by higher dilution in the more complex areas.

 

●The Inferred Mineral Resource is informed by widely spaced drillhole data. While the general shape of the deposit is well informed there is insufficient data to accurately estimate the grade and thickness of the mineralisation locally.

 

14.3.18MSA QP Opinion

 

The MSA Qualified Person is of the opinion that:

 

●the drilling, sampling, analytical and database information are adequate to support the Mineral Resource Estimate at an Inferred level of classification;

 

●the geological interpretation appropriately reflects the style and continuity of mineralization;

 

●the estimation methodology is suitable for the deposit type and available data;

 

●the Mineral Resource models presented in this report are representative of the informing data and that the data is of sufficient quality and quantity to support the Mineral Resource estimate to the classifications applied (Inferred);

 

●the classification appropriately reflects the confidence in the estimate; and the reported Mineral Resources have reasonable prospects for economic extraction;

 

●the resource estimation reported herein is an appropriate representation of the Ni, Cu and Co Mineral Resources found at Selebi Main;

 

●the Mineral Resource Estimate has been prepared in accordance with SEC Regulation S-K 1300; and

 

●the MSA QP is of the opinion that with consideration of the recommendations summarized in Section 1.0 and 26.0 of this TRS, any issues relating to all relevant technical and economic factors likely to influence the prospect of economic extraction can be resolved with further work.

 

14.4Selebi North

 

14.4.1Mineral Resource Estimation Database

 

The final validated Selebi North database was used as of 22 September 2026. The dataset comprises channel samples and surface and underground drillholes, which includes the SNUG drilling campaign recently completed by PNPRL. A summary of the complete Selebi North dataset provided is provided in Table 14-12.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 149

 

Table 14-12
Selebi North Data Summary
Data type Number of samples Total metres
BCL Channel 3,035 12,535
BCL Surface 151 87,311
BCL Underground 1,748 97,738
PNPRL Underground 177 73,220

 

14.4.2Data Validation

 

The data validation process included the following checks:

 

●Examining the sample assay, collar, down-hole survey and geology data to ensure that the data are complete for all the drillholes

 

●Examining the de-surveyed data in three dimensions to check for spatial errors

 

●Examination of the assay and density data to ascertain whether they are within expected ranges

 

●Checks for “FROM-TO” errors, to ensure that the sample data do not overlap one another or that there are no unexplained gaps in the sampling.

 

14.4.2.1Spatial location of historical data

 

BCL Underground Drilling and Sampling

 

BCL drilled holes and completed diamond saw-cut channel samples to locally evaluate the mineralization during mining operations. Drilling consisted of flat drillholes from the footwall development and into the sidewalls of the sublevel drill-drives. Drill-drive development was generally along the contact between the mineralized amphibolite unit and the hangingwall grey gneiss. The drill-drive drilling was largely to evaluate mineralization in the footwall of the drill-drives. Combined with the diamond-sawn channel, a complete intersection was obtained. Inclusion of both the channel sample and drillhole is important, else the data can be biased towards either the high-grade zone towards the hangingwall or the lower grade zone towards the footwall. MSA examined this BCL data relative to the position of the drill-drives and surrounding data. Where holes were collared within development, rather than at the sidewall, or were collared outside of a surveyed excavation, they were discarded. The majority of the data were accepted. The BCL underground evaluation data informs an area of 50 m vertically from the stoped-out area to the base of mining development, which accounts for less than 10% of the Mineral Resource.

 

Twelve drillholes were drilled by BCL steeply downwards from an underground exploration drilling drive; these being sn29001, sn29004 to sn29009 and sn29050 to sn29054. The holes were for the purposes of exploring below current development and were surveyed down-the hole. Assaying was for copper, nickel and cobalt. Two of the holes, sn29050 and sd29051 drilled over the South-Limb / N2 fold closure and the other 10 holes intersected South Limb or N2 Limb mineralization at positions consistent with those intersected by the PNRPL holes. These holes were accepted for use in the MRE. They cover a relatively small area up to 200 m below the stoped-out portion of the South Limb in an area that is also drilled by PNRPL holes.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 150

 

BCL Surface Holes

 

A number of BCL surface hole intercepts were located close to the mine development and PNRPL drillholes. In general, significant discrepancies of several metres between the position of the BCL surface hole intercepts and those of the recent drilling and underground data was observed.

 

Inclusion of the BCL surface drillhole data would have resulted in unnatural irregularities to the shape of the mineralized structure and therefore all the BCL surface drillholes were discarded, i.e., were not used to guide either the position or grade of the mineralization. Surface drilling at Selebi North is sparse and the complex structure is sensitive to spatially incorrect data, even on a relatively small scale of several metres. Ten surface holes were discarded that occurred within the Mineral Resource area (four in the N3 area and six in the South Limb), which is insignificant compared to the large numbers of PNRPL underground exploration holes.

 

14.4.2.2Estimation dataset

 

Data above an elevation of 169 m RL was excluded from the database, as drillholes above this elevation fall well within the mining depleted area of the deposit. BCL surface drillholes were excluded from the estimates as well as thirty-two underground BCL drillholes, due to misalignment between their position and the modelled mineralization or due to unusually long sample intervals. Twenty-nine PNRPL drillholes, some which did not contain assay data while others representing failed holes, were also excluded. Hole SNUG-23-017 was excluded because it was drilled down the plane of mineralization and sampling was therefore inappropriate.

 

The final dataset used to estimate the Mineral Resource comprises 714 BCL channels, 386 BCL underground diamond drillholes and 147 SNUG series holes drilled from underground by PNRPL. A plan and oblique view of the Selebi North data used in the MRE is shown in Figure 14-22 and Figure 14-23 respectively.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 151

 

Figure 14-22
Plan view of Selebi North drilling and channel data
 

Note: Coordinates as local mine grid

 

Figure 14-23
Oblique view of Selebi North drilling and channel data looking northeast
 

Note: Coordinates as local mine grid

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 152

 

Nickel and copper assays are available throughout the underground datasets while cobalt, silver, gold, palladium and platinum assays are confined to the PNRPL drilling. Despite the lack of cobalt assays in the BCL data, the strong linear relationship between cobalt and nickel grade, allows for confident regression and therefore cobalt was included in the MRE. Summaries of the raw assay data and the total density data available are presented in Table 14-13 and Table 14-14, respectively.

 

Table 14-13
Summary of assay data
Data Type Number of Ni assays Metres assayed for Ni Number of Cu assays Metres assayed for Cu Number of Co assays Metres assayed for Co
BCL channel 6,109 2,814 6,109 2,814 0 0
BCL underground drillhole 18,839 21,226 18,839 21,226 0 0
PNRPL underground drillhole 9,794 9,523 9,794 9,523 9,794 9,523

 

Table 14-14
Summary of density data
Data Type Number of samples Total metres
BCL channel 6,109 2,814
BCL underground drillhole 10,347 13,719
PNRPL underground drillhole 9,794 9,255

 

The density dataset included both measured and calculated values. All previously assigned density values were excluded from the data. In addition, 8,921 records containing zero density values were excluded, together with anomalous values (exceeding a density of 5.0 g/cm3).

 

14.4.2.3Regression Analysis

 

There is a strong linear relationship between nickel and cobalt grade, and nickel grade and density (Figure 14-24). The correlation coefficient (R value) between nickel grade and density is 0.91 and between nickel grade and cobalt grade is 0.90, both indicating a strong positive correlation. This allowed for regression formulas to calculate values for missing Co grade and density to ensure that relationships between highly correlated attributes are locally retained:

 

Density = 0.544*Ni + 3.053

 

Co % = 0.049*Ni + 0.003

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 153

 

Figure 14-24
Scatter plots showing regression analysis for Selebi North
   

Source: MSA, 2026

 

14.4.3Geological Modelling

 

The Selebi North mineralization model was completed using Leapfrog Geo software (version 2026.1) using Leapfrog’s intrusion tool. The mineralization model was initially based on a nickel threshold value of 0.20% Ni. The grade data was coded interactively into a mineralized zone and unmineralized hangingwall and footwall zones. This was an iterative process, with the initial model incorporating some potentially sub-economic grade intercepts. The model was subsequently refined, using a guideline of 70 USD/t NSR threshold to remove zones with contiguous, low-grade intercepts originally included. The mineralization model was constrained to elevations below 169 m RL and included an area between 169 m RL and −45 m RL representing a partially mined-out zone which was later excluded from the Mineral Resource.

 

A north-looking and plan view of the mineralized zone is presented in Figure 14-25 and Figure 14-26.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 154

 

Figure 14-25
Selebi North mineralization model (view looking north)
 

Note: Coordinates as local mine grid

 

Figure 14-26
Selebi North mineralization model (plan view)
 

Note: Coordinates as local mine grid

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 155

 

14.4.4Statistical Analysis

 

14.4.4.1Statistics of the raw data

 

Statistics for the final MRE dataset are presented in Table 14-15.

 

Table 14-15
Drillhole sample grade and density statistics 
Assay Number of
Samples
Minimum Maximum Mean CV
Ni % 34,742 0.00 11.10 0.44 1.78
Cu % 34,742 0.00 21.00 0.43 2.55
Co % 9,794 0.00 0.27 0.02 1.60
SG 20,137 1.40 5.00 3.15 0.14

 

There is equal coverage of nickel and copper data over the Mineral Resource area, however there are fewer cobalt assays and density measurements available.

 

14.4.4.2Estimation Domains

 

The drillhole samples were selected within the mineralized zone, and descriptive statistics were calculated for nickel, copper, cobalt and density as shown in Table 14-16.

 

Table 14-16
Mineralized domain sample grade statistics 
Assay Number of
Samples
Minimum Maximum Mean CV
Ni % 12,337 0 11.1 0.97 0.96
Cu % 12,337 0 18.7 0.94 1.38
Co % 12,337 0.001 0.53 0.05 0.92
Density 12,333 2.35 9.09 3.58 0.16

 

The mean sample grades within the mineralized zone are 0.97% Ni, 0.94% Cu and 0.05% Co, with maximum values of 11.1% Ni, 18.7% Cu and 0.53% Co. Nickel and particularly copper display high variability with Coefficient of Variation (CV) values of 0.96 and 1.38 respectively, whereas density is less variable, with a mean of 3.58 and a CV of 0.16.

 

Histograms for nickel and copper are shown in Figure 14-27.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 156

 

Figure 14-27
Histogram of sample nickel and copper grade
   

Source: MSA, 2026

 

The nickel and copper grade distributions are both positively skewed and characterized by long high-grade tails. The nickel histogram also displays a strongly bimodal distribution, comprising a lower-grade population below 1% Ni and a higher-grade population largely between approximately 2% and 3% Ni. The different structural zones of the deposit have different geological characteristics and therefore samples were categorized into four domains according to their location within each limb of the mineralized zone (Figure 14-28). This subdivision also supported the modelling of directional semivariograms.

 

●Zone 1 N2

 

●Zone 2: N2-N3 synform

 

●Zone 3: N3

 

●Zone 4: South Limb

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 157

 

Figure 14-28
Selebi North mineralized samples sub-domains
 

Note: Coordinates as local mine grid

 

A comparison of the log-probability plots for the four domains indicates that Domains 1 and 2 (N2 and N2-N3 synform) exhibit broadly similar nickel grade distributions (Figure 14-29). Domain 4 (South Limb) reflects a higher-grade Ni population that is associated with lenses of massive sulphide occurring along the hangingwall contact, however this population cannot be reliably delineated as a separate domain. Furthermore, as Domain 4 is structurally continuous with Domain 1, separating the two domains was not considered geologically justified. In contrast, Domain 3 exhibits a distinctly different grade distribution, supporting its treatment as a separate estimation domain. Therefore, while the data were separated into four domains to facilitate directional semivariogram modelling, for grade estimation purposes, Domain 3 was treated separately as estimation zone 1 (ESTZON 1) whereas Domains 1, 2 and 4 were combined into a single estimation domain (ESTZON 2).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 158

 

Figure 14-29
Log probability plots for sub-domained mineralized samples
 

Source: MSA, 2026

 

Descriptive statistics for the estimation domains are presented in Table 14-17, which show that the mean grades and density for ESTZON 1 is higher, while variability is lower when compared to ESTZON 2.

 

Table 14-17
Mineralized sample grade statistics by estimation domain (ESTZON)
ESTZON Variable Number of
Samples
Minimum Maximum Mean CV
1 (N3) Ni % 1,531 0.001 4.97 1.79 0.69
Cu % 1,531 0.001 16.32 1.33 1.07
Co % 1,531 0.001 0.27 0.09 0.67
Density 1,531 2.55 5.69 3.99 0.17
2 (South Limb to N2) Ni % 10,806 0.00 11.10 0.88 1.01
Cu % 10,806 0.00 18.70 0.90 1.52
Co % 10,806 0.001 0.54 0.05 0.93
Density 10,802 2.35 9.09 3.53 0.15

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 159

 

14.4.4.3Sample Compositing

 

The sample-length distribution is bimodal (Figure 14-30), with 0.50 m and 1.00 m peaks corresponding to channel and drillhole samples, respectively. The samples were composited to 1 m for use in grade estimation, based on the dominant longest sample interval.

 

Figure 14-30
Histogram of interval length
 

Source: MSA, 2026

 

A statistical comparison between the composited and uncomposited data within the mineralization zones is summarized in Table 14-18. The compositing has had a minimal impact on the mean grades while reducing grade variability by between 11% and 23%.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 160

 

Table 14-18
Composited vs uncomposited statistics 

 

ESTZON Variable Uncomposited 1 m composites
Samples Min Max Mean CV Samples Min Max Mean CV
1 Ni % 1,531 0.001 4.97 1.79 0.69 881 0.001 3.83 1.78 0.60
Cu % 1,531 0.001 16.32 1.33 1.07 881 0.001 7.16 1.33 0.83
Co % 1,531 0.001 0.27 0.09 0.67 881 0.001 0.26 0.09 0.58
Density 1,531 2.55 5.69 3.99 0.17 881 2.55 5.14 3.99 0.15
2 Ni % 10,806 0 11.10 0.88 1.01 8,052 0 8.33 0.88 0.89
Cu % 10,806 0 18.70 0.90 1.52 8,052 0 14.70 0.90 1.25
Co % 10,806 0.001 0.54 0.05 0.93 8,052 0.001 0.40 0.05 0.83
Density 10,802 2.35 9.09 3.53 0.15 8,052 2.44 7.19 3.53 0.13
                         

14.4.4.4Evaluation of Outliers (Grade Capping)

 

An evaluation of grade and density outliers was undertaken for each estimation domain. Grade capping was applied primarily to ESTZON 2, while in ESTZON 1 capping was limited to cobalt grades. The impact of capping was minimal, with changes in the mean grades of less than 1% and reductions in CV ranging from 0.3% to 2.8%.

 

A summary of the grade capping applied is presented in Table 14-19.

 

Table 14-19
Global top-cap statistics 

 

ESTZON Variable Mean CV Cap Value Number of Capped Samples Mean CV

Percentage Difference

(Mean)

Percentage Difference

(CV)

1 Co % 0.09 0.58 0.195 1 0.09 0.58 -0.1% -0.3%
2 Ni % 0.88 0.89 3.57 10 0.88 0.88 0.1% -1.2%
Cu % 0.90 1.25 7.77 19 0.89 1.22 -0.4% -2.8%
Co % 0.05 0.83 0.16 14 0.05 0.81 0.0% -1.3%
Density 3.53 0.13 4.83 11 3.53 0.13 0.0% -0.6%

 

14.4.5Core Recovery

 

The fresh igneous rock at Selebi North is competent and the MSA QP observed that the core loss was minimal.

 

14.4.6Moisture

 

Grade and tonnage were estimated on a dry basis.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 161

 

14.4.7Variography

 

Experimental semivariograms were calculated using the normal score transformed composite nickel and copper grade data for each estimation domain. Semivariogram models were fitted to the experimental data with the models aligned using the rotation angles shown in Table 14-20. The same semivariogram model was applied to cobalt and density due to the strong linear relationship between them.

 

Table 14-20
Semivariogram rotation angles – Selebi North
ESTZON Variable Rotation Angle Rotation Axis
1 Ni % 54 108 -48 3 1 3
Cu % 62 102 -42 3 1 3
2 Ni % 60 96 -45 3 1 3
Cu % 60 96 -45 3 1 3

 

Semivariogram models for ESTZON 1 are well structured, with the nugget effect accounting for 29% and 35% of the total variance for nickel and copper grades respectively. In contrast, for ESTZON 2, the nugget effect accounts for 14% of the total variance for both nickel and copper grades and the short-range continuity is dominant, indicating high variability over short distances (~20 m) Semivariogram models for nickel are shown in Figure 14-31 for ESTZON 1 and in Figure 14-32 for ESTZON 2. A summary of the semivariogram parameters is presented in Table 14-21.

 

Figure 14-31
Ni grade semivariogram models for ESTZON 1

Source: MSA, 2026

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 162

 

Figure 14-32
Ni grade semivariogram models for ESTZON 2

Source: MSA, 2026

 

Table 14-21
Semivariogram parameters

 

Variable Nugget Effect Sill 1

Range of the First Structure

(m)

Sill 2

Range of the Second Structure

(m)

1 2 3 1 2 3
ESTZON 1
Ni % 0.29 0.24 45 45 2 0.47 160 70 3
Cu % 0.35 0.34 45 30 3 0.31 277 70 5
ESTZON 2
Ni % 0.14 0.69 15 9 5 0.17 130 40 10
Cu % 0.14 0.70 20 7 5 0.16 145 30 6

 

14.4.8Block Model and Grade Estimation

 

14.4.8.1Block Model Parameters

 

A block model was generated covering the extents of the deposit using a parent cell size of 5 mX by 5mY by 5mZ. Sub-celling was applied to optimally honour the wireframe volumes, resulting in a minimum sub-cell size of 0.5 mX by 0.5 mY by 0.5 mZ. The block model is not rotated.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 163

 

The Selebi North block model parameters are summarized in Table 14-22.

 

Table 14-22
Selebi North block model parameters 

 

Model Origins Parent Cell Size (m) Number of Cells
X Y Z X Y Z X Y Z
34,500 83,700 -800 5 5 5 260 340 200

 

14.4.8.2Grade Estimation

 

Nickel, copper and cobalt grades and density were estimated into the block model using ordinary kriging (OK) and a three-pass search strategy.

 

The search volume was aligned with the semivariogram orientation, and dynamic anisotropy was applied to accommodate variations in the strike and dip of the mineralization. For the first pass grade estimates, search distances along the major and semi-major axes were extended beyond the range of the first semivariogram structure to provide sufficient numbers of samples. The minor-axis search distance was set to 10 m, exceeding the semivariogram range in that direction. This allowed for a larger ellipse for sample selection, however the number of samples in the minor direction was then limited to a maximum number of two samples per drillhole (MaxKey) for ESTZON 1 and three for ESTZON 2.

 

First-pass estimates required a minimum of 6 and a maximum of 10 samples for ESTZON 1, and a minimum of 8 and a maximum of 14 samples for ESTZON 2. For the second pass, the search volume was expanded by a factor of 1.5, with the minimum and maximum sample requirements unchanged. An expansion factor of 8 was used in the third pass, the minimum sample requirement was reduced to 8 for both estimation domains, with a maximum of 10 samples for ESTZON 1 and 12 samples for ESTZON 2. Cobalt and density estimates used the same parameters as those for the nickel grade estimates.

 

A summary of the search volume and sample selection parameters is presented in Table 14-23 and Table 14-24.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 164

 

Table 14-23
Selebi North search volume orientation and distances 

 

Attribute Search Angles Search Axis Search Volume
ESTZON 1
Ni % 54 108 -48 Z X Z 80 50 10
Cu % 62 102 -42 Z X Z 80 70 10
ESTZON 2
Ni % 60 96 -45 Z X Z 80 35 10
Cu % 60 96 -45 Z X Z 80 30 10

 

Table 14-24
Selebi North search volume sample selection parameters 

 

Attribute Pass 1 Pass 2 Pass 3

Max

Key

Min Max

Expansion

Factor

Min Max

Expansion

Factor

Min Max
ESTZON 1
Ni % 6 10 1.5 6 10 8 5 10 2
Cu % 6 10 1.5 6 10 8 5 10 2
ESTZON 2
Ni % 8 14 1.5 8 14 8 5 12 3
Cu % 8 14 1.5 8 14 8 5 12 3

 

An NSR value was calculated in the block model based on the estimated grades, as shown in Figure 14-33) utilizing the same parameters as for Selebi Main (Table 14-3).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 165

 

Figure 14-33
Selebi North block model coloured on NSR

Note: Coordinates as local mine grid

 

14.4.9Block Model Validation

 

The block model was validated by:

 

●Visually examining the input data against the estimated block model grades.

 

●Comparison of the global mean estimates against the mean of the composite sample grades.

 

●Swath plot validation in the X, Y and Z directions.

 

14.4.9.1Global Validation

 

A global validation of the block model was undertaken by comparing the mean of the estimated block grades against the mean of the declustered, capped drillhole composites using a declustering cell of 55 mX by 55 mY by 10 mZ.

 

The comparison in Table 14-25 Shows that the estimated grades compare closely to the input data, with all variables reporting percentage differences less than 10%. Overall, ESTZON 1 estimates tend to be lower than the input data, while ESTZON 2 estimates tend to be higher.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 166

 

Table 14-25
Global validation comparing declustered mean composite grades against block estimates

 

ESTZON Variable 1 m composite mean Block model mean

Percent

difference

1 Ni % 1.52 1.43 -6%
Cu % 1.14 1.12 -2%
Co % 0.08 0.07 -6%
Density 3.80 3.74 -2%
2 Ni % 0.92 0.97 6%
Cu % 0.94 0.98 4%
Co % 0.05 0.05 6%
Density 3.55 3.60 1%

 

14.4.10Swath Plots

 

Swath plots were used to assess local differences between the block model grade estimates and the input composite grades along three orthogonal directions. No significant deviations were observed between the estimated and composite grades for nickel, copper or cobalt. Selected nickel swath plots for ESTZON 1 and ESTZON 2 are presented in Figure 14-34 and Figure 14-35 respectively.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 167

 

Figure 14-34
Swath plot validation for Ni – ESTZON 1

 

 

 

 

Source: MSA, 2026 Note: Coordinates as local mine grid

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 168

 

Figure 14-35
Swath plot validation for Ni – ESTZON 2

 

 

 

Source: MSA, 2026 Note: Coordinates as local mine grid

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 169

 

14.4.11Visual Validation

 

A visual validation was undertaken by comparing the block estimates against the drillhole composites in both cross-section, plan view and three-dimensions to assess if the local grades are appropriately represented in the block model.

 

Plan view images of the Selebi North block model are shown in Figure 14-36 for ESTZON 2 and Figure 14-37 for ESTZON 2. Three-dimensional views of the block model are shown for nickel, copper and cobalt in Figure 14-38, Figure 14-39 and Figure 14-40 respectively.

 

Figure 14-36
Plan view of Selebi North block model (ESTZON 1) – Elevation 23 mRL
 

Note: Coordinates as local mine grid

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 170

 

Figure 14-37
Plan view of Selebi North block model (ESTZON 2) – Elevation 20 mRL

Note: Coordinates as local mine grid

 

Figure 14-38
Block model three-dimensional view – Ni %

Note: Coordinates as local mine grid

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 171

 

Figure 14-39
Block model three-dimensional view – Cu %
 

Note: Coordinates as local mine grid

 

Figure 14-40
Block model three-dimensional view – Co %
 

Note: Coordinates as local mine grid

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 172

 

14.4.12Mineral Resource Classification

 

The Selebi North MRE has been classified as Measured, Indicated or Inferred Mineral Resource in accordance with SEC Regulation S-K 1300. No Measured Mineral Resources were declared for the Project.

 

14.4.12.1Approach to Classification

 

Classification of the Selebi North Mineral Resource was based on the degree of geological uncertainty, grade continuity and variability, frequency of the drilling data and confidence in the data.

 

The main considerations in terms of the Mineral Resource classification are as follows:

 

●Confidence of the geological and mineralization model:

 

◌The confidence in the mineralization model (NSR) is good, it being informed by adequate drilling and constrained to a distinct geological unit.

 

◌Breaks in the continuity of the modelled grade-shell occur between the N3 and N2 limbs, which may be related to shearing / faulting.

 

◌The structural framework of the mineralization is well defined.

 

◌The mineralized zones are continuous, occurring in a folded unit that extends approximately 1 km along strike (unfolded), and from surface to approximately 2.7 km down plunge (approximately 1.7 km vertically), remaining open at depth.

 

●Database quality including presence and performance of QAQC:

 

◌The majority of the Mineral Resource is informed by PNRPL data from underground drilling from an irregular drilling grid. that is of demonstrated high quality.

 

◌The quality of the BCL assays is less certain.

 

◌The Mineral Resource is informed by close spaced (10 m) channel samples and short evaluation drillholes in near mined areas that were completed by BCL. Their positions are confirmed by their alignment with underground workings. Several BCL underground exploration holes intercept mineralization in the same area as the PNPRL drillholes and show mineralization consistent with that intercepted by PNPRL. The BCL data informs a small area of the Mineral Resource to approximately 50 m deeper than the mined out area.

 

◌No BCL surface drillholes were included.

 

●The grade model validation is acceptable.

 

14.4.12.2Summary of Mineral Resource Classification

 

Mineral Resource classification was as follows:

 

●The model was classified in the Indicated category where estimates were completed in the first two estimation passes which approximately corresponds to a drillhole spacing ranging from 40 m to 60 m.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 173

 

●The model was classified in the Inferred category where blocks were estimated in the third pass which corresponds to areas informed by drilling spaced up to 100 m apart.

 

●In most areas, the strike extents are defined by low grade intercepts below the 70 USD/t modelling threshold. Areas of high variability or extrapolated along strike past the general trend of the data were not considered part of the Mineral Resource. Therefore, strike extrapolation was generally limited to short distances.

 

●The Mineral Resource displays strong down plunge continuity and is open at depth. Extrapolation down plunge of drilled intercepts was limited to 50 m.

 

●Mineral Resource classification plots for both domains are presented in Figure 14-41 and Figure 14-42.

 

Figure 14-41
Three-dimensional view of the block model coloured on classification
 

Note: Coordinates as local mine grid

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 174

 

Figure 14-42
Three-dimensional view of the block model showing mined out and areas excluded from MRE – looking southwest
 

Note: Coordinates as local mine grid

 

14.4.13Assessment of Reasonable Prospects for Economic Extraction (RPEE)

 

The MSA QP considers that given the depth, thickness and dip of the Mineral Resource a likely primary method of mining will be underground sub-level open stoping. Current metallurgical testwork supports flotation to produce separate copper and nickel concentrates.

 

A cut-off NSR value of USD75/t was applied based on mining costs, concentration costs and general and administration costs (G&A) as shown in Table 14-9. In assessing “reasonable prospects for economic extraction” (RPEE), the Mineral Resource model was queried to ensure that at a minimum vein thickness of 1.5 m an NSR cut-off value of USD75/t was achieved. Constraining shapes were modelled encompassing areas that do not meet these criteria (Figure 14-42), while considering sub-level open stope panels of at least 10 m high, generally 20 m. Block model cells of less than USD75/t NSR occur within the mineralization model, however, they are included as dilution that must necessarily be included to extract the higher grade mineralization around them and are reported as part of the Mineral Resource.

 

The reader is advised that the assessment of economic potential that is incorporated in the Mineral Resource is a high-level assessment and is solely for the purpose of reporting Mineral Resources with reasonable prospects for economic extraction and does not represent an attempt to estimate Mineral Reserves.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 175

 

14.4.14Mineral Resource Statement

 

For the purposes of this Technical Report Summary (“TRS”), the Mineral Resources are prepared and reported in accordance with SEC Regulation S-K 1300. MSA is the QP, as defined by Subpart 1300 of Regulation S-K, responsible for the Mineral Resource disclosure presented herein. The MSA QP has reviewed the estimation methodology, classification criteria and supporting technical information and considers the Mineral Resource Estimate suitable for disclosure under SEC Regulation S-K 1300.

 

Definitions for resource categories used in this TRS are aligned with those defined by SEC in S-K 1300. Mineral Resources are classified into Measured, Indicated, and Inferred categories. No Measured Mineral Resources were declared for the Project.

 

The Mineral Resource, after the removal of narrow low-grade areas that do not honour RPEE, is presented in Table 14-26

 

Mineral Resources are not Mineral Reserves and have not demonstrated economic viability. The reported Inferred Mineral Resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorised as Mineral Reserves as defined by S-K 1300. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to an Indicated or Measured Mineral Resource category.

 

Mineral Resources are reported for areas that meet a cut-off value of USD75/t NSR and a minimum thickness of 1.5 metres. The assessment to satisfy the criteria of RPEE is a high-level estimate and is not an attempt to estimate Mineral Reserves.

 

A summary of the Mineral Resource estimate is presented in Table 14-26.

 

Table 14-26
Selebi North Mineral Resource Statement as of 16 October 2026

 

Classification Tonnes
(millions)
Grade Contained metal Total contained
CuEq
(Mlbs)
Cu
%
Ni
%
Co
%
Cu
kt
Ni
kt
Co
kt
Indicated 8.95 1.03 1.08 0.06 92.2 96.7 5.4 412
Inferred 9.48 1.21 1.13 0.06 114.7 107.0 5.5 483

Notes:

1.Mineral Resources have been classified in accordance with SEC Regulation S-K 1300 and have been estimated under the supervision of the Qualified Person, MSA, a third-party firm comprising mining experts as defined by S-K 1300.
2.The 2026 MRE has been prepared in accordance with S-K 1300 definitions. Mineral Resources are exclusive of Mineral Reserves. There are no Mineral Reserves reported.
3.Mineral Resources, which are not Mineral Reserves, have no demonstrated economic viability. There is no guarantee that that all or any part of the Mineral Resource will be converted into a Mineral Reserve. The estimate of Mineral Resources may be materially affected by geology, environment, permitting, legal title, taxation, socio-political, marketing, or other relevant issues.
4.It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to an Indicated or Measured Mineral Resource.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 176

 

5.The assessment is preliminary in nature; it includes Inferred Mineral Resources that are considered too speculative geologically to have modifying factors applied to them that would enable them to be categorised as Mineral Reserves, and there is no certainty that this economic assessment will be realised.
6.Mineral Resources reported on a 100% NEXM ownership basis.
7.All tabulated data have been rounded and as a result minor computational errors may occur.
8.kt = thousand tonnes, Mt = Million tonnes, Mlbs = million pounds.
9.Mineral Resources are reported in situ (point of reference).
10.The Mineral Resource is report as in situ dry tonnes; figures are reported in metric tonnes.
11.Mineral Resources are reported at a cut-off value of USD75/t NSR (Net Smelter Return), defined as received value of final metal recovered minus off-site costs, and a minimum practical mining thickness of 1.5 metres. Constraining volumes were modelled that removed areas that did not meet these criteria, where large enough to be selectively mined, otherwise included as internal dilution.
12.Mineral Resources are estimated using long-term prices of USD9.10/lb Ni, USD5.10/lb Cu, USD20.00/lb Co. The same metal prices were used in NSR calculations.
13.Mineral Resources are estimated using nickel, copper and cobalt recoveries of 55.6%, 96.1%, and 60.2%, respectively, derived from metallurgical studies which consider a two-concentrate scenario.
14.Payabilities and off-site treatment and refining costs were derived from an independent marketing study commissioned by NEXM.
15.Bulk density has been estimated in the block model based on an extensive data set of measurements taken from drillhole cores. The average density is 3.65 t/m3.
16.Mineral Resources are reported using NSR values which assume mining costs of USD47.60/tonne, concentrate processing costs of USD20.00/tonne and G&A of USD5.50/tonne.
17.Areas depleted or sterilized by mining were removed from the mineral resource.
18.The copper equivalent (CuEq) value was calculated based on relative recovered value received for each metal excluding costs. Received value for each metal was calculated using the formula: in-situ grade*concentrator recovery*payability*metal price. The ratio between received copper value and total other metal value was then used to calculate CuEq. Formula is: CuEq =(Cu%*96.4+Ni%*87.0+Co%*132.7)/96.4.
19.The effective date of the Mineral Resource estimate is 16 October 2026.

 

14.4.15Grade Tonnage Curves

 

Grade-tonnage curves for the Indicated and Inferred Mineral Resources are presented in Figure 14-43 and Figure 14-44).

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 177

 

Figure 14-43
Grade-tonnage curve – Indicated Mineral Resources

Source: MSA, 2026

 

Figure 14-44
Grade-tonnage curve – Inferred Mineral Resources

Source: MSA, 2026

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 178

 

14.4.16Comparison with Previous Estimates

 

On behalf of Premium Nickel Resources Ltd. (now known as NEXM), a Mineral Resource estimate for Selebi North was prepared by SLR using available drill hole data as of June 30, 2024.

 

The MRE was prepared using results from BCL historical drill holes completed and the PNRPL drilling data. Mineral Resource domain and block modelling work was completed using Seequent’s Leapfrog Geo and Edge software. The MRE targeted mineralization above an NSR threshold of USD70/t.

 

The Mineral Resource estimates as prepared by SLR are tabulated in Table 14-27. The information regarding the mineral resource estimate prepared by SLR (September 20, 2024) reported herein should be considered as historical in nature. NEXM is not treating the SLR September 20, 2024, mineral resource estimate as current.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 179

 

Table 14-27
Previous Selebi North mineral resource estimates, SLR September 20, 2024

 

Classification Deposit Tonnes Grade Contained metal
(millions) Cu
(%)
Ni
(%)
Cu
(kt)
Ni
(kt)
Indicated Selebi North 3.00 0.90 0.98 27.1 29.5
Total Indicated 3.00 0.90 0.98 27.1 29.5
Inferred Selebi North 5.83 0.90 1.07 52.5 62.4
  Total Inferred 5.83 0.90 1.07 52.5 62.4

Notes:

1. CIM (2014) definitions were followed for Mineral Resources.

2. Mineral Resources are estimated at a net smelter return (NSR) value of USD70/t.

3. Mineral Resources are estimated using a long-term prices of USD10.50/lb Ni and USD4.75/lb Cu, and a USDBWP exchange rate of 1.00:13.23.

4. Mineral Resources are estimated using nickel and copper recoveries of 72.0% and 92.4%, respectively, derived from metallurgical studies, which consider a conceptual bulk concentrate scenario.

5. Bulk density has been estimated.

6. Mineral Resources are reported within conceptual underground reporting shapes considering a minimum thickness of 1.5 m.

7. There are no Mineral Reserves.

8. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

9. Totals may not add or multiply accurately due to rounding.

 

The MSA QP notes that considerable amounts of drilling work have been completed since the SLR (2024) estimates that has resulted in a remodelled and expanded Mineral Resource footprint. Furthermore, MSA has included cobalt in the updated estimate and has calculated NSR using updated assumptions.

 

 

 

14.4.17Mineral Resource Uncertainty Discussion

 

The principal sources of uncertainty affecting the Mineral Resource Estimate include geological interpretation, continuity of mineralization, grade interpolation, bulk density assumptions, metallurgical recovery assumptions, commodity price assumptions, geotechnical conditions, the ability of the mine to control dilution, and future mining selectivity. Additional infill drilling, production data and operating experience may result in future revisions to Mineral Resources.

 

The MSA QP notes that future economic assessment could result in a change in the NSR cut-off value applied, which would result in a change in the tonnage of the Mineral Resource. The MSA QP did not independently audit recovery, processing costs, or other assumptions for deriving the NSR cut-off value but does consider the inputs to be reasonable for the purposes of declaring a Mineral Resource.

 

Portions of the deposit remain sparsely drilled, that should be investigated through more-closely spaced sample intervals, which would improve understanding of the grade distribution and continuity.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 180

 

With the exception of these potential risks to Mineral Resources, the MSA QP is not aware of any other factors to which the mineral resource estimates could be materially affected, such as environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors.

 

Specific issues relating the Inferred Mineral Resource data and interpretation are discussed as follows:

 

●The Inferred Mineral Resource is informed by widely spaced drillhole data. While the general shape of the deposit is well informed there is insufficient data to assign sufficient confidence to the grade and thickness of the mineralisation, particularly in the deeper areas where interaction angles between the drillhole and interpreted dip of the mineralization is not ideal.

 

●Mineralisation shapes are complex at Selebi North, however the general shape of the deposit is predictable, and mining has exposed the deposit from surface down plunge for approximately 1.4 km to a depth of approximately 900 m below surface. Underground drilling by PNRPL has defined the Mineral Resource for approximately 1.3 km down plunge and vertically by approximately 750 m, with a change in the deposit structure indicated by the drilling. Structural complexity at Selebi North may result in portions of the deposit being more challenging to mine than others and the grade of the mined production from future mining operations that may be contemplated could be negatively affected by higher dilution in the more complex areas.

 

●The Inferred Mineral Resource is informed by widely spaced drillhole data. While the general shape of the deposit is well informed there is insufficient data to accurately estimate the grade and thickness of the mineralisation locally. In the deeper areas of Selebi North intersection angles between the drillhole and interpreted dip of the mineralization is not ideal and local inaccuracies in thickness estimates may result.

 

Indicated Mineral Resource are of higher confidence than Indicated Mineral Resources and allow for the application of “modifying factors” should a Mineral Reserve be contemplated in future.

 

14.4.18MSA QP Opinion

 

The MSA Qualified Person is of the opinion that:

 

●the drilling, sampling, analytical and database information are adequate to support the Mineral Resource Estimate;

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 181

 

●the geological interpretation appropriately reflects the style and continuity of mineralization;

 

●the estimation methodology is suitable for the deposit type and available data;

 

●the Mineral Resource models presented in this report are representative of the informing data and that the data is of sufficient quality and quantity to support the Mineral Resource estimate to the classifications applied;

 

●the classification appropriately reflects the confidence in the estimate; and the reported Mineral Resources have reasonable prospects for economic extraction;

 

●the resource estimation reported herein is an appropriate representation of the Ni, Cu and Co Mineral Resources found at Selebi North;

 

●the Mineral Resource Estimate has been prepared in accordance with SEC Regulation S-K 1300; and

 

●the MSA QP is of the opinion that with consideration of the recommendations summarized in Section 1.0 and 26.0 of this TRS, any issues relating to all relevant technical and economic factors likely to influence the prospect of economic extraction can be resolved with further work.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 182

 

15.Mineral Reserve Estimates

 

This section is not applicable. The Project is at the MRE stage with no Preliminary Economic Assessment (PEA) or Pre-Feasibility Study (PFS) completed.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 183

 

16.Mining Methods

 

The Project is at the MRE stage with no Preliminary Economic Assessment (PEA) or Pre-Feasibility Study (PFS) completed. Refer to Sections14.3.13 and 14.4.14.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 184

 

17.Recovery Methods

 

The Project is at the MRE stage with no Preliminary Economic Assessment (PEA) or Pre-Feasibility Study (PFS) completed. Recovery methods are discussed under Section 13 Mineral Processing and Metallurgical Testing.

  

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 185

 

18.Project Infrastructure

 

The Project is at the MRE stage with no Preliminary Economic Assessment (PEA) or Pre-Feasibility Study (PFS) completed. Refer to Section 5.3.2 Infrastructure, Power, Water and Supply.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 186

 

19.Market Studies and Contracts

 

The Project is at the MRE stage with no Preliminary Economic Assessment (PEA) or Pre-Feasibility Study (PFS) completed. A marketing study commissioned by NEXM (Aird, 2025) was used to inform the assessment of RPEE. Refer to Section 14.3.3.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 187

 

20.Environmental Studies, Permitting and Social or Community Impact

 

Refer to Sections 4.3 and 5.3.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 188

 

21.Capital and Operating Costs

 

The Project is at the MRE stage with no Preliminary Economic Assessment (PEA) or Pre-Feasibility Study (PFS) completed. Refer to Sections 14.3.13 and 14.4.13.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 189

 

22.Economic Analysis

 

This section is not applicable. The Project is at the MRE stage with no Preliminary Economic Assessment (PEA) or Pre-Feasibility Study (PFS) completed.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 190

 

23.Adjacent Properties

 

Mining licence 2022/1L was granted to PNRPL on January 31, 2022, and includes the Selebi Mines deposits. The original licence (4/72) had been granted to BCL on March 7, 1972, and included both the Selebi and Phikwe project areas as well as associated infrastructure, including the concentrator and smelter plants at Phikwe used to process ore from both Selebi and Phikwe. The new mining licence expires on January 30, 2032, however, BCL operated the combined Selebi Phikwe Project from 1970 until its closure in 2016. Ore was mined from four distinct underground production areas namely the Phikwe (1 Shaft, Phikwe Central, and Phikwe South), and Southeast Extension mines located on the Phikwe project area, and the Selebi North and Selebi mines located on the Selebi Mines project area (Figure 23-1).

 

The QP has not relied on information from adjacent properties in the writing of this Technical Report and has not verified the information relevant to the Phikwe mines. The information presented for the Phikwe mines is not necessarily indicative of the mineralization on the property that is the subject of this TRS.

 

Figure 23-1
Location of Phikwe historical operations relative to Selebi Mines
 

Source: NEXM, 2026

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 191

 

24.Other Relevant Data and INformation

 

No additional information or explanation is necessary to make this TRS understandable and not misleading.

 

The QPs are not aware of other data to disclose.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 192

 

25.Interpretation and Conclusions

 

This section contains forward-looking information related to Mineral Resources and the mineral processing for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that were set forth in this sub-section including geological and grade interpretations and controls and assumptions and forecasts associated with establishing the prospects for economic extraction; grade continuity analysis and assumptions; Mineral Resource model tonnes and grade; prevailing economic conditions, commodity markets and prices; environmental, social or government approvals.

 

The Project is an Exploration Stage Property 100% owned by NEXM. The Project includes the historical Selebi and Selebi North mines.

 

25.1Geology and Mineral Resources

 

The geology of the Selebi Mines deposits is well understood in the near mine areas through decades of mining and brownfields exploration. The drilling completed by PNRPL since the 2024 MRE (SLR, 2024) has been successful in confirming down dip extensions and has identified changes to the historical trend, including the “Flexure Zone” area at Selebi Main and the more southerly trend to the Selebi North South Limb-N2 fold axis. Significant increases to the Inferred Mineral Resource at both Selebi Main and Selebi North have resulted from the additional drilling and, at Selebi North infill drilling has allowed for a considerable increase in Indicated Mineral resources since the 2024 MRE.

 

The Mineral Resource Estimates for the Selebi Mines are presented in Table 1-1.

 

Table 25-1
Selebi Mines Mineral Resource Estimates, October 16, 2026

 

Classification Deposit Tonnes Grade Contained metal
(millions) Cu
(%)
Ni
(%)
Co
(%)
Cu
(kt)
Ni
(kt)
Co
(kt)
Indicated Selebi North 8.95 1.03 1.08 0.06 92.2 96.7 5.4
Total Indicated 8.95 1.03 1.08 0.06 92.2 96.7 5.4
Inferred Selebi Main 32.47 1.53 0.97 0.05 495.4 316.8 16.2
Selebi North 9.48 1.21 1.13 0.06 114.7 107.0 5.5
Total Inferred 41.95 1.45 1.01 0.05 610.1 423.8 21.7

Notes:

1.Mineral Resources have been classified in accordance with SEC Regulation S-K 1300 and have been estimated under the supervision of the Qualified Person, MSA, a third-party firm comprising mining experts as defined by S-K 1300.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 193

 

2.The 2026 MRE has been prepared in accordance with S-K 1300 definitions. Mineral Resources are exclusive of Mineral Reserves. There are no Mineral Reserves reported.
3.The 2026 MRE has an effective date of September 28, 2026, for Selebi Main and October 16, 2026, for Selebi North.
4.Mineral Resources, which are not Mineral Reserves, have no demonstrated economic viability. There is no guarantee that that all or any part of the Mineral Resource will be converted into a Mineral Reserve. The estimate of Mineral Resources may be materially affected by geology, environment, permitting, legal title, taxation, socio-political, marketing, or other relevant issues.
5.It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to an Indicated or Measured Mineral Resource.
6.The assessment is preliminary in nature; it includes Inferred Mineral Resources that are considered too speculative geologically to have modifying factors applied to them that would enable them to be categorised as Mineral Reserves, and there is no certainty that this economic assessment will be realised.
7.Mineral Resources reported on a 100% NEXM ownership basis.
8.All tabulated data have been rounded and as a result minor computational errors may occur.
9.kt = thousand tonnes, Mlbs = Million pounds, koz = thousand ounces.
10.Mineral Resources are reported in situ (point of reference).
11.The Mineral Resource is report as in situ dry tonnes; figures are reported in metric tonnes.
12.Mineral Resources are reported at a cut-off value of USD75/t NSR (Net Smelter Return), defined as received value of final metal recovered minus off-site costs, and a minimum thickness of 1.5 metres. Block model estimates of less than USD75/t NSR are included within the Mineral Resource in areas where it was considered not feasible to mine selectively around them. Areas of the block model were excluded in low grade areas where there is no potential to define a mineable block above USD75/t NSR.
13.Mineral Resources are estimated using long-term prices of USD9.10/lb Ni, USD5.10/lb Cu, USD20.00/lb Co. The same metal prices were used in NSR calculations.
14.Mineral Resources are estimated using nickel, copper and cobalt recoveries of 55.6%, 96.1%, and 60.2%, respectively, derived from metallurgical studies which consider a two-concentrate scenario.
15.Payabilities and off-site treatment and refining costs were derived from an independent marketing study commissioned by NexMetals.
16.Bulk density has been estimated in the block model based on an extensive data set of measurements taken from drillhole cores. The average density for the mineralized zone is 3.47 t/m3 for Selebi Main and 3.65 t/m3 for Selebi North
17.Mineral Resources are reported using NSR values which assume mining costs of USD47.60/tonne, concentrate processing costs of USD20.00/tonne and G&A of USD5.50/tonne.
18.Areas depleted or sterilized by mining were removed from the Mineral Resource.
19.There are no Mineral Reserves.

 

25.1.1Mineral Resource Risk Factors

 

The MSA QP is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource Estimates or the potential development of the Mineral Resources.

 

There are no drilling, sampling, or recovery factors that could materially impact the accuracy and reliability of the results globally, however, should local estimates be required for detailed mine planning more extensive spatial validation of the historical data is required.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 194

 

The lack of geotechnical data is a limitation in this assessment as it does not allow for quantitative or semi-quantitative assessment of dilution, support and extraction parameters, which could impact detrimentally on reasonable prospects for economic extraction.

 

The Mineral Resource is adequately drilled for the level of classification applied.

 

Specific issues relating the Mineral Resource data and interpretation are discussed as follows:

 

●The Selebi Main Mineral Resource is informed by PNRPL drilling data of high confidence and BCL data of lesser confidence, due to it being historical in nature. The BCL surface drilling was carried out using processes similar to those used by PNRPL but prior to the application of modern QAQC on pre-2007 assays.

 

●At Selebi Main, a significant extension (the “Flexure Zone”) to the historically defined mineral resource area is entirely informed by PNRPL drilling data collected from 2025 to 2026. This accounts for approximately 40% of the Selebi Main Mineral Resource. Outside of the extension area, PNPRL drilling from 2022 to 2023 and 2026, combined with BCL surface drilling, informs most of the southern area accounting for approximately 25% of the total Mineral Resource area. Approximately 35% of the Mineral Resource is largely reliant on BCL surface and underground drilling data that has not been conclusively verified by PNRPL drilling. Portions informed by BCL data that have yet to be conclusively verified by infill and/or twin drilling lie on the downward extent of an area that has been defined by mining for approximately 2 km from surface in plunge extent and vertically to 1.1 km. Although the entire Selebi Main Mineral Resource has been classified as Inferred, the MSA QP considers that the portions largely informed by the historical BCL drilling data have a higher level of uncertainty than those informed by PNRPL data.

 

●One of the BCL surface drilling intercepts at Selebi Main is particularly thick and of high-grade (sdn119). This occurs within an area covered by both BCL and PNRPL drilling, with the PNRPL drilling confirming a thick high-grade trend, although the sdn119 intercept thickness remains anomalous. Three-dimensional modelling using the surrounding drillholes, restricted the impact of the intersection, although the risk to the Mineral Resource volume could be of significance (5% to 10%) but within the tolerance expected for Inferred Mineral Resources.

 

●An unresolved issue exists with regards to confirmation of ALS assays by a second laboratory (SGS). Both laboratories are reputable ISO17025 SANAS accredited commercial laboratories independent of PNPRL. The results suggest a potentially significant positive bias of the ALS data (31% for Ni, 10% for Cu and 15% for Co), which is particularly apparent for the higher nickel and cobalt grades. This conclusion is not backed by results of CRMs assayed at ALS, which demonstrate acceptable accuracy by assay results from six different CRM’s, sourced from two different manufacturers, that did not show consistent bias or of such magnitude. Further check assay work is recommended on a routine basis and retrospectively to check for any potential bias.

 

●The top 50 m of the remaining Mineral Resource at Selebi North, from the stoped-out area to the base of mining development, is informed by closely spaced historical BCL underground drilling and channel sampling data. Although the historical data have been extensively validated and display mineralisation consistent with historical mining trends, historical data is considered to carry more risk than recent data. This area accounts less than 10% of the Mineral Resource. By far the largest portion of the Selebi North Mineral Resource is informed by data obtained by diamond drilling by PNRPL. Historical BCL surface drillhole intercepts are insignificant in amount and were not used due to spatial inaccuracy relative to the more recent data and surveyed mine workings.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 195

 

●The general shape of Selebi Main is tabular comprising two parallel tabular bodies, the lowermost of which is less continuously developed. Additional mineralisation has been intersected, particularly in the “Flexure Zone” that indicates an additional layer may be sporadically developed. Correlation of the layers is not definitive at the drillhole spacing at Selebi Main and the grades and tonnages may be impacted positively or negatively by changes in interpretation with additional drilling.

 

●The Selebi main interpretation is simplistic due to the relatively widely spaced data. Historical mining at Selebi Main experienced short scale dip, strike, grade and thickness variability in some areas. While this does not impact significantly on the overall grade and tonnage of the Mineral Resource, the grade of the mined production from future mining operations that may be contemplated could be negatively affected by higher dilution in the more complex areas.

 

●Mineralisation shapes are complex at Selebi North, however the general shape of the deposit is predictable, and mining has exposed the deposit from surface down plunge for approximately 1.4 km to a depth of approximately 900 m below surface. Underground drilling by PNRPL has defined the Mineral Resource for approximately 1.3 km down plunge and vertically by approximately 750 m, with a change in the deposit structure indicated by the drilling. Structural complexity at Selebi North may result in portions of the deposit being more challenging to mine than others and the grade of the mined production from future mining operations that may be contemplated could be negatively affected by higher dilution in the more complex areas.

 

●The Inferred Mineral Resource is informed by widely spaced drillhole data. While the general shape of the deposit is well informed there is insufficient data to accurately estimate the grade and thickness of the mineralisation locally. In the deeper areas of Selebi North intersection angles between the drillhole and interpreted dip of the mineralization is not ideal and local inaccuracies in thickness estimates may result.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 196

 

25.2Mineral Processing

 

Recent testwork utilized fresh samples obtained from underground blasting at multiple locations, including Selebi North (South Limb, N2, and N3) and Selebi Main. These samples were selected and prepared by Flowsheets and were used in both the XPS/Flowsheets and BCR testwork programs. The Fuse QP considers these samples to be representative of the early years of mine development and appropriate for initial flowsheet development. However, it is recommended that future work incorporate systematic drill core sampling that is spatially representative of the deposits. In particular, Selebi Main and potential expansion areas should be comprehensively sampled to assess potential mineralogical variability with depth and lateral extent.

 

Preliminary flotation results indicate that copper–nickel separation is achievable. However, more representative sampling and testwork are needed to confirm that target concentrate grades can be achieved consistently across all deposit areas and that nickel misplacement to the copper concentrate stays within acceptable limits. The primary grinding conditions that support effective separation also need to be better understood, to ensure the same performance can be reproduced at plant scale.

 

Furthermore, pre-concentration techniques have not been applied to Selebi materials in flotation testing to date. Should pre-concentration be advanced, further metallurgical testwork on upgraded material will be required to evaluate its impact on recovery and overall process performance.

  

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 197

 

26.Recommendations

 

The QPs recommend that the project advances to a preliminary economic assessment (PEA).

 

Drilling is in progress at Selebi Main to better characterize the “Flexure Zone”. This comprises 14,000m in 9 holes that will be completed during the period of the PEA.

 

Contingent on the outcome of the PEA, an infill drilling program is required to increase the confidence of the Mineral Resource to allow for more advanced studies to take place. This has not been planned for at this stage.

 

Metallurgical testwork was completed on samples from underground workings that are spatially representative of early mine development. The results support the flotation recoveries assumed in this study. Further testwork is recommended to support the PEA:

 

●Investigate grinding conditions to better understand nickel misplacement to the copper concentrate.

 

●Complete variability testing to confirm metallurgical performance across the deposits.

 

26.1.1Forward Work Program

 

The proposed forward work program comprises a PEA supported by additional metallurgical testwork. In parallel, exploration on the property is proposed to take place.

 

The forward work program is presented in Table 26-1.

 

Table 26-1
Forward work program – proposed budget

 

Item Cost
(CAD 000)
Cost
(USD 000)

Geology and drilling

● Ongoing surface drilling (14,000 m in 9 holes)

● Geological support, gyro surveys, assays

● BHEM surveys

3,000 2,130

Metallurgical testing 

● Remaining Metallurgical Testwork to support the PEA

100 71
PEA including Engineering and trade-off studies 925 657

General site and administration costs 

● Maintain mine infrastructure, power, water, equipment repair and maintenance

2,600 1,846
Subtotal  6,625 4,704
Contingency (5%)  331 235
Total 6,956 4,939

Note: Exchange rate as of 16 October 2026 = USD 0.71 to CAD 1.00

 

The QPs support progressing to a PEA and further exploration work and consider that the approximate costs outlined in the proposed budget (Table 26-1) are justified for the current stage of the Project.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 198

 

27.References

 

Aird, R. 2025. Selebi & Selkirk Projects Marketing Study. A Report for NexMetals Mining Corp. June 2026.

 

Blue Coast Research Reports, 2025. PJ-5564 Selebi Flotation Products – MIN01 Report, Selebi Cu-Ni Flotation, Sebei LCT’s, Concentrate Quality Assays.

 

Boryta, M.D. and Condie, K.C., 1990. Geochemistry and origin of the Archaean Beit Bridge complex, Limpopo Belt, South Africa. J. geol. Soc. London 147, pp. 229-239

 

Brown, P. J., 1987. Petrogenesis of Nickel/Copper orebodies, their host rocks and country rocks at Selebi Phikwe, eastern Botswana. Unpublished Ph.D. Thesis, Univ. of Southampton, UK, 333 p.

 

Carney, J.N., Aldiss, D.T., and Lock, N.P., 1994. The Geology of Botswana. Geological Surveys Department, Bulletin 37, pp. 1-113.

 

Dirks, P.H.G.M., 2005. A Preliminary Assessment of the Structural Setting of the Ni-Sulphide Mineralization Near Selebi-Phikwe, Botswana with Reference to Future Exploration Efforts and Training of Geological Staff at the Mine. An unpublished report prepared for BCL Limited.

 

DRA Projects (PTY) Ltd. 2024. Selebi Front End Solutions Study for Premium Nickel Resources Botswana, Selebi, Botswana.

 

Flowsheets Metallurgical Consulting Inc. (FMCI). 2025. Flowsheet Development Selebi Project.

 

Fundikwa, B., 2025. SR242582 – Selebi XRT Test Work Project, internal report by Stark Ventures GmbH.

 

Gallon, M.L., 1986. Structural re-interpretation of the Selebi-Phikwe nickel–copper sulphide deposits, eastern Botswana. In Anhaeusser, C.R., Maske, S. (eds) Mineral deposits of Southern Africa. Geological Society of South Africa, pp. 1663–1669.

 

Gordon, P.S.L., 1973. The Selebi-Phikwe nickel–copper deposits, Botswana. In Lister L.A., (ed) Symposium on granites, gneisses and related rocks. Special Publication, Geological Society of South Africa 3, pp. 167–187.

 

Gy, P.M., 1978. Sampling of Particulate Material - Theory and Practice. Elsevier, Amsterdam, p 297.

 

Hrabi, 2024. Structural Explanation for variation in mineralized zones N2 Limb Zone, Selebi North Deposit, internal report for Premium Nickel Resources Ltd.

 

Hrabi, 2026. Structural Review and 3D Modelling at Selebi and Selebi North Mines, Botswana, internal report by SRK prepared for NexMetals Mining Corp.

 

Jelsma, H.A., and Dirks, P.H.G.M., 2002. Neoarchaean tectonic evolution of the Zimbabwe Craton. Geol. Soc. London, Special Publications, volume 1999, pp. 183-211.

 

Kampunzu, A.B., Tembo, F., Matheis, G., Kapenda, D., and Huntsman-Mapila, P., 2000. Geochemistry and Tectonic setting of mafic igneous units in the Neoproterozoic Katangan basin Central Africa; Implications for Rhodinia break-up. Gondwana Research 3, pp. 125-153.

 

Key, R.M., 1976. The geology of the area around Francistown and Phikwe, northeast and central districts, Botswana. Distr Mem Geol Surv Botswana 3, pp. 5–25.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 199

 

Labuschagne, P., and J. Stapelberg. 2020. BCL Complex Hydrogeological Study: Selebi Phikwe and Tati. GCS Water and Environmental Consultants. Prepared for BCL in Liquidation.

 

Lear, P.A., 1979. The ore mineralogy of the Phikwe and Selebi nickel– copper deposits, Botswana. Geological Society of South Africa, Special Publication 5, pp. 117–132.

 

Lebrun, E., and Tuitz, C., 2022. Structural Review of the Exploration Program at Selebi Mine, Botswana.

 

Lightfoot, P., 2026. Lightfoot Geoscience Inc. – presentations and reports on Selebi-Phikwe.

 

Lotter et al, 2016. Theory of semiconductors: Lotter, N.O., Bradshaw, D.J., and Barnes, A.R., 2016. Classification of the Major Copper Sulphides into semiconductor types, and associated flotation characteristics. Minerals Engineering 96-97, pp. 177-184.

 

Lusinga, D., 2025. Selebi Sensor Sorting Tests, internal report by IMS Engineering

 

Lungu, S., 2016. Competent Person’s Report on BCL Mineral Resources BCL Mine, Selebi Phikwe, Botswana. A report prepared on behalf of BCL Limited.

 

Maier, W., Barnes, S-J., Chinyepi, G., Barton, Jr., M.J., Eglinton, E, and Sheshedi, I., 2008. The Composition of the Magmatic Ni-Cu-(PGE) Sulfide Deposits in the Tati and Selebi Phikwe Belts of Eastern Botswana. Mineralium Deposita Vol., 43, pp. 37-60.

 

McCourt, S., and Armstrong, R. A., 1998. SHRIMP U Pb zircon chronology of granites from the Central Zone, Limpopo Belt, southern Africa: implications for the age of the Limpopo Orogeny. South African Journal of Geology 1998, Vol. 101, pp. 329-337.

 

McCourt, S., Kampunzu, A.B., Bagai, Z., and Armstrong, R., 2004. The crustal architecture of Archaean terranes in northeastern Botswana. S.A. J. Geol. 107, pp. 146-158.

 

Metso, 2025. Selebi Bulk Concentrate Leaching Results of Test L1.

 

Morgan, G.A., 1982. The Mineral Industry of Botswana. In Mineral Yearbook 1980: Volume III Area Reports: International, prepared for the US Department of the Interior by staff of the Bureau of Mines, pp 159-191.

 

SGS, 2021, An Investigation into the Recovery of Copper and Nickel from Composite Samples from the Phikwe-Selebi Deposit, prepared for North American Nickel, (December 13, 2021).

 

SLR Consulting (Canada) Ltd. (SLR). 2022. Technical report Summary on the Selebi Mines, Central District, Republic of Botswana, Report for NI 43-101 prepared for North American Nickel Inc., Premium Nickel Resources Corporation, Premium Nickel Resources Ltd. (June 16, 2022).

 

SLR Consulting (Canada) Ltd. (SLR). 2024. NI 43-101 Technical Report. Selebi Mines, Central District, Republic of Botswana, Prepared for Premium Nickel Resources Ltd. (September 20, 2024).

 

Stark Resources, 2024, Selebi Intrinsic Ore Sorting Test Report, Project D241353 – Selebi, May 28, 2024.

 

Wakefield, J. 1976. The structural and metamorphic evolution of the Pikwe Ni–Cu sulfide deposit, Selebi-Phikwe, eastern Botswana. Econ. Geol., 71, pp 988–1005.

 

Williams, P., 2005, Selebi-Phikwe Aeromagnetic Interpretation. An unpublished report prepared by SRK Consulting on behalf of BCL Limited.

 

Wright, L., 1977, A Structural Cross Section Across the North Margin of the Limpopo Belt. Ph.D. thesis, University of Leeds, UK.

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 200

 

28.Date and Signature Page

 

This report titled “S-K 1300 Technical Report Summary, Selebi Mines Copper-Nickel-Cobalt Project, Botswana” for NexMetals Mining Corp. with an effective date of 16 October 2026 was prepared and signed by the following authors:

 

The MSA Group (Pty) Ltd.

 

Per:

 

/s/Jeremy Witley

 

Jeremy Witley

 

Head of Mineral Resources

 

Dated at Johannesburg, South Africa

 

16 November 2026

 

Fuse Advisors

 

Per:

 

/s/ Ross Weymark

 

Ross Weymark

 

VP of Operations/Partner

 

Dated at Vancouver, BC

 

16 November 2026

 

J5051 – Selebi Mines Copper-Nickel-Cobalt Project S-K 1300 Technical Report Summary 16 November 2026Page: 201