Technical Report Summary
of the
2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for:
Intrepid Potash–New Mexico, LLC
Revised Report Date:
February 11, 2025
Effective Date:
December 31, 2024
Prepared by:
image_0.jpg
660 Rood Avenue, Suite A
Grand Junction, Colorado 81501
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
ii
Date and Signature Page
This report titled “Technical Report Summary of the 2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico” is effective as of December 31, 2024, and was prepared and signed by RESPEC Company, LLC, acting as a Qualified Person Firm.
Signed and Dated February 11, 2025.
signed/ RESPEC Company, LLC
Susan B Patton, PE
Principal
On behalf of RESPEC Company, LLC
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
iii
Technical Report Summary
of the
2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Table of Contents
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
iv
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
v
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
vi
List of Tables
Page
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
vii
List of Figures
Page
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
viii
List of Abbreviations
°
degree
%
percent
AMAX
AMAX/Horizon Mine
APR
Annual Percentage Rate
BLM
United States Bureau of Land Management
BNSF
Burlington Northern Santa Fe
CFR
Code of Federal Regulations
CL
Competitive Lease
COGS
cost of goods sold
CPD
Carlsbad Potash District
DMS
dense media separation
DOI
United States Department of Interior
EA
Environmental Audit
EIS
Environmental Impact Statement
EOY
end of year
F
Fahrenheit
FR
Federal Register
ft
feet or foot
ft3
cubic foot
ft%
feet-percent
g
grams
g/cm3
grams per cubic centimeter
gpm
gallons per minute
GT
grade thickness
hp
horsepower
ID2
inverse distance squared
Intrepid
Intrepid Potash, Inc.
IPNM
Intrepid Potash–New Mexico, LLC
K2O
potassium oxide
K2SO4 ·2MgSO4
langbeinite
KCl
sylvite or potassium chloride
KPLA
Known Potash Leasing Area
LOM
Life-of-Mine
NMED
New Mexico Environmental Department
M
million
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
ix
MOP
Muriate of Potash
MSHA
Mine Safety and Health Administration
msl
mean sea level
mm
millimeter
Mt
million tons
Mtpy
million tons per year
NaCl
halite
NCL
Non-Competitive Lease
NPV
Net Present Value
NAD
North American Datum
OSHA
Occupational Safety and Health Administration
PFD
process flow diagrams
PRL
Preference Rights Lease
QP
Qualified Person
RC
reflux classifier
REC
Recognized Environmental Concerns
RESPEC
RESPEC Company LLC
SEC
United States Securities Exchange Commission
SME
Society for Mining, Metallurgy & Exploration
SOE
statement of earnings
SOP
standard operating procedure
t
ton
TOC
Total Organic Carbon
tph
tons per hour
tpy
tons per year
TSF
Tailings Storage Facility
US
United States
USGS
United States Geological Survey
WIPP
Waste Isolation Pilot Plant
XRD
X-ray Diffraction
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
1
1.0Executive Summary
RESPEC Company, LLC. was commissioned by Intrepid Potash, Inc. (Intrepid) to prepare the 2024 Technical Report Summary (TRS) filed as Exhibit 96.1 with the Intrepid Potash 10-K for End of Year (EOY) 2024 for the Intrepid Potash-New Mexico (IPNM) property. See Table 2-1 for previous TRS filings for the property. This report updates resource and reserve tables and updates the cash flow and economic analysis to reflect the change in mine plan for the sylvinite deposit and lease boundary adjustments. The resources and reserves are estimated according to United States (US) Securities and Exchange Commission (SEC) S-K 1300 regulations.
1.1Property Description and Ownership
The property includes two operating mines, the East Underground mine and the HB Solar Solution Mines (HB Mine), the idled West Mine, and the North Mine which was shut down in the early 1980’s. The property is located in Eddy and Lea Counties, near Carlsbad, New Mexico.
The East Plant processes the underground room-and-pillar-mined langbeinite ore into Trio®. The long-term underground mining plan is undecided and therefore previously reported reserves have been reestablished as resources. The HB Plant produces Muriate of Potash (MOP) from the solution mine brine. Solution mining of the 1st and 3rd ore zones in previously mined-out areas of the property is planned to continue long term.
1.2Geology and Mineralization
The geology of the potash-bearing beds of the Carlsbad area has been well documented. Overall, the potash-bearing beds may be described as bedded sedimentary rocks, deposited across the Delaware Basin and Northwest Shelf backreef from the Capitan Reef.
1.3Status of Exploration, Development and Operations
The property has been in continuous operation by IPNM since 2004. Confirmation drilling, channel sampling, and mine development are an integral part of the mine operations.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
2
1.4Mineral Resource Estimates
The resource model created from the database of exploration and sampling data served as the basis for the mineral resource estimate. The sampling data includes channel samples from the active mining horizon. The resources reported as mineralized rock in place, exclusive of mineral reserves effective December 31, 2024, are shown in Table 1-1 and Table 1-2.
Table 1-1.    Mineral Resource Estimate Summary effective December 31, 2024
IPNM - Summary of Mineral Resources in millions of tons of Sylvinite in Place effective December 31, 2024, based on $450/Product Ton Mine Site
Resources
Sylvinite1
Grade
Contained
K2O
Mining Cutoff2
Processing Recovery
(Mt)
(%K2O)
(Mt)
(ft-%K2O)
(%)
Measured Mineral Resources
288
16
45
54-64
75-85
Indicated Mineral Resources
164
14
24
54-64
75-85
Measured + Indicated Mineral Resources
452
15
69
Inferred Mineral Resources
1Sylvinite is a mixed evaporite containing NaCl and KCl.
2Solution mining resource cutoff for flooded old working is the mining extents boundary.
Mineral Resources were prepared by RESPEC, a qualified firm for the estimate and independent of Intrepid Potash, for EOY 2024.
Mineral Resources are reported exclusive of Mineral Reserves, on a 100% basis.
Mt = million tons, % = percentage, K2O = potassium oxide, ft = feet
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
3
Table 1-2.    Mineral Resource Estimate Summary effective December 31, 2024
IPNM - Summary of Mineral Resources in millions of tons of Langbeinite Mineralized Rock in Place effective December 31, 2024 based on $470/Product Ton Mine Site
Resources
Langbeinite Mineralized
Rock
Grade
Contained
K2O
Mining Cutoff
Processing Recovery
(Mt)
(%K2O)
(Mt)
(ft-%K2O)
(%)
Measured Mineral Resources
67
10
6
25
68
Indicated Mineral Resources
59
10
6
25
68
Measured + Indicated Mineral Resources
126
10
12
Inferred Mineral Resources
Mineral Resources were prepared by RESPEC, a qualified firm for the estimate and independent of Intrepid Potash, for EOY 2024.
Mineral Resources are reported exclusive of Mineral Reserves, on a 100% basis.
Mt = million tons, % = percentage, K2O = potassium oxide, ft = feet

1.5Mineral Reserve Estimates
Using the mineral resource grids, applying a reserve cut-off and modifying factors to a 25-year detailed mine plan reserves for the HB mine were estimated. Table 1-3 shows the estimated reserve summaries in product tons effective December 31, 2024.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
4
Table 1-3.    IPNM Mineral Reserve Estimate Summary effective December 31, 2024
IPNM - Summary of Potash Mineral Reserves effective December 31, 2024 based on $360/Product Ton Mine Site
Reserves
In-Place KCl
In-Situ
Grade1
Product2
Brine Cutoff Grade3
Processing Recovery
(Mt)
(%K2O)
(Mt)
(%K2O)
(%)
Proven Mineral Reserves
5.3
22.9
3.4
2.983
Probable Mineral Reserves

Total Mineral Reserves
5.3
22.9
3.4
1In-situ grade is the amount of K2O in the contact area of the caverns and is used to calculate the In-Place KCl.
2Product is calculated by multiplying In-Place KCl by: dissolution factor of 96%, areal recovery of 100%, geologic factor of 94.2%, plant recovery of 83%, cavern loss factor of 98%, a product purity factor of 103%, a bitterns loss factor of 88% and handling loss factor of 97%.
3Brine cutoff grade is the amount of K2O in the extracted brine necessary to cover the cash costs of production.
Mineral Reserves were prepared by RESPEC, a qualified firm for the estimate and independent of Intrepid Potash, for EOY 2024.
Mineral Reserves are reported exclusive of Mineral Resources, on a 100% basis.
Mt = million tons, % = percent, K2O = potassium oxide, ft = feet

1.6Summary of Capital and Operating Cost Estimates
Operating cash cost per ton of product is estimated from actual operating data to average $260 with a credit for by-product sales of $57/ton resulting in a net operating cost per ton of product of $203.
Capital investment necessary to complete the HB 25-year mine plan includes pipeline upgrades, and well infrastructure to bring the AMAX/Horizon Mine (AMAX) into solution mining production. Capital is introduced in Year 25 for reclamation requirements if mining were to end in the 25th year. This investment is in addition to the sustaining capital requirements.
1.7Economic Analysis
The Net Present Value (NPV) at 8% Annual Percentage Rate (APR) for the before- and after-tax estimated cash flow is positive. The sensitivity to product price and operating cost for an 8% APR was evaluated. Varying costs and sales price plus and minus 10% results in a positive NPV for all options.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
5
1.8Permitting Requirements
The mines are in operation and necessary state and federal operating permits are in place for current operations. IPNM has timely applied for new permits and permit renewals necessary to continue operations, which are being reviewed by regulatory agencies.
1.9Conclusions and Recommendations
The QP recommends that IPNM continue planning for the challenges in solution mining with the presence of low levels of carnallite. No additional exploration work is recommended beyond the ongoing confirmation drilling.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
6
2.0Introduction
This document was prepared to report the IPNM mineral resources in terms of in-situ tons and reserves in terms of saleable product at IPNM under the SEC S-K 1300 rules (2018). The Society for Mining, Metallurgy & Exploration (SME) Guide for Reporting Exploration Information, Mineral Resources and Mineral Reserves (SME 2017) (The SME Guide) supplements the modifying factors used to convert mineral resources to mineral reserves. Previous TRS’s filed for the property are listed in Table 2-1.
2.1Terms of Reference
According to 17 Code of Federal Regulations (CFR) § 229.1300 (2025), the following definitions are included for reference:
An inferred mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. The level of geological uncertainty associated with an inferred mineral resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Because an inferred mineral resource has the lowest level of geological confidence of all mineral resources, which prevents the application of the modifying factors in a manner useful for evaluation of economic viability, an inferred mineral resource may not be considered when assessing the economic viability of a mining project, and may not be converted to a mineral reserve.
An indicated mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of adequate geological evidence and sampling. The level of geological certainty associated with an indicated mineral resource is sufficient to allow a qualified person to apply modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Because an indicated mineral resource has a lower level of confidence than the level of confidence of a measured mineral resource, an indicated mineral resource may only be converted to a probable mineral reserve.
A measured mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of conclusive geological evidence and sampling. The level of geological certainty associated with a measured mineral resource is sufficient to allow a qualified person to apply modifying factors, as defined in this section, in sufficient detail to support detailed mine planning and final evaluation of the economic viability of the deposit. Because a measured mineral resource has a higher
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
7
level of confidence than the level of confidence of either an indicated mineral resource or an inferred mineral resource, a measured mineral resource may be converted to a proven mineral reserve or to a probable mineral reserve.
Modifying factors are the factors that a qualified person must apply to indicated and measured mineral resources and then evaluate in order to establish the economic viability of mineral reserves. A qualified person must apply and evaluate modifying factors to convert measured and indicated mineral resources to proven and probable mineral reserves. These factors include but are not restricted to mining; processing; metallurgical; infrastructure; economic; marketing; legal; environmental compliance; plans, negotiations, or agreements with local individuals or groups; and governmental factors. A probable mineral reserve is the economically mineable part of an indicated and, in some cases, a measured mineral resource.
A proven mineral reserve is the economically mineable part of a measured mineral resource.
Throughout this report, reserves are presented in tons of K2O and potassium chloride (KCl). Historically, assay data have been reported in terms of %K2O and reserves in equivalent tons of K2O. Sylvite is KCl and, in many historical reports, reserve tons or product tons are recorded in terms of tons of KCl. Pure KCl equates to 63.17% K2O by mass. To convert tonnages from K2O to KCl, multiply by 1.583.
2.2Sources of Information
Previously completed reserve estimations under SEC Guide 7 (2008) rules for this property and TRS’s reporting mineral resources and mineral reserves under the SEC S-K 1300 rules are listed in Table 2-1.
2.3Personal Inspection
Personal inspection of the properties has occurred over the years by the QP. The most recent inspection of the property took place on November 6 and 7, 2019. The inspection included an underground and surface visit to the East, West, and HB Mines.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
8
Table 2-1.    Summary of Reserve Reports
Effective
EOY
Title
Notes
Reference
2006Determination of Reserves for IPNM of the Carlsbad East and West MinesIncluded North Mine reserves hoisted through the West Mine Facilities.Agapito 2007
2007Determination of Estimated Proven and Probable Reserves for the Planned HB Solution Mine for Intrepid Mining, LLCAgapito 2008
2008Reserve Update for the Carlsbad HB, East and West Mines for Intrepid Potash, Inc.Agapito 2009
2009Determination of Estimated Proven and Probable Reserves at Intrepid Potash–New Mexico, LLCAgapito 2010
2010Determination of Estimated Proven and Probable Reserves at Intrepid Potash–New Mexico, LLCAAI updated the reserve estimate by adjusting for the mined-out areas of the LOMP.Agapito 2011
2011Determination of Estimated Proven and Probable Reserves at Intrepid Potash–New Mexico, LLCReserve estimate as of EOY 2011 based on depletion by extraction of the IPNM’s LOMP.Agapito 2012
2012Determination of Estimated Proven and Probable Reserves at Intrepid Potash–New Mexico, LLCNew deposit information, lease boundaries, and an updated LOMP were incorporated into the reserve estimate.Agapito 2013
2013Determination of Estimated Proven and Probable Reserves at Intrepid Potash–New Mexico, LLCEOY 2012 estimate was updated to account for depletion by extraction for 2013.Agapito 2014
2014Determination of Estimated Proven and Probable Reserves at Intrepid Potash–New Mexico, LLCEOY 2012 estimate was updated to account for depletion by extraction for the 2013 and 2014 reserve estimate.Agapito 2015
2015End-of-Year 2015 Intrepid Potash, Inc. Reserve for the Carlsbad HB Solar Solution, East and West Mines Intrepid Potash–New Mexico, LLCUpdated lease maps, geologic database as of June 24, 2015, monthly lease reports, production maps, planning maps, and financial documents including sales and costs associated with the HB Solar Solution, West, and East Mines.Agapito 2016
2016End-of-Year 2016 Intrepid Potash, Inc. Reserve for the Carlsbad HB Solar Solution, East and West Mines Intrepid Potash–New Mexico, LLC
Depletion by extraction in the 1st, 3rd, 5th, and 7th ore zones from the 2015 EOY.
Agapito 2017
2017End-of-Year 2017 Intrepid Potash, Inc. Reserve for the Carlsbad HB Solar Solution, East and West Mines
Conventional extraction of langbeinite at the IPNM East Mine 5th ore zone and solution extraction in the 1st and 3rd ore zones at the IPNM HB Solar Solution Mine with updated economic cutoff grades and drill island impacts.
Agapito 2018
20182018 Determination of Estimated Proven and Probable Reserves for the Carlsbad HB Solar Solution, East and West MinesUpdated lease maps, geologic database as of July 7, 2018, monthly lease reports, production maps, planning maps, and financial documents including sales and costs associated with the IPNM HB Solar Solution, West, and East Mines.Agapito 2019
20192019 Determination of Estimated Proven and Probable Reserves for the Carlsbad HB Solar Solution, East and West MinesExtraction, cutoff changes due to economic parameters, new exploration and channel sample data, drill islands, and financial data.Agapito 2020
20202020 Determination of Estimated Proven and Probable Reserves for the Carlsbad HB Solar Solution, East and West Mines
Depletion by extraction in the 1st, 3rd, 5th, and 7th ore zones 2020 EOY.
Agapito 2021
2021Technical Report Summary, 2021 Estimated Resources and Reserves at Intrepid Potash-New MexicoResources and reserves for all applicable zones EOY 2021Agapito 2022
2021Technical Report Summary, REVISED 2021 Estimated Resources and Reserves at Intrepid Potash-New MexicoAdded clarification to resource and reserve estimation methodology, added detail to the operating cost and cash flow methodologyRESPEC 2023
2023Technical Report Summary of the 2023 Estimated Resources and Reserves at Intrepid Potash-New MexicoUpdated resources and reserves, and economics for new HB mine plan and depletion by extraction and lease modifications.RESPEC 2024

RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
9
3.0Property Description
3.1Location and Area of the Property
The IPNM Carlsbad HB Solar Solution, East, West, and North Mines are located in southeastern New Mexico in Eddy and Lea Counties in the Carlsbad Potash District (CPD), as shown in Figure 3-1. The location is further defined by the boundary of the Known Potash Leasing Area (KPLA) as shown in Figure 3-2. This United States Bureau of Land Management (BLM) managed area consists of that part of the district where the co-development guidelines for oil and gas and potash are in effect for federal lands under the Secretary’s Order 3324 dated December 4, 2012 (Federal Register [FR] 2012-29393). This order revises and supersedes the Order of the Secretary of the Interior, dated October 28, 1986 (51 FR 39425), and corrected on August 26, 1987 (52 FR 32171). The 2012 Secretary’s Order does not alter the boundaries of the area. The area also contains state lands that are managed by the state under the New Mexico Oil Conservation Division Order R-111-Q (State of New Mexico Energy, Mineral, and Natural Resources). In general, the stated objective of the Secretary’s Order and R-111-Q is to prevent waste of petroleum and mineral resources and maximize the economic recovery of oil, gas, and potash minerals in the area.
3.2Mineral Rights
IPNM controls the right to mine approximately 127,000 acres in New Mexico. Of that acreage, 21,000 acres are leased from the State of New Mexico, 106,000 acres are leased from the United States government through the BLM, and 300 acres of mineral rights are leased from private owners. IPNM owns 4,700 surface acres near the mine site, adjacent to the federal and state mining leases. Most mining operations are on properties leased from the state or the federal government. These leases generally contain stipulations that require IPNM to commence mining operations within a specified term and continue mining to retain the lease. The stipulations on IPNM leases are subject to periodic readjustment by the applicable state government and the federal government. Federal leases are for indefinite terms subject to readjustment of the lease stipulations, including the royalty payable to the federal government, every 20 years. Leases with the State of New Mexico are issued for terms of 10 years and for as long thereafter as potash is produced in commercial quantities and are subject to readjustment of the lease stipulations, including the royalty payable to the state. Table 3-1 lists the leases and the terms.
3.3Significant Encumbrances
The IPNM properties are pledged as collateral for Intrepid’s revolving credit facility Various reclamation bonds totaling $4.057 million are in place as of December 31, 2024.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
10
image_1.jpg
Figure 3-1.    Location Map for the IPNM HB, East, West, and North Mines near Carlsbad, New Mexico
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
11
image_2.jpg
Figure 3-2.    Location Map Depicting the Secretary’s Order for the Potash Area
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
12
Table 3-1.    Property Lease Details
Federal Land Lease
Number
Lease Type
Mine
Date
Royalty Rate
Acres
(BLM)
Readjustment
Due
Amount
Paid
Date
Paid
NMNM 029268401
Potassium PRL
East
1966
2,546 12/1/2026$10,184.00 12/18/2024
NMNM 012181001
Potassium PRL
HB
1965
5% Leased Deposits
640 1/1/2045$2,560.00 12/18/2024
NMNM 005728701
Potassium PRL
East
1963
2,461 1/1/2044$9,848.00 12/18/2024
NMNM 002362301
Potassium PRL
HB
1962
5% Leased Deposits
400 2/1/2042$1,600.00 12/18/2024
NMNM 001654001
Potassium PRL
West
1960
120 4/1/2040$480.00 12/18/2024
NMNM 001474201
Potassium PRL
East
1963
640 8/1/2043$2,560.00 12/18/2024
NMNM 000685901
Potassium PRL
East
1953
2,554 10/26/2033$10,220.00 12/18/2024
NMNM 000610101
Potassium PRL
West
1958
1,200 2/1/2038$4,800.00 12/18/2024
NMNM 0554864
Potassium PRL
East
1953
1,250 2/24/2033$5,004.00 12/18/2024
NMNM 0554863
Potassium PRL
East
1953
200 2/24/2033$800.00 12/18/2024
NMNM 0554862
Pot Fringe Acre NCL
East
1953
480 2/24/2033$1,920.00 12/18/2024
NMNM 0220116
Potassium CL
HB
1961
5% Leased Deposits
2,552 12/1/2041$10,208.00 12/18/2024
NMNM 0184150
Potassium PRL
West
1949
240 11/30/2029$960.00 12/18/2024
NMNM 0184149
Potassium PRL
West
1955
80 1/1/2035$320.00 12/18/2024
NMNM 0135065
Pot Fringe Acre NCL
HB
1961
5%+1cent mrt
200 6/1/2041$800.00 12/18/2024
NMNM 131012
Pot Fringe Acre NCL
East
2016
1,320 3/1/2036$5,280.00 12/18/2024
NMNM 131011
Pot Fringe Acre NCL
East
2016
2,000 3/1/2036$8,000.00 12/18/2024
NMNM 131010
Pot Fringe Acre NCL
East
2016
1,280 3/1/2036$5,120.00 12/18/2024
NMNM 120103
Pot Fringe Acre NCL
East
2012
1,920 10/1/2032$7,680.00 12/18/2024
NMNM 120102
Pot Fringe Acre NCL
West
2012
1,560 10/1/2032$6,240.00 12/18/2024
NMNM 120101
Pot Fringe Acre NCL
East
2012
2,240 10/1/2032$8,960.00 12/18/2024
NMNM 118970
Potassium CL
East
2008
320 1/1/2028$1,280.00 12/18/2024
NMNM 118969
Potassium CL
East
2008
320 1/1/2028$1,280.00 12/18/2024
NMNM 113457
Pot Fringe Acre NCL
HB
2012
5% Leased Deposits
560 10/1/2032$2,240.00 12/18/2024
NMNM 113456
Pot Fringe Acre NCL
HB
2012
5% Leased Deposits
2,480 10/1/2032$9,920.00 12/18/2024
NMNM 113455
Pot Fringe Acre NCL
HB
2012
5% Leased Deposits
2,401 10/1/2032$9,604.00 12/18/2024
NMNM 112199
Pot Fringe Acre NCL
HB
2007
Sliding Scale (POT); 5% Lang
434 2/1/2027$1,740.00 12/18/2024
NMNM 110949
Pot Fringe Acre NCL
East
2004
1,918 12/1/2044$7,672.00 12/18/2024
NMNM 0088285
Pot Fringe Acre NCL
HB
1960
5%+1cent mrt
120 8/1/2040$480.00 12/18/2024
NMNM 080707
Pot Fringe Acre NCL
East
1963
2,520 8/1/2043$10,080.00 12/18/2024
NMNM 0070607
Pot Fringe Acre NCL
West
1960
552 2/1/2040$2,208.00 12/18/2024
NMNM 0063880
Pot Fringe Acre NCL
West
1959
120 7/1/2039$480.00 12/18/2024
NMNM 054619
Pot Fringe Acre NCL
East
1983
2,092 3/1/2043$8,368.00 12/18/2024
NMNM 0050249A
Potassium PRL
HB
1963
5% Leased Deposits
920 9/1/2043$3,680.00 12/18/2024
NMNM 047021
Pot Fringe Acre NCL
East
1982
1,105 7/1/2042$4,424.00 12/18/2024
NMNM 0045410
Potassium PRL
East
1958
2,438 6/1/2038$9,756.00 12/18/2024
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
13
Federal Land Lease
Number
Lease Type
Mine
Date
Royalty Rate
Acres
(BLM)
Readjustment
Due
Amount
Paid
Date
Paid
NMNM 041639
Pot Fringe Acre NCL
East
1981
120 7/1/2041$48012/18/2024
NMNM 040362
Pot Fringe Acre NCL
East
1980
280 12/1/2040$1,12012/18/2024
NMNM 040071
Potassium CL
North
1980
2,080 5/1/2040$8,32012/18/2024
NMNM 0036791
Potassium CL
HB
1957
5% Leased Deposits
1,840 
10/1/1037
$7,36012/18/2024
NMNM 0035383
Potassium CL
East
1957
2,400 1/1/2038$9,60012/18/2024
NMNM 0033696A
Potassium PRL
East
1957
1,241 3/1/2038$4,96412/18/2024
NMNM 0033696
Potassium PRL
West
1958
960 3/1/2038$3,84012/18/2024
NMNM 028916
Pot Fringe Acre NCL
West
1963
880 8/1/2043$3,52012/18/2024
NMNM 028915
Potassium PRL
East
1958
118 6/1/2038$47212/18/2024
NMNM 025234
Potassium PRL
West
1949
80 11/30/2029$32012/18/2024
NMNM 025233
Potassium PRL
West
1952
1,600 1/2/2032$6,40012/18/2024
NMNM 025232
Potassium PRL
West
1951
1,600 7/6/2031$6,40012/18/2024
NMNM 024522
Pot Fringe Acre NCL
West
1982
800 3/1/2042$3,20012/18/2024
NMNM 018417
Pot Fringe Acre NCL
East
1952
160 1/9/2032$64012/18/2024
NMNM 0015064C
Potassium PRL
East
1953
1,049 10/25/2033$4,20012/18/2024
NMNM 0015064B
Potassium PRL
East
1953
1,280 10/26/2033$5,12012/18/2024
NMNM 0015064A
Potassium PRL
East
1953
1,600 10/26/2033$6,40012/18/2024
NMNM 013933
Pot Fringe Acre NCL
HB
1971
5% Leased Deposits
80 10/1/2031$32012/18/2024
NMNM 013932
Pot Fringe Acre NCL
West
1974
640 11/1/2034$2,56012/18/2024
NMNM 012763
Pot Fringe Acre NCL
HB
1971
5% Leased Deposits
160 6/1/2031$64012/18/2024
NMNM 0011777
Pot Fringe Acre NCL
North
1952
1% ORRI
1,118 1/9/2032$4,47212/18/2024
NMNM 0011776
Pot Fringe Acre NCL
North
1952
1% ORRI
2,559 1/9/2032$10,24012/18/2024
NMNM 0007005
Potassium PRL
West
1952
2,073 1/2/2032$8,29612/18/2024
NMNM 0003468
Pot Fringe Acre NCL
West
1958
960 7/1/2038$3,84012/18/2024
NMLC 007186801
Potassium PRL
East
1955
1,938 9/1/2035$7,75612/18/2024
NMLC 007014101
Potassium PRL
HB
1959
5%+1cent mrt
439 1/1/2039$1,75612/18/2024
NMLC 006839701
Potassium PRL
North
1952
1% ORRI
1,920 1/9/2032$7,68012/18/2024
NMLC 006602601
Potassium PRL
HB
1955
5% + 1cent mrt
200 9/1/2035$80012/18/2024
NMLC 006569301
Potassium PRL
West
1958
560 2/1/2038$2,24012/18/2024
NMLC 006556601
Potassium PRL
HB
1951
5% Leased Deposits; 1.0987% ORRI
720 9/28/2031$2,88012/18/2024
NMLC 006528601
Potassium PRL
North
1952
1% ORRI
2,554 1/9/2032$10,21612/18/2024
NMLC 006527501
Potassium PRL
North
1952
1% ORRI
2,551 1/9/2032$10,20412/18/2024
NMLC 006508101
Potassium PRL
HB
1950
Sliding Scale (POT); 1.0987% ORRI
560 12/6/2030$2,24012/18/2024
NMLC 006184701
Potassium PRL
West
1951
1.0987% ORRI
1,275 7/6/2031$5,10412/18/2024
NMLC 0050063F
Potassium PRL
HB
1939
5% Leased Deposits; 1.0987% ORRI
2,358 4/15/2039$9,43612/18/2024
NMLC 0050063B
Potassium PRL
HB
1939
5% Leased Deposits; 1.0987% ORRI
2,560 4/15/2039$10,24012/18/2024
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
14
Federal Land Lease
Number
Lease Type
Mine
Date
Royalty Rate
Acres
(BLM)
Readjustment
Due
Amount
Paid
Date
Paid
NMLC 0046729D
Pot Fringe Acre NCL
HB
1933
5% Leased Deposits; 1.0987% ORRI
2,560 1/18/2033$10,240 12/18/2024
NMLC 0046729C
Pot Fringe Acre NCL
HB
1933
5% Leased Deposits; 1.0987% ORRI
2,280 1/18/2033$9,120 12/18/2024
NMLC 0046729A
Pot Fringe Acre NCL
HB
1933
5% Leased Deposits; 1.0987% ORRI
2,559 1/18/2033$10,236 12/18/2024
NMLC 0044752
Pot Fringe Acre NCL
HB
1956
5% Lang
240 9/1/2036$960 12/18/2024
NMLC 0043636C
Pot Fringe Acre NCL
West
1932
920 6/20/2032$3,680 12/18/2024
NMLC 0043636B
Pot Fringe Acre NCL
West
1932
2,312 6/20/2032$9,248 12/18/2024
NMLC 0043636A
Pot Fringe Acre NCL
West
1932
1,044 6/20/2032$4,180 12/18/2024
NMLC 0036092C
Pot Fringe Acre NCL
West
1929
2,559 11/21/2029$10,240 12/18/2024
NMLC 0036092B
Pot Fringe Acre NCL
West
1929
2,026 11/21/2029$8,104 12/18/2024
NMLC 0036092A
Pot Fringe Acre NCL
West
1929
2,437 11/21/2029$9,748 12/18/2024
State of New Mexico
Land Lease Number
Lease Type
Issue
Date
Acres
(State)
Amount
Paid
Date Paid
HP00050001
Potash
2005
3,200HBP$3,2005/23/2024
M006510011
Potash
1936
17,486HBP$1,7491/21/2024
NOTE—Coordinate System: Shifted from North American Datum (NAD) 27 New Mexico State Plane North to Local Mine Grid
PRL = Preference Rights Lease; CL = Competitive Lease; NCL = Non-Competitive Lease

3.4Significant Factors
There are no significant factors or risks that may affect access, title, or the right or ability to perform work on the property.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
15
4.0Accessibility
4.1Topography, Elevation, and Vegetation
The topography is explained in the HB Mine Environmental Impact Statement (EIS) (United States Department of Interior [DOI] 2012) as a karst topography with sinkholes, caves, and enclosed depressions. The topography is the result of the dissolution of evaporite deposits in the subsurface. The vegetation cover in the permit area is typical of the Pecos Valley on the eastern edge of the Guadalupe Mountains. The area is dominated by desert scrub, mesquite upland scrub, and grasslands (DOI 2012). The mines are located at an approximate surface elevation of 3,500-ft mean sea level (msl).
4.2Property Access
The mining facilities are accessible by both road and rail as shown in Figure 4-1. Adequate infrastructure is in place to meet production requirements. Shipment of product is by truck and rail via paved United States Highway 180-W and the Burlington Northern Santa Fe (BNSF) rail link. The area is served by small air carriers at the Cavern City Terminal located in Carlsbad, New Mexico. Airports are located in Midland, Texas and El Paso, Texas, approximately 125 and 200 miles from the property, respectively.
4.3Climate
The climate is generally mild with an average temperature of 62.4 degrees Fahrenheit (°F). The precipitation, as rainfall during the monsoon season from May to September, averages 13.4 inches. Average annual snowfall is 3 inches (US Climate Data 2020). The weather is favorable to conducting solar evaporation. Operations continue throughout the year without significant weather disruption.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
16
4.4Infrastructure Availability
IPNM has sufficient water rights, reliable electric power, and a robust supply chain. IPNM competes with other industries in the Carlsbad area for qualified labor. Layoffs in market downturns may make it more difficult to re-hire personnel as needed.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
17
image_3.jpg
Figure 4-1.    Mine Locations showing Property Access
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
18
5.0History
Potash was first discovered in southeast New Mexico in 1925 in Eddy County, New Mexico, in Snowden McSweeney Well No. I on a V. H. McNutt permit near the center of the portion of what is now the KPLA. Commercial shipments began in 1931. The ownership history is listed in Table 5-1.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
19
Table 5-1.    Mine Ownership History
Property
Owner
Date
East Mine
Kerr-McGee Chemical Corporation
1961–1985
New Mexico Potash Corporation (Trans Resources, Inc.)
1985–1996
Mississippi Potash Inc.
1996–2004
Intrepid Potash, Inc. (Intrepid Mining- NM, LLC)
2004–Present
West Mine
U. S. Potash Company
1929–1956
U.S. Borax and Chemical Corporation
1956–1968
U.S. Potash and Chemical
1968–1970
Continental American Royalty Corporation
1970–1972
Teledyne
1972–1974
Mississippi Chemical Company (MCC)
1974–1996
Mississippi Potash, Inc. (MPI) (a subsidiary of MCC)
1996–2004
Intrepid Potash, Inc. (Intrepid Mining - NM, LLC)
2004–Present
North Mine
National Potash Company (Freeport Sulphur Company)
1957–1982
New Mexico Potash Corporation (Trans Resources Inc.)
1982
Mississippi Chemical Corporation
1985–1988
Mississippi Chemical Corporation
1992–1996
Mississippi Potash Inc.
1996–2004
Intrepid Potash, Inc. (Intrepid Mining- NM, LLC)
2004–Present
AMAX Mine
Southwest Potash Corporation
1948
AMAX Potash
1986–1992
Horizon Gold (Horizon Potash)
1992–1995
Intrepid Potash, Inc. (Intrepid Mining - NM, LLC)
2012–Present
HB Mine
Potash Corp of America
1934–1967
Ideal Basic 
1967–1985
Lundberg Industries
1985–1987
Trans-Resource (Eddy Potash)
1987–1996
Mississippi Potash, Inc.
1996–2004
Intrepid Potash, Inc. (Intrepid Mining NM, LLC)
2004–Present

RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
20
6.0Geologic Setting
The term “potash” is a generic term describing potassium in combination with chloride, sulfates, or nitrates. Potassium is one of the key nutrients for plants in fertilizer with nitrogen and phosphorus. Potash-bearing evaporites are typically formed as the result of evaporation of brine in basins with restricted outlets. Potash zones are found near the top of halite beds because potash is precipitated from the concentrated brines found at the end of the evaporation sequence. Important natural and commercial soluble potassium salts are sylvite (KCl) and langbeinite, a potassium magnesium double salt (K2SO4 ·2MgSO4) (Barker and Austin 1999).
6.1Deposit Type
The geology of the potash-bearing beds of the Carlsbad area has been well documented. Overall, the potash-bearing beds may be described as bedded sedimentary rocks, deposited across the Delaware Basin and Northwest Shelf backreef from the Capitan Reef. The depositional sequences that developed in the Salado Formation consist of repetitive cycles that can be recognized by changes in mineralogy, sedimentary textures, and structures. Two types of cycles are differentiated as Type I and Type II. A complete Type I cycle ranges in thickness from 3 ft to 33- ft and consists of (in ascending order):
A basal, mixed siliciclastic and carbonate mudstone
Laminated to massive anhydrite-polyhalite
Halite
Halite with mud (argillaceous halite)
Type II is a thinner, less complete sequence and consists of halite that grades upward into argillaceous halite (Lowenstein 1988). The anhydrite-polyhalite beds are laterally continuous over large distances and are used as marker beds for correlation. Potash beds are not included in these sequences because potash is secondary and formed later than the basic depositional sequence.
6.2Regional Geology
The Carlsbad area falls within the Delaware Basin of Permian Age. The Delaware Basin has a maximum width of approximately 100 miles and a length of approximately 150 miles, extending from north of Carlsbad, New Mexico, to Pecos County, Texas.
The Permian Age sequence comprises the Ochoan, Guadalupe, Leonard, and Wolfcamp series in order of increasing age (Linn and Adams 1966). Laterally extensive, evaporite beds
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
21
containing deposits of halite, sylvite, langbeinite, kainite, carnallite, and other evaporite minerals are found within the Ochoan Series, whose top ranges from a depth of 2,000 ft near the Texas State line to approximately 200 ft below surface north of Carlsbad.
The Ochoan Series is divided into four formations as follows, in order of increasing depth (Vine 1963):
Dewey Lake Red Beds, which consist of 200 to 250 ft of fine-grained sandstone, siltstone, and shale of low permeability that is absent west of the Pecos River.
Rustler Formation, which consists of approximately 350 ft of dolomite and anhydrite beds that outcrop along the Pecos River west of the potash area.
Salado Formation, which was originally called the Upper Castile Formation and was separated from the underlying Castile based on a potash content of more than 1% K2O (Kroenlein 1939). The Salado Formation contains 12 potash zones, of which 6 have been or are currently being mined.
Castile Formation, which is laterally bounded by the Guadalupian Age Capitan Reef limestones that define the Delaware Basin and consists of calcite-banded anhydrite and halite formed in a deep-water environment (Cheeseman 1978).
The Salado Formation thickness ranges from 1,200 ft to 2,300 ft and consists of an unnamed Upper Member, the McNutt Potash Member, and an unnamed Lower Member. Much of the variation in thickness is due to removal of halite by dissolution. It is an evaporite sequence dominated by 650 to 1,300 ft of halite and argillaceous halite and contains over 42 informally named or numbered marker beds in addition to 11 numbered potash zones within the McNutt Potash Member (Table 6-1). Figure 6-1 shows the zones in a cross section through the Property.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
22
Table 6-1.    The Potash Zones in the McNutt Potash Member
Potash Zone
Marker Bed
Thickness
(ft)
Approximate Depth
from Top of Salado
(ft)
Lithology
MB103
20
180
Anhydrite
MB109
20
320
Anhydrite, finely crystalline, interbedded with stringers of halite, polyhalite and mudstone
Vaca Triste
10
540
Siltstone and silty mudstone interbedded with halite
11



Mostly carnallite, minor sylvite, leonite
MB117
Polyhalite
MB119
Polyhalite
10

Sylvite, sylvinite

MB120
Anhydrite
9

Carnallite, kieserite, sylvite
MB121
Polyhalite
MB122
Polyhalite
8

Sylvite

Union Anhydrite
15-20
760
Anhydrite, finely crystalline with stringers of halite
7



Sylvite, sylvinite
6



Carnallite, kieserite, etc.
5



Sylvite, langbeinite

MB123
5-10
845
Halite and polyhalite

MB124
5-10
870
Anhydrite, finely crystalline laminated. May have stringers of mudstone
4



Langbeinite, sylvite
3



Sylvite, sylvinite
2



Carnallite, kieserite, etc.

MB125
Polyhalite
1

Sylvite and sylvinite

MB126
Polyhalite

MB134
10-15
1,260
Anhydrite

MB136
10-15
1,340
Anhydrite. May have interbeds of halite or polyhalite

MB142
15
1,550
Anhydrite with interbeds of halite and stringers of mudstone

Cowden Anhydrite
20
1,700
Anhydrite, finely crystalline, laminated. May have thin interbeds of magnesite and mudstone. Divided into two beds by intervening halite in SE Eddy County

Source: Backman (1984); Griswold (1982)

RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
23
6.3Property Geology
Sylvinite is currently being mined using solution methods in the 1st and 3rd ore zone. Historically, sylvinite has been conventionally underground mined in the 1st, 3rd, 5th, 7th, and 10th ore zones.
Mechanical mining of langbeinite is currently occurring in the 3rd and 5th ore zones at the East Mine. Langbeinite is prevalent in the 3rd and 4th ore zones in the southern part of the Delaware Basin, part of the Permian Basin, and occurs mixed with sylvite in the 5th ore zone.
The property stratigraphic column is shown in Figure 6-2.
6.3.1East Mine
Historically, the East Mine primarily mined sylvinite in the 10th ore zone. Current mining is predominantly taking place on the 5th mixed and 3rd langbeinite ore zones. The 5th ore zone is a mixed ore consisting of variable amounts of K2O as langbeinite and sylvite. The 5th ore zone, predominant in langbeinite, is mined and blended with the 3rd langbeinite ore. The common minerals found at the mine are halite, sylvite, clay (montmorillonite), sulfate minerals, and carnallite. The eastern sections of the mine have large deposits of carnallite and kieserite. The 10th ore zone is also characterized by isolated pods of barren clays. These clay pods range in size from a few square feet to several hundred thousand square feet. The location of these pods is random, and there is no known practical method of predicting their location.
6.3.2West Mine
The potash deposits at the West Mine consist of mixed sylvite (KCl) and halite (NaCl) in two distinct zones within one of the flat-lying halite beds. This bed is located near the middle of the Salado Formation. Thin zones of enriched potash-bearing minerals are located within the 150-ft deposit.
Mining activities most recently took place in the 5th, 7th, and 10th ore zones. In most parts of the deposit, the vertical change from ore to barren salt is abrupt, while the lateral transition at the edges of the ore body is gradual. Barren masses of halite, known as “salt horses,” are scattered irregularly throughout the ore body. The ore is an intimate intergrowth of crystalline NaCl and KCl in various proportions, with sylvite typically less than 35% by weight. Sylvite is milky or faintly bluish gray but is often stained red by iron oxide around the crystals. Halite commonly is clear, grayish, or orange/yellow with occasional red staining. Blue halite is occasionally found associated with the sylvite.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
24
6.3.3North Mine
In the vicinity of the North Mine, the 10th ore zone is encountered at depths of between approximately 1,400 and 1,900 ft below ground surface. The 10th ore zone consists of two sylvinite beds separated by a halite unit. The lower member, or zone 10C, is the target ore bed for the North Mine and may vary in thickness from 3 to 8 ft.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
25
image_4.jpg
Figure 6-1.    Carlsbad Potash District Regional Cross Section (Lewis 2007)
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
26
image_5.jpg
Figure 6-2.    Typical Stratigraphic Column of the Ochoan (Warren 2018; Barker et al 1993)
6.3.4HB Solar Solution Mine
The HB Mine, which was formerly owned by the Eddy Potash, Co., and mined on the 1st and 3rd ore zones (Barker and Austin 1999), has been flooded and is currently being solution mined with brines to obtain potash from the remaining pillars.
6.4Mineralization
In the Carlsbad Area, the potassium minerals, in order of decreasing abundance, are polyhalite, sylvite, carnallite, langbeinite, kainite, and leonite. Other potassium minerals occur only in minor amounts in association with the principal potassium minerals listed previously. The mineralogy of the zones found in the Carlsbad Area are summarized in Table 6-2.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
27
Table 6-2.    Carlsbad Area Minerals and Their Compositions
Ore
Zone
Closest Marker Bed
Approximate
Bed Depth
(ft-bgs)
Bed
Thickness
(ft)
Clay
Content
(%)
Mineralogy
Mineability and Status
Above Ore Zone
Below
Ore
Zone
Eleventh
Vaca Triste
MB117
Mostly carnallite, minor silvite and leonite
Not commercial
Tenth
MB119
MB120
700
5–12
5–7
Sylvite
Second best in District; in production
Ninth
MB120
MB121
Carnallite, kieserite, minor sylvite
Not commercial
Eighth
MB122
Union
6–7
Sylvite
Moderate size; unmined
Seventh
Union
5–9
3–4
Sylvite
Formerly mined; standby
Sixth
Union
Carnallite, kieserite, etc.
Not commercial
Fifth
Union
MB123
800
4.7–5
1
Sylvite and langbeinite
In production
Fourth
MB 124
850
4
Langbeinite and sylvite
Principal source of langbeinite; in production
Third
MB 124
865
3-6
Langbeinite and sylvite
In solution mining production of sylvite in Amax, In conventional production for langbeinite in East mine
Second
MB 124
MB125
Carnallite, kieserite, etc.
Not commercial
First
MB125
MB126
900
8–14
2
Sylvite
Long-time producer; currently flooded with brine for solution mining
Source: Barker and Austin (1993); Swales (1966); Pierce (1936); Haworth (1949); Bruhn and Miller (1954); Jones et al. (1954); Kirby (1974); Herne and McGuire (2001)
The minerals listed above can be described as follows (Schaller and Henderson 1932):
Polyhalite is the most abundant potassium mineral in the Carlsbad Area. Beds of nearly pure polyhalite have thicknesses up to 8 ft and beds a foot or more thick are numerous.
Sylvite often has a dark red or reddish-brown color due to hematite inclusions. Sylvite without the inclusions is a milky white color. Sylvite is typically mixed with halite and where clay is present in the mixture, it is in bands distinct from the sylvite.
Carnallite is massive and compact showing no crystal faces. Crystals where seen are typically less than 1 millimeter (mm) in diameter. It occurs in small blebs with halite and sylvite.
Langbeinite is found in distinct tetrahedral crystals that reach sizes up to ¾ inch. It is typically associated with halite and sylvite and often some kieserite. It has a distinct pink color in most samples and has a higher compressive strength than sylvite.
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
28
Kainite is massive with poorly developed fibrous fracture surfaces and has a characteristic honey-yellow color. It is found in narrow bands between sylvite and langbeinite and is apparently a result of a reaction between the two.
Leonite is typically found in small quantities in mixtures of other minerals, notably kainite and sylvite. Its color ranges from colorless to pale yellow. It is also found with polyhalite and anhydrite, but the relationship is unclear. It has also been found as a secondary replacement for kieserite.
6.5Geologic Structure
The potash-bearing beds in the Carlsbad Area may be affected by several types of anomalies:
“Salt horses” (Gunn and Hills 1978)
“Mud horses” (Simmons 2013)
Dissolution and collapse anomalies (“breccia chimneys”)
Igneous dykes
The presence of high concentrations of non-economic evaporite minerals, insolubles, or geologic disturbances that influence the normal character of the potash-bearing beds is considered an “anomaly” and may be unsuitable for mining. These anomalies range from localized features significantly less than a square kilometer to disturbances that are regional (i.e., several square kilometers in extent).
RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
29
7.0Exploration
7.1Exploration Other than Drilling
No exploration other than confirmation drilling has been performed.
7.2Drilling Exploration
Intrepid partakes in ongoing exploration as a part of operational long-term planning. Core holes are drilled from the surface and underground, and channel samples are collected as mining advances. Intrepid provided the QP their dataset beginning in 2007. Since that time, multiple data points have been added and several drillholes were reassessed. Potash is also identified from gamma ray geophysical logs in oil and gas wells. Bed thickness and potash grade are estimated and quantified with input from 2,928 sample points. Extensive work was completed with geophysical tools in collaboration with the United States Geologic Survey (USGS) (Nelson 2007) to determine and verify potash grades from gamma logs (Lewis 2006). The sample database for this exploration work is shown in Table 7-1. The dataset is from oil and gas wells, surface core holes, underground core holes, channel samples, shaft samples, and roof bolt holes. The key sample types include 7,209 drillholes and channel samples and are broken down by mining zone. Figure 7-1 shows the exploration drillhole and channel sample locations and regional topography. The dataset used for this reserve evaluation is shown in Table 7-2.
Table 7-1.    Data Sample Sets—All Available Holes
Ore Zone
Oil/Gas
Wells
Surface Core Holes
Underground Core Holes
Channel Samples
Shaft
Roof Bolt
Total
Samples
Zone 2
2
1
2
Zone 3
478
560
57
743
3
1,171
Zone 3A
1
6
1
Zone 4
480
544
62
5
3
1,094
Zone 4A
2
2
Zone 5
488
572
114
2,616
4
42
3,234
Zone 7
484
611
89
805
4
7
2,000
Zone 8
492
613
53
3
1,161
Zone 9
1
1
Zone 10C
506
843
7
181
3
1,540
Total
2,9283,7493824,357204910,206


RESPEC
    

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
30
image_6.jpg
Figure 7-1.    Base Map, Lease Lines, and Drillholes
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
31
Table 7-2.    Data Sample Sets—Resource Evaluation Dataset
Ore Zone
Oil/Gas Wells
Core Holes
Channel Samples
Total Samples
Zone 3
463
542
73
1,078
Zone 4
469
619
12
1,100
Zone 5
482
651
1,9793,112
Zone 7
480
609
831
1,920
Zone 8
476
576
2
1,054
Zone 10
486
729
183
1,398

7.3Characterization of Hydrogeology Data
The characterization of the hydrogeology was completed for the HB Solar Solution Mine by AECCOM in 2011 and is included as part of the publicly available EIS (DOI 2012). The study confirmed the availability of water for the initial flooding of the solution mines at a pumping rate ranging from 177 to 1,440 gallons per minute (gpm).
7.4Characterization of Geotechnical Data
Not applicable.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
32
8.0Sample Preparation
IPNM has standard operating procedures (SOP) in place for logging and sampling core from underground and surface core drilling. According to the SOP’s, the geologist uses gamma ray to initially select the sample interval prior to prepping the sample for analysis. The samples are assayed at the on-site laboratory. The site laboratory has the capability to conduct X-ray Diffraction (XRD), Total Organic Carbon (TOC), and flame photometry laboratory techniques.
The mineral analysis for all core and channel samples is analyzed with the XRD. A sample of approximately 300–500 grams (g) is collected. The sample is split down to around 100 g and run through a grinding mill to reduce the size down to approximately –100 mesh. A sample is weighed out to 5 g and put into a micronizing mill that reduces the particle size to ~10 microns and pressed into a sample holder. The sample is inserted into the instrument and a diffraction pattern is retrieved. The diffraction pattern is then analyzed using the Rietveld refinement software, reporting weight percent of solid mineral in the sample.
The sample preparation, security, and laboratory analytical procedures are conventional industry practice and are adequate for the reporting of resources and reserves.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
33
9.0Data Verification
Due to the proximity of the location to the DOI Waste Isolation Pilot Plant (WIPP) site, and the intensive oil and gas drilling in the Permian Basin, there is geologic data publicly available for comparison. Data was also verified for beds with an extraction history by reconciling actual mining with the planned mining based on geologic modeling from the exploration database.
9.1Data Verification Procedure
The property has been producing for many years. Mining and processing of the ore to successfully marketed products is verification of the exploration data.
9.2Limitations on Verification
There are no limitations on the verification.
9.3Adequacy of the Data
It is the opinion of the Qualified Person (QP) that the data is adequate for the determination of resources and reserves. The deposit has historically and continues to be mined with plans based on the data.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
34
10.0Mineral Processing and Metallurgical Testing
IPNM has a long history of processing ores on-site. Recovery estimates are based on past plant performance, current performance, and anticipated future performance based on laboratory or metallurgical testing of the anticipated plant feed. Over time, the appropriate capital modifications to the plants have been made to accommodate changes in ore feed and market requirements.
10.1Adequacy of the Data
It is the opinion of the QP that the data is adequate for the determination of resources and reserves. The deposit has historically and continues to be processed successfully.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
35
11.0Mineral Resource Estimates
According to 17 CFR § 229.1300 (2025), the following definitions of mineral resource categories are included for reference:
An inferred mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. The level of geological uncertainty associated with an inferred mineral resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Because an inferred mineral resource has the lowest level of geological confidence of all mineral resources, which prevents the application of the modifying factors in a manner useful for evaluation of economic viability, an inferred mineral resource may not be considered when assessing the economic viability of a mining project, and may not be converted to a mineral reserve.
An indicated mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of adequate geological evidence and sampling. The level of geological certainty associated with an indicated mineral resource is sufficient to allow a qualified person to apply modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Because an indicated mineral resource has a lower level of confidence than the level of confidence of a measured mineral resource, an indicated mineral resource may only be converted to a probable mineral reserve.
A measured mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of conclusive geological evidence and sampling. The level of geological certainty associated with a measured mineral resource is sufficient to allow a qualified person to apply modifying factors, as defined in this section, in sufficient detail to support detailed mine planning and final evaluation of the economic viability of the deposit. Because a measured mineral resource has a higher level of confidence than the level of confidence of either an indicated mineral resource or an inferred mineral resource, a measured mineral resource may be converted to a proven mineral reserve or to a probable mineral reserve.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
36
11.1Key Assumptions, Parameters and Methods
The exploration drillhole and channel sample data were compiled to form the database that serves as the basis for estimating the resources. The geologic setting was evaluated, and bed assignments reviewed. Of the data within the lease boundary, all data points contribute bed thickness, and several have assay information.
The geology was modeled using Carlson Software (2020). A basic inverse distance-squared (ID2) algorithm was used with a search radius of ¾ mile to prepare the 100-ft x 100-ft grids for bed thickness and grade. The search radius was applied for Measured and Indicated Resources of ¼ mile and ¾ mile, respectively. Where data is dense, the nearest 25 data points were used to assign values for the grid block. The grids were multiplied by each other to compile a grade-thickness (GT) grid within the lease boundaries held by IPNM. The base grid was adjusted for each ore type cutoff. Key assumptions and parameters for resource estimation are listed in Table 11-1.
The classification of cutoff in terms of GT in units of ft% was defined in the Secretaries Order dated October 21, 1986 (51 FR 39425) for mechanically mined potash deposits. The criteria
Table 11-1.    Parameter Assumptions
Resources
Measured
Indicated
Proximity to sample point
1,320 ft (1/4 mile)
3,960 ft (3/4 mile)
GT for sylvinite mechanical mining
54 ft% K2O
GT for high-insoluble sylvinite mechanical mining*
64 ft% K2O
GT for langbeinite mechanical mining
25 ft% K2O
Flood elevation HB South
2,525 ft
Flood Elevation HB North
2,325 ft
Flood Elevation HB Eddy
2,675 ft
Flood Elevation HB AMAX
2,500 ft
Carnallite content mechanical mining
Less than 6%
Mineability
Reasonably expected to be feasible to mine
*High-insoluble sylvinite zones 8 and 10
are not dependent on thickness or grade, but on the product of the thickness and grade. To evaluate the viability of mining the IPNM mechanically mined resources, a cutoff GT was established. Inputs to the estimation of the cutoff analysis are cost of goods sold, product sale
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
37
price, mill recovery, and nominal grade. The cutoff for solution mining in flooded abandoned underground potash mines is a function of the grade of the brine being extracted which results in enough product tons to just cover the cost of production.
The estimated cost of goods sold (COGS) and sales price used in the cutoff evaluation are outlined in Table 11-2.
Intrepid has a long history of sales and marketing of their products. Sales are managed for all properties through the corporate office. Intrepid provided the historical demand and sales pricing through the statements of earnings (SOE) from 2012 to 2024. Forward-looking pricing was provided by Intrepid marketing. The product sale prices selected for analysis of cutoff grade are shown in Table 11-2. These values are 25% greater than the product sales price for the reserve estimate.
Table 11-2.    Cost of Goods Sold and Sales Price Assumptions
ProductSale PriceFreightNet Sales Price
Cost of Goods Sold (not including by-product credit)
Langbeinite
$470/t
$90/t
$380/t
$272/t
Sylvite Solution Mining
$450/t
$30/t
$420/t
$260/t
Sylvite Mechanical Mining
$450/t
$30/t
$420/t
$272/t
Economic modeling indicates cutoff grades at the IPNM East Mine of 25 ft %K2O for langbeinite resource. Modeling also indicates a cutoff of 64 ft% K2O for the high-insoluble sylvinite resources in the 8th and 10th zones, which requires the capital investment of a new plant and refurbishment of shafts. A cutoff of 54 ft% K2O is indicated for the West sylvinite resources which requires the processing plant, mine equipment, and associated infrastructure to be rehabilitated. Cutoff grades are listed in Table 11-3.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
38
Table 11-3.    Cutoff Grade Analysis for Mechanical Mining
Ore Mineral
Pure
Mineral
(%)
Nominal
Grade
Cutoffs
(% K2O)
Nominal Grade
Cutoffs
(% KCl or Lang)
Mill Recovery
(%)
Grade-
Thickness
Cutoff1
(ft%)
Applicable Ore
Zones
Carlsbad East Mine
East–3, 4 and 5, West–4
Langbeinite2
22.70%5.2%23.0%68%
25
Carlsbad West/North Mine

High-Insolubles Sylvite with CAPEX Burden
63.17%14.4%22.8%75%
64
8 and 10
Carlsbad West Mine
West–3, 4, 5, 7 North–3 and 4
Sylvinite with CAPEX Burden
63.17%11.8%18.7%80%
54
1Equivalent to 5.0-ft-thick ore at nominal grades in the East Mine and 4.5-ft-thick ore at nominal grades in the West and North Mines.
2All langbeinite is processed at the East Plant.
CAPEX = capital expenditure
By definition, the cutoff grade is the grade that determines the destination of the material during mining. The cutoff grade for resources of abandoned underground sylvinite is not a parameter for use in the estimation of solution mining resources but does establish an operational minimum limit for the brine grade reserves. The solution mining resources are the pillars remaining after mining and the fringe boundary of the mine. Resources could also be unmined sylvinite left behind to provide geotechnical support. An operational limit of the flood elevation establishes the cutoff between resource and reserve for this deposit. When mining using solution methods in proximity to other mines, or other underground mines not within the control of IPNM, the critical factor in establishing a flood elevation is to keep adjoining properties dry or to protect structures such as shafts.
Resource maps for sylvinite by zones 10, 8, 7, 5, 4, 3, and 1 are included in Figures 11-1 through 11-7, respectively. The langbeinite mineral resource maps for zones 5, 4, and 3 are included in Figures 11-8 through 11-10.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
39
image_7.jpg
Figure 11-1.    10th Ore Zone Mineral Resources, Sylvinite Ore
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
40
image_8.jpg
Figure 11-2.    8th Ore Zone Mineral Resources, Sylvinite Ore
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
41
image_9.jpg
Figure 11-3.    7th Ore Zone Mineral Resources, Sylvinite Ore
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
42
image_10.jpg
Figure 11-4.    5th Ore Zone Mineral Resources, Sylvinite Ore
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
43
image_11.jpg
Figure 11-5.    4th Ore Zone Mineral Resources, Sylvinite Ore
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
44
image_12.jpg
Figure 11-6.    3rd Ore Zone Mineral Resources, Sylvinite Ore
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
45
image_13.jpg
Figure 11-7.    1st Ore Zone Mineral Resources, Sylvinite Ore
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
46
image_14.jpg
Figure 11-8.    5th Ore Zone Mineral Resources, Langbeinite Ore
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
47
image_15.jpg
Figure 11-9.    4th Ore Zone Mineral Resources, Langbeinite Ore
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
48
image_16.jpg
Figure 11-10.    3rd Ore Zone Mineral Resources, Langbeinite Ore
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
49
11.2Mineral Resource Estimate
The estimate of measured and indicated mineral resources effective December 31, 2024, extracted from the application of the resource cutoffs to the geologic model is listed in Table 11-4 and Table 11-5.
Table 11-4.    Mineral Resource Estimate Summary effective December 31, 2024
IPNM - Summary of Mineral Resources in millions of tons of Sylvinite in Place effective December 31, 2024, based on $450/product ton mine site
Resources
Sylvinite1
Grade
Contained
K2O
Mining Cutoff2
Processing
Recovery
(Mt)
(%K2O)
(Mt)
(ft-%K2O)
(%)
Measured Mineral Resources
288
16
45
54-64
75-85
Indicated Mineral Resources
164
14
24
54-64
75-85
Measured + Indicated Mineral Resources
452
15
69
Inferred Mineral Resources
1Sylvinite is a mixed evaporite containing NaCl and KCl.
2Solution mining resource cutoff for flooded old working is the mining extents boundary.
Mineral Resources were prepared by RESPEC, a qualified firm for the estimate and independent of Intrepid Potash, for EOY 2024.
Mineral Resources are reported exclusive of Mineral Reserves, on a 100% basis.
Mt = million tons, % = percentage, K2O = potassium oxide, ft = feet
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
50
Table 11-5.    Mineral Resource Estimate Summary effective December 31, 2024
IPNM - Summary of Mineral Resources in millions of tons of Langbeinite Mineralized Rock in Place effective December 31, 2024, based on $470/Product Ton Mine Site
Resources
Langbeinite
Mineralized
Rock
Grade
Contained
K2O
Mining Cutoff
Processing
Recovery
(Mt)
(%K2O)
(Mt)
(ft-%K2O)
(%)
Measured Mineral Resources
67
10
6
25
68
Indicated Mineral Resources
59
10
6
25
68
Measured + Indicated Mineral Resources
126
10
12
Inferred Mineral Resources
Mineral Resources were prepared by RESPEC, a qualified firm for the estimate and independent of Intrepid Potash, for EOY 2024.
Mineral Resources are reported exclusive of Mineral Reserves, on a 100% basis.
Mt = million tons, % = percentage, K2O = potassium oxide, ft = feet
11.3Discussion of Future Work
IPNM has historically and is currently producing from this property. There are no relevant technical or economic factors that need to be resolved.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
51
12.0Mineral Reserve Estimates
Mineral reserves that are to be mined using mechanical methods are estimated by the application of a detailed mine plan for the measured and indicated resources within the boundaries of the cutoff GT for reserves. The plan sets the basis for the estimation of annual production of product. The income from product sales and the operating and capital costs to mine the resource is fundamental to the cash flow used to establish economic viability.
Mineral reserves that are mined using solution mining methods are not subject to the traditional application of a cutoff grade but instead of operational limitations. An operational limit of the flood elevation establishes the cutoff between resource and reserve for this deposit.
According to 17 CFR § 229.1300 (2025), the following definitions are included for reference:
A probable mineral reserve is the economically mineable part of an indicated and, in some cases, a measured mineral resource.
A proven mineral reserve is the economically mineable part of a measured mineral resource.
12.1Key Assumptions, Parameters, and Methods
By definition, modifying factors are the factors applied to indicated and measured mineral resources and then evaluated in order to establish the economic viability of mineral reserves. These factors for IPNM include mechanical and solution mining parameters; mineral processing; oil and gas drill islands and well locations; economic cutoff GT; deleterious minerology; legal, environmental permitting and lease boundaries.
Intrepid has a long history of sales and marketing of their products. Sales are managed for all properties through the corporate office. Intrepid provided the historical demand and sales pricing through their SOEs from 2012 to 2024. Potash market is discussed in Section 16. The product sales price selected for Reserve evaluation is shown in Table 12-1.
Table 12-1.    Product Sales Price (Reserves)
ProductSale PriceFreightNet Sales Price
Cost of Goods Sold
with by-product
credit
Sylvite
$360/t
$30/t
$330/t
$203/t
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
52
Cutoff grade for brine production is listed in Table 12-2.
12.2Mineral Reserves Estimate
The mine plan boundary determines the technical feasibility of mining the reserves for zones. The mine plan layout for the solution mining is a flood elevation indicating the limit of the fluid injection boundary. The proven and probable reserves are included in Table 12-3 and are shown in Figure 12-1 for ore zone 1, respectively.
Table 12-2.    Cutoff for Solution Mined Reserves
5-Yr Basis (2025-2029)
Total production costs ($/ton of product)
$260
Net revenue from byproducts ($/ton of product)
($57)
Total Cost ($/ton of product)
$203
Potash
Price per ton less shipping ($/ton)
$330
Tons sold
726,500
Net potash sales ($)
$239,731,000
Cutoff Analysis
Breakeven tons (tonnage to cover the costs)
446,034
Net concentration of production brine (% KCl)
8.4
Cutoff net concentration (% KCl)
4.8
Cutoff net concentration (% K2O)
2.9
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
53
Table 12-3.    Mineral Reserve Estimate effective December 31, 2024
IPNM -Summary of Potash Mineral Reserves effective December 31, 2024 based on $360/Product Ton Mine Site
Reserves
In-Place KCl
In-Situ
Grade1
Product2
Brine Cutoff
Grade3
Processing Recovery
(Mt)
(%K2O)
(Mt)
(%K2O)
(%)
Proven Mineral Reserves
5.3
22.9
3.4
2.9
83
Probable Mineral Reserves
Total Mineral Reserves
5.3
22.9
3.4

1In-situ grade is the amount of K2O in the contact area of the caverns and is used to calculate the In-Place KCl.
2Product is calculated by multiplying In-Place KCl by: dissolution factor of 96%, areal recovery of 100%, geologic factor of 94.2%, plant recovery of 83%, cavern loss factor of 98%, a product purity factor of 103%, a bitterns loss factor of 88% and handling loss factor of 97%.
3Brine cutoff grade is the amount of K2O in the extracted brine necessary to cover the cash costs of production.
Mineral Reserves were prepared by RESPEC, a qualified firm for the estimate and independent of Intrepid Potash, for EOY 2024.
Mineral Reserves are reported exclusive of Mineral Resources, on a 100% basis.
Mt = million tons, % = percent, K2O = potassium oxide, ft = feet

12.3Risk Factors
Mineral reserves are an estimate from sparse data sampling points in a geologic setting that can be highly variable. The risk of material changes to the geologic interpretation is tempered by the application of the anomaly factor and the long history of mining in this deposit. Costs are subject to impact by the broader economy and can be impacted by the weather and other natural forces. A change in rules or regulations can result in unanticipated cost increases.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
54
image_17.jpg
Figure 12-1.    1st Ore Zone Mineral Reserves, Sylvinite Ore
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
55
13.0Mining Methods
The two mining methods currently in practice at IPNM are high-extraction mechanical underground room-and-pillar mining and solution mining. Mechanical mining is well suited to bedded deposits. All MOP production at IPNM comes from the HB Solar Solution Mine in the 1st and 3rd ore zones. Trio® production is from langbeinite mined using room-and-pillar mechanical mining methods at the East Mine in the 3rd, 4th, and 5th ore zones. Historically, MOP was sourced from the West Mine 5th, 7th, and 10th ore zones. Approximately 300 people are employed at the property.
The East Mine is a high-extraction, mechanical room-and-pillar mine. Potash was the primary product until mining progressed to the mixed langbeinite and potash ore in the 5th ore zone. The mixed ore was processed into two products: MOP sourced from the sylvinite portion of the mixed ore, and Trio® sourced from the langbeinite portion of the mixed ore. The East Mine plant was converted to a langbeinite-only operation in April 2016 and potash is no longer produced from the East Mine. The maximum productive capacity of the plant is 400,000 t of Trio® concentrate annually.
There are five active sections with a miner and a shuttle car loading onto a belt conveyor. Each mining section produces approximately 240,000 t of run-of-mine ore each year. The long-range production balanced with sales projections results in a long-term annual production of 1.2 Mt of ore for 250,000 t of Trio®.
Historical room-and pillar-mining operations at the HB Mine recovered about 70% of the ore, leaving approximately 30% of the ore available for secondary recovery in pillars plus what can be recovered beyond the limits of the conventional mine works. Mining at the HB Solar Solution Mine recovers potash by injecting saturated saline NaCl brine into the old mine works to create underground leach lakes. Over time, the solution becomes enriched with potash and is pumped to the surface to solar evaporation ponds. Selective solar evaporation leaves behind a potash-enriched salt that is collected using scrapers, pumped, and processed at the HB Plant. The solution mine comprises six injection wells, five extraction wells, and two monitoring wells.
The North Mine operated from 1957 to 1982 when it was idled, mainly due to low potash prices and a change in the mineralogy of the readily accessible remaining reserves which negatively impacted mineral processing. Although the mining and processing equipment has been removed, the mine shafts remain open. The compaction facility at the North Mine is where the HB potash product is granulated, stored, and shipped. The North Facility receives compactor feed from the HB Solar Solution Mine via truck and converts the compactor feed to finished granular-sized product and standard-sized product.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
56
The extents of the mine plan for this reserve estimate is shown in Figure 13-1 and included in tabular format in Table 13-1. The life of the resources and reserves at IPNM exceeds 25 years.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New
Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
57
image_18.jpg
Figure 13-1.    Underground and Solution Mining Extents
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
58
Table 13-1.    IPNM 25-Year Mine Plan
Calendar YearPlan
Year
MOP
RSTUVW
Brine Extracted (Gallons)
Brine Grade
(%K2O)
K2O
(Tons)
Product KCl
(Tons)
Handling Losses (Tons)
MOP
(Tons)
2025Year 1534,816,0004.83132,400142,0004,300137,700
2026Year 2533,808,0004.97136,100146,0004,400141,600
2027Year 3532,584,0005.09139,000149,1004,500144,600
2028Year 4533,376,0005.30145,000155,6004,700150,900
2029Year 5535,392,0005.30145,500156,1004,700151,400
2030Year 6536,688,0005.32146,300157,0004,700152,300
2031Year 7534,600,0005.21143,000153,4004,600148,800
2032Year 8535,032,0005.31145,600156,3004,700151,600
2033Year 9534,456,0005.18142,000152,3004,600147,700
2034Year 10536,714,0005.09140,000150,2004,500145,700
2035Year 11537,434,0005.00137,900147,9004,400143,500
2036Year 12538,154,0004.92135,700145,6004,400141,200
2037Year 13537,434,0004.83133,200142,9004,300138,600
2038Year 14536,714,0004.75130,700140,2004,200136,000
2039Year 15535,994,0004.66128,200137,5004,100133,400
2040Year 16537,434,0004.58126,300135,4004,100131,300
2041Year 17537,434,0004.50123,900133,0004,000129,000
2042Year 18537,434,0004.41121,600130,5003,900126,600
2043Year 19536,996,0004.35119,800128,5003,900124,600
2044Year 20535,002,0004.48122,800131,8004,000127,800
2045Year 21536,608,0004.42121,600130,4003,900126,500
2046Year 22533,834,4004.34118,800127,4003,800123,600
2047Year 23534,242,4004.26116,600125,1003,800121,300
2048Year 24534,526,8004.16114,000122,3003,700118,600
2049Year 25536,442,0004.07112,100120,2003,600116,600
Extraction brine density - 1.23
KCl plant recovery - 83%
Product purity - 97%
Pond recovery – 90%
Pure KCl equates to 63.17% K2O by mass
Handling losses – 3%; Bitterns Losses – 12%
T = (R*(S/100)*1.23*8.34/2000)
U = (T/0.6317)*(0.83*0.90*0.88)/0.97
V = U*0.03
W = U-V
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
59
14.0Processing and Recovery Methods
All IPNM ores are processed on-site. There are two active processing plants: the East Plant and HB Plant. The West Plant was idled in 2016. The North Compactor was completed in early 2013 and is used to granulate, store, and ship product from the HB Plant.
Declining ore grades coupled with market conditions have resulted in IPNM shuttering much of it sylvite capacity in the previous years. Historically, the East Plant produced white sylvite by evaporative crystallization and langbeinite (K2SO4·2MgSO4) by dense media separation of the coarse fraction (+20 mesh) of ore mined from the 3rd, 4th, and 5th ore zones. In 2016, sylvite production permanently ceased and the East Plant became a langbeinite-only producer. Langbeinite recoveries have since improved to as high as 72%.
14.1HB Processing Facility
In 2012, IPNM commenced filling the HB solar evaporation ponds (Figure 14-1). The extraction brine sourced from the mined-out areas of the 1st ore zones of the former underground workings of portions of HB Eddy, HB South, HB North, and the HB Crescent, collectively referred to as the HB Mine. The brine is collected and crystallized in 18 solar evaporation ponds. The HB flotation mill processes the harvested potash and salts from the solar evaporation ponds.
Conditioned injectate, made with NaCl-saturated brine, is injected to create underground leach lakes in the lower portions of abandoned subsurface mine workings. The solution mine comprises six injection wells, five extraction wells, and two monitoring/extraction wells.
The simplified process flow diagram (PFD) is shown in Figure 14-2. NaCl-saturated brine is injected into the mines producing about 535 million gallons of brine at an estimated grade of 7.6% KCl and 21% NaCl. The evaporation ponds concentrate and crystallize the brine to produce about 700,000 - 900,000 tpy of crystal at 12–14% K2O (19–22% KCl) with the remainder being largely halite. The crystals are mechanically harvested, re-pulped in double-saturated brine and pumped to the HB processing facility.
The crystals are statically screened with the oversize processed through a crusher and recycled. The screened crystal is combined with reagents and fed to flotation cells. The rougher flotation concentrate is forwarded to the agitated leach tank.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
60
The leached solids are at a product grade of >95.5% KCl with a range of 60.5% to 62% K2O. The solids are dried, sampled, and conveyed to storage bins prior to transfer to the North Plant for compaction and shipment to sales.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
61
image_19.jpg
Figure 14-1.    HB Evaporation Ponds
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
62
image_20.jpg
Figure 14-2.    HB Process Flow Diagram
RESPEC


2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico Prepared for Intrepid Potash, Inc.
February 11, 2025
63
14.2Langbeinite Processing Facility
The East Plant was modified in 2003–2004 to allow dual processing to recover the K2O value from both the sylvite and langbeinite fractions of the ore. In 2016, the sylvite circuit was permanently closed. Langbeinite, marketed as the fertilizer Trio® brand of products, is recovered using dense media separation and a fine langbeinite recovery circuit. A simplified process flow diagram is included as Figure 14-3.
Currently about 1.2 million tpy (Mtpy) of ore is processed at a rate of 300 tph. The ore is crushed, screened, pulped, and rescreened. Coarse material is forwarded to the dense media separation (DMS) circuit. The DMS concentrate is water leached, debrined, and dried. The coarse product is separated into the three Trio® products. Fine material from the screening process is recovered using gravity separation, leaching, debrining, and drying. Fine material is upgraded to premium product using pelletization.
14.3North Compaction Plant
The North Plant provides classification, compaction, quality control, and load-out services for production from the HB Solar Solution Mine. A simplified flow diagram for the North Compaction Plant is presented in Figure 14-4.
Belly dump trucks unload HB product into a dump pocket. The material is then sent to surge bins. The product is screened, preheated, weighed, and sent to a compactor feed bin.
Material is screened to produce standard product or fed to the roll compactor, and resulting flakes are further reduced in size with the subsequent flake breaker and crusher to produce granular product. Product is then screened and sent to the curing dryer and screened once again before being sent to final product storage.
The product is shipped to market in trucks or rail cars.
RESPEC


2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico Prepared for Intrepid Potash, Inc.
February 11, 2025
64
14.4Tailings Facilities
There are three tailings storage facilities (TSF) at IPNM: East, West, and North.
The East TSF is shown in Figure 14-5. The New Mexico State Engineer in the Dam Safety Bureau required IPNM to evaluate as-built conditions and stability of the East TSF due to the lack of original construction calculations and drawings. IPNM completed the required geotechnical evaluation assessment in 2018. Based on that evaluation, a conceptual improvement plan was developed to address identified freeboard, spillway capacity, and embankment stability issues. IPNM is working with the New Mexico State Engineer to prioritize, approve and implement the plan. Full implementation will be phased over several years.
The West TSF, in Figure 14-6, is permitted for tailings disposal from the West Plant. Unsaturated brine is pumped onto the tailings where it is contacted with NaCl to produce a saturated brine for injection. The saturated brine flows to ponds below the tailings pile that manage brine inventory for injection into the HB Mine. The West TSF also stores tails from the West Plant, which is on care and maintenance. Total tailings volume is being reduced by the brine saturation process.
The North TSF in Figure 14-7 is only used to handle excess brine/water and has ample capacity.
RESPEC


2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico Prepared for Intrepid Potash, Inc.
February 11, 2025
65
image_21.jpg
Figure 14-3.    East Plant Process Simplified Flow Diagram
RESPEC


2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico Prepared for Intrepid Potash, Inc.
February 11, 2025
66
image_22.jpg
Figure 14-4.    North Plant Simplified Process Flow Diagram
RESPEC


2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico Prepared for Intrepid Potash, Inc.
February 11, 2025
67
image_23.jpg
Figure 14-5.    East Tailings Storage Facility
RESPEC


2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico Prepared for Intrepid Potash, Inc.
February 11, 2025
68
image_24.jpg
Figure 14-6.    West Tailings Storage Facility (HB Brine Recirculation)
RESPEC


2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico Prepared for Intrepid Potash, Inc.
February 11, 2025
69
image_25.jpg
Figure 14-7.    North Tailings Storage Facility (inactive)
RESPEC


2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico Prepared for Intrepid Potash, Inc.
February 11, 2025
70
15.0Infrastructure
The IPNM mines have a robust infrastructure in place. IPNM has adequate water rights at each of the mine properties. All of the mining operations are accessible by paved state or county highways and are accessible by rail. All of the operations obtain electric power from local utilities fed to recently upgraded substations. The infrastructure layout is shown in Figure 15-1.
RESPEC


2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico Prepared for Intrepid Potash, Inc.
February 11, 2025
71
image_26.jpg
Figure 15-1.    Layout of the Infrastructure
RESPEC


2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico Prepared for Intrepid Potash, Inc.
February 11, 2025
72
16.0Market Studies
Price projections are based on a combination of historic pricing trends and expectations of future potash consumption and production. Intrepid uses a variety of sources including, but not limited to, industry reports, company announcements, third-party market studies, and internal estimates when establishing a forecasted price. Intrepid compares its historic realized pricing to widely available benchmark prices, specifically the Midwest Warehouse potash price and the U.S. New Orleans Louisiana (“NOLA”) Barge Market potash price, to establish a historic price differential which it uses when analyzing future price expectations.
RESPEC


2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico Prepared for Intrepid Potash, Inc.
February 11, 2025
73
17.0Environmental Studies, Permitting, and Plans
IPNM holds numerous environmental, mining, safety, and other permits and governmental approvals authorizing the operations at each of the facilities. Operations are subject to permits for, among other things, extraction of salt and brine, discharges of process materials and waste to air and surface water, and injection of brine. IPNM is obligated to reclaim and remediate disturbed lands when they cease operations.
17.1Environmental Studies
IPNM has all necessary operating permits for the current operations and is in production, both underground and solution mining, and through the permit reporting maintains environmental compliance. Environmental studies are conducted for major project expansions. The most recent Environmental Assessment (EA) was completed in 2024 for the construction of new injection piping for the HB In-situ Solution mine. The work referenced the initial EIS for the HB In-Situ Solar Solution Mining Project EIS (DOI 2012).
17.2Waste and Tailings Disposal, Site Monitoring, and Water Management During and After Mine Closure
The property has three tailings’ impoundments, one of which is in current operation, that were described in Section 14. Tailings brine water is recycled for use in processing plants and solution wells. At closure, the tailings piles will dry and form a very hard, stable crust. No recontouring or revegetation of tailings piles are anticipated because the hard crust will provide adequate slope stability. The perimeter dikes will be stabilized for long-term integrity. Precipitation on the pile will dissolve some of the salt as it moves down into the brine pond, but is not anticipated to be saturated when it exits the pile. The tailings areas will be fenced off to minimize public access. Intrepid is in the process of reviewing the closure plan with the Bureau of Land Management and the New Mexico Environment Department Ground Water Quality Bureau.
17.3Permitting Status and Reclamation Bonds
The permitting status of each of the major permits is listed in Table 17-1. Bonds for mine closure and groundwater discharge are currently at a value of $4.057 million.
IPNM has timely applied for new permits and permit renewals necessary for continued operations, which are under review by regulatory agencies. Upon issuance, some of these permits may require us to increase our reclamation bonds.
17.4Agreements with Local Individuals
There are no specific agreements with local individuals or groups.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
74
Table 17-1.    Permitting Status
Common Name
Issuing Agency
Permit ID
Effective Date
Expiration Date
Bond Value
Note
Air PermitNew Mexico Environment Department (NMED) Air Quality Bureau
Title V Air Operating Permit
P009-R3M1 (East Plant)
24-Apr-204-Apr-25NoneTitle V operating permits have a 5-year permit term; a renewal application was timely filed. The application was ruled complete and is undergoing technical review by NMED.
Air PermitNMED Air Quality Bureau
Title V Air Operating Permit
P261-R1 (North Compaction Plant [NSR 0321-M8], West Floatation Plant [NSR 0421-M5, 0421-M5R1], HB Plant [NSR 4332-M21R3])
20-Dec-2420-Dec-29None
Groundwater Discharge PermitNew Mexico Environment: Department Ground Water Bureau (Water Quality Control Commission Regulations)
Discharge Permit
No.: DP-1681
10-Jul-1510-Jul-20$3,349,000Application for renewal submitted January 2020. Additional modification applications have been filed since the 2020 renewal application. MMED is reviewing the modification and has indicated they will issue modifications with the permit renewal upon completions of the review. Existing permit remains in effect until agency issues the renewed permit. Current bond amount is shown. Intrepid provided an updated Mine Reclamation and Closure Plan Cost Estimate to NMED GWB in June 2021 for the amount of $4.475 million. Awaiting NMED acceptance before updating bond. Bond currently held by NMED and covered in joint bonding arrangement with the Bureau of Land Management.
West/HB Plant Liquid Waste PermitNMED Health BureauPermit No. 00860925-Sep-18Good for the life of the system.
None
HB reclaim
West/HB Plant Liquid Waste PermitsNMED Health BureauPermit No. 004446, 004447, 004448, 004449, 004450, 004451, 004452, 004453 9-Jan-18Good for the life of the system.NoneVarious West/HB liquid waste permits
East Plant Liquid Waste PermitsNMED Health BureauPermit No. 004437, 004438, 004439, 004440, 004441, 004442, 004444, 0044459-Jan-18Good for the life of the system.NoneVarious East Plant liquid waste permits.
East Plant Liquid Waste PermitNMED Health BureauPermit No. 00443914-Jun-19Good for the life of the system.NoneEast Loadout tank 3A
East Plant Liquid Waste PermitNMED Health BureauPermit No. 0093404-Sep-19Good for the life of the system.
None
East Leachfield LF1A
North Plant Liquid Waste PermitsNMED Health BureauPermit No. 004454, 004455, 004457, 0044589-Jan-18Good for the life of the system.NoneVarious North Plant liquid waste permits
Radioactive DevicesNMED Radiation Control BureauLicense Number GA417-1722-Oct-2430-Nov-24
None
An extension of 120 days has been granted until the license renewal is completed by NMED RCB
Waterfowl Hazing Plan and ReportingBureau of Land Management – Carlsbad Field OfficeHB Project Solar Evaporation Ponds, Stepped Avian Monitoring and Mitigation Plan1-Jan-12None
None
Intrepid New Mexico submits quarterly reports on its activities
Brine Effects on State Trust Lands
New Mexico State Land Office
Remediation of Brine Effects on State Trust Lands, Lease Numbers bl-0559 and hp-000511-April-18N/A$250,000
Remediation of brine release on State Trust Lands
Fresh Water Easementsnew Mexico State Land Office, Oil, Gas and Minerals DivisionDamage bond for freshwater easements WR-81329-August-23N/A$43,000
CAM PlanNMED Air Quality BureauWest North and HB Compliance Assurance Monitoring Plan required by Title V Air Operating Permit P261-R1Same as Title V permitSame as Title V permitNone
CAM PlanNMED Air Quality BureauEast Compliance Assurance Monitoring Plan required by Title V Air Operating Permit P009-R3M1Same as Title V permitSame as Title V permitNone
Federal Explosives LicenseBureau of Alcohol, Tobacco, and FirearmsPermit #5-NM-015-33-9J-00293

1-Sep-25
None
License covers shell crackers for shotguns. Used to control or scare away waterfowl from the ponds at all sites. This license is for all of Intrepid New Mexico.
Mine Operations and Closure PlansBureau of Land Management – Carlsbad Field OfficeHB Solar Mine Operations and Closure Plan31-May-2131-May-31$415,000Intrepid NM provided an updated Mine Reclamation and Closure Plan and Closure Cost Estimate for HB to NMED GWB and concurrently with the BLM in June 2021 for the amount of $4.475 million. Awaiting NMED and BLM acceptance before updating the bond.
Mine Operations and Closure PlansBureau of Land Management – Carlsbad Field Office
East Mine Operations and Closure Plan
North Mine Operations and Closure Plan
West Mine Operations and Closure Plan
1977
1977
1977
Intrepid submitted draft Operations and Closure Plans to BLM. Those applications have not been approved and earlier plans remain in effect. Intrepid is working to provide revised Operations and Closure Plans to the BLM for these mines.
Well PermitsNM Office of State EngineerInjection, Extraction, and Rustler Wells
Various
None
None
Permit status is undetermined at this time.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
75
17.5Closure Plans
Closure plans include the repurposing, demolition, and removal of surface infrastructure and safely securing shafts for public safety. Mine operations and closure plans are periodically filed with the BLM. The proposed methods of abandonment are designed to protect unmined recoverable reserves and other resources. While each mine area has specific detailed closure requirements, the major closure steps include closure of shafts and relief wells, tailings stabilization, asbestos removal, building demolition, reclamation of building footprints; reclamation of other areas, disposal of any contaminated soils, reclamation of landfills, reclamation of roads, and remediation of Recognized Environmental Concerns (REC).
Upon completion of solution mining operations at the HB Mine, all structures, wells, pipelines, and ancillary equipment located on Federal, State, and Intrepid fee land will be abandoned, demolished, razed, and hauled to an appropriately permitted local landfill for proper disposal.
17.6Adequacy of Current Plans and Compliance
It is the QP’s opinion that the current plans are adequate to address any issues related to environmental compliance, permitting, and local individuals or groups.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
76
18.0Capital and Operating Costs
18.1Capital Cost Estimate
Capital items necessary to complete the mine plan include the pipeline and injection/extraction wells for the AMAX extension of the HB Solar Solution Mine. The budgeted mine reclamation capital costs are included for 2025 through 2028. Intrepid has provided the mining costs history and sales data since 2007 and budgeted capital costs. With the West Mine taken offline, many of the capital items were recovered from the West Mine for use in the East Mine, reducing the amount of new capital required to sustain East Mine operations. The remaining reclamation cost is included in year 2049 as $45.6 million. Any necessary reclamation work beyond Year 25 is allocated to Year 25 to establish contracting. The sustaining capital is outlined in the budget and includes major equipment replacement. Capital costs are shown in Table 18-1.
18.2Operating Cost Estimate
Intrepid provided the mining costs history and sales data since 2007. The cash operating cost including warehouse, handling, and royalty is provided in Table 18-1. These costs are subject to vary with changes in production. Cash production costs do not include interest, depreciation, depletion, or income taxes. A by-product credit of $57 per ton is applicable.
18.3Accuracy Discussion
Because the operating costs are based on historical actual expenses, the cost estimates are at an accuracy of at least +/- 15%.
Capital costs are based on actual bids or recent purchases of capital items plus an inflation factor. The capital costs estimates are at an accuracy of at least +/- 25% and contingency levels are less than 25%.
Reclamation costs are based on the most recent reclamation bond update and asset retirement obligations and are estimated to be accurate to at least +/- 15%.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
77
Table 18-1.    Major Remediation and Capital Cost Estimate
Year Number
Year
Remediation
Sustaining
Capital
Capital
12025$200,000$6,800,000$7,300,000
22026$900,000$5,500,000$2,600,000
32027$1,325,000$5,700,000$7,000,000
42028$2,921,500$5,700,000
52029$5,700,000
62030$5,700,000
72031$5,700,000
82032$5,700,000
92033$5,700,000
102034$5,700,000
112035$5,700,000
122036$5,700,000
132037$5,700,000
142038$5,700,000
152039$5,700,000
162040$5,700,000
172041$5,700,000
182042$5,700,000
192043$5,700,000
202044$5,700,000
212045$5,700,000
222046$5,700,000
232047$5,700,000
242048$5,700,000
252049$45,595,200$5,700,000
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
78

Table 18-2.    Unit Mining Cost 2025-2029
Cost Category
Cost ($/Product Ton)
Cost Distribution
Labor
122 47 %
Maintenance Supplies
24 %
Operating Supplies Including Reagents
23 %
Natural Gas, Electricity and Fuel
15 %
Leases, Property Tax, Insurance, etc.
26 10 %
Subtotal
211 81 %
Warehouse
17 %
Royalties
17 %
Environmental Remediation and Other
15 %
Cost of Goods Sold
260 100 %
By-product Credit
57 

Cost of Goods Sold with By-product credit
203 

19.0Economic Analysis
To evaluate the viability of mining the IPNM mines’ reserves, an economic analysis was conducted. Annual revenue and production cost schedules were used to build a projected cash flow to accompany the mine plan. The costs and sales price parameters were assumed to be constant US dollars.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
79
19.1Key Assumptions, Parameters, and Methods
The property has a long history of operation at this location. The assumption list for the economic analysis is shown in Table 19-1.
Table 19-1.    Economic Analysis Assumptions
Parameter
Assumption
Potash Sale Price (mine site)
$360/t
Shipping Potash
$30/t
Average Potash Production Target (25-yr avg.)
136,500 tpy
Interest Rate
0–12% APR
Income Taxes (State and Federal)
26%

19.2Economic Analysis
For a property in operation, the economic viability may be implied. The cash flow was developed using the mine plan and is listed in Table 19-2. The after-tax cash flow is listed in Table 19-3. The cashflows are shown graphically in Figures 19-1 and 19-2 for pre- and after-tax, respectively. Annual ore production, ore grade and tons of product produced used in both the pre-tax and after-tax cash flow analyses are taken from the annual life of mine production schedule as shown in Section 13: Mining Methods included in this Technical Report Summary. The annual life of mine production schedule provides the calculation of product tons resulting from tons of ore mined and the associated grade of ore mined. The East Mine has a remediation cost of $17.6 M not included in the HB Mine reserves cash flow.
19.3Sensitivity Analysis
NPV sensitivity analyses were run using variants in commodity price and operating costs for the pre-tax cash flow. The results of the sensitivity analysis are shown in Table 19-4 and graphically in Figure 19-3.
19.4Discussion
Economic analysis using the price and cost assumptions shows the operation is expected to continue to be profitable over the reserve life.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
80
Table 19-2.    Estimated Pre-Tax Cash Flow
Five-Year Periods
Item
2025 - 2029
2030 - 2034
2035 - 2039
2040 - 2044
2045 - 2049
Tons of product production
726,500 746,100 692,800 639,400 606,700 






Potash Sales price per ton mine site
$360 $360 $360 $360 $360 
Transportation cost per ton
$30 $30 $30 $30 $30 
Net sales price per ton
$330 $330 $330 $330 $330 





Period net revenue
$239,731,000 $246,202,000 $228,608,000 $210,989,000 $200,222,000 






Cost per product ton, excluding depreciation
$211 $206 $219 $234 $245 
Warehouse & Handling per product ton
$17 $17 $17 $17 $17 
Royalties per product ton
$17 $17 $17 $17 $17 
Environmental remediation and other non-inventory costs
$15 $15 $16 $17 $18 
Less byproduct revenues
$(57)$(56)$(60)$(65)$(68)
Operating costs per production ton, excluding depreciation
$203 $199 $209 $220 $228 






Less period operating costs, excluding depreciation
$(147,191,000)$(148,601,000)$(144,770,000)$(140,930,000)$(138,584,000)
Less period capital
$(46,300,000)$(28,500,000)$(28,500,000)$(28,500,000)$(28,500,000)
Less period remediation
$(5,347,000)$(45,595,000)
Estimated period pre-tax cashflow
$40,893,000 $69,101,000 $55,338,000 $41,559,000 $(12,457,000)
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
81
Table 19-3.    Estimated After-Tax Cash Flow
Five-Year Periods
Item
2025 - 2029
2030 - 2034
2035 - 2039
2040 - 2044
2045 - 2049
Tons of product production
726,500 746,100 692,800 639,400 606,700 
Potash Sales price per ton mine site
$360 $360 $360 $360 $360 
Transportation cost per ton
$30 $30 $30 $30 $30 
Net sales price per ton
$330 $330 $330 $330 $330 
Period net revenue
$239,731,000 $246,202,000 $228,608,000 $210,989,000 $200,222,000 
Cost per product ton, excluding depreciation
$211 $206 $219 $234 $245 
Warehouse & Handling per product ton
$17 $17 $17 $17 $17 
Royalties per product ton
$17 $17 $17 $17 $17 
Environmental remediation and other non-inventory costs
$15 $15 $16 $17 $18 
Depreciation and Depletion
$106 $103 $111 $120 $127 
Less byproduct revenues
$(57)$(56)$(60)$(65)$(68)
Total Operating Costs
$309 $302 $320 $341 $355 
Total operating costs
$(224,121,000)$(225,531,000)$(221,700,000)$(217,860,000)$(215,514,000)
Estimated Pre-tax Income
$15,610,000 $20,671,000 $6,908,000 $(6,871,000)$(15,292,000)
Estimated Taxes at 26%
$(4,059,000)$(5,374,000)$(1,796,000)$1,786,000 $3,976,000 
Estimated After Tax Income
$11,551,000 $15,297,000 $5,112,000 $(5,085,000)$(11,316,000)
Add back Depreciation and Depletion
$76,930,000 $76,930,000 $76,930,000 $76,930,000 $76,930,000 
Less Capital
$(46,300,000)$(28,500,000)$(28,500,000)$(28,500,000)$(28,500,000)
Less Remediation
$(5,347,000)$— $— $— $(45,595,000)
After-Tax Cash Flow
$36,834,000 $63,727,000 $53,542,000 $43,345,000 $(8,481,000)
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
82
chart-57f6f74007ab433bacb.jpg
Figure 19-1.    Estimated Pre-Tax Cash Flow
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
83
chart-aeecf9031af94886b04.jpg
Figure 19-2.    Estimated After-Tax Cash Flow
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
84
Table 19-4.    NPV Pre-Tax Estimate
Interest Rate
NPV
(% APR)
($Million)
0
$194
5
$126
8
$99
10
$85
12
$74
Table 19-5.    NPV After-Tax Estimate
Interest Rate
NPV
(% APR)
($Million)
0
$189
5
$120
8
$93
10
$80
12
$69
chart-9e3758fc285047d5b60.jpg
Figure 19-3.    Pre-Tax NPV Sensitivities (APR 8%)
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
85
chart-7135239cd8544108a53.jpg
Figure 19-4.    After-Tax NPV Sensitivities (APR 8%)
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
86
20.0Adjacent Properties
In preparing the report, the QP indicated that the IPNM operations and The Mosaic Company operations, although mining in the same geologic deposit, each has its own plants and infrastructure and are entirely independent of each other. It is the qualified person’s opinion that The Mosaic Company operations are not material in relation to IPNM.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
87
21.0Other Relevant Data and Information
The Mine Safety and Health Administration (MSHA) is the governing agency for IPNM’s underground mines and related surface facilities in New Mexico. As required, these operations are regularly inspected by MSHA personnel. The HB Plant is governed by the Occupational Safety and Health Administration (OSHA).
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
88
22.0Interpretation and Conclusions
RESPEC’s QP review and resource and reserve estimations were performed to obtain a reasonable assurance of the estimates from the data provided by Intrepid and IPNM. The QP believes the findings are reasonable and realistic and have been developed using accepted engineering practices.
As with all geologic estimations, there is a level of risk and uncertainty because of sparse data. These estimates are considered reliable based on the historical success of mining operations recovering langbeinite and potash from this deposit. There is more uncertainty in future mining of the ore zones that have not been historically mined.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
89
23.0Recommendations
The QP recommends that IPNM continue planning for the challenges in solution mining with the presence of low levels of carnallite and plan for the expansion pipeline and wells for the AMAX mine. The property is in operation, and no additional work beyond current confirmation drilling is recommended.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
90
24.0References
Agapito (2007), “Determination of Estimated Proven and Probable Reserves at Intrepid Potash—New Mexico, LLC,” report prepared for Intrepid Potash, December 12, 19 pp.
Agapito (2008), “Determination of Estimated Proven and Probable Reserves for the Planned HB Solution Mine for Intrepid Mining, LLC,” report prepared for Intrepid Potash, March 14, 25 pp.
Agapito (2009), “Reserve Update for the Carlsbad HB, East and West Mines for Intrepid Potash, Inc.,” report prepared for Intrepid Potash, Inc., February 27, 29 pp.
Agapito (2010), “Determination of Estimated Proven and Probable Reserves at Intrepid Potash—New Mexico, LLC,” report prepared for Intrepid Potash, Inc., February 4, 34 pp.
Agapito (2011), “Determination of Estimated Proven and Probable Reserves at Intrepid Potash—New Mexico, LLC,” report prepared for Intrepid Potash, Inc., February 1, 34 pp.
Agapito (2012), “Determination of Estimated Proven and Probable Reserves at Intrepid Potash—New Mexico, LLC,” report prepared for Intrepid Potash, Inc., January 27, 32 pp.
Agapito (2013), “Determination of Estimated Proven and Probable Reserves at Intrepid Potash—New Mexico, LLC,” report prepared for Intrepid Potash, Inc., February 11, 38 pp.
Agapito (2014), “Determination of Estimated Proven and Probable Reserves at Intrepid Potash—New Mexico, LLC,” report prepared for Intrepid Potash, Inc., January 28, 42 pp.
Agapito (2015), “Determination of Estimated Proven and Probable Reserves at Intrepid Potash—New Mexico, LLC,” report prepared for Intrepid Potash, Inc., January 22, 43 pp.
Agapito (2016), “End-of-Year 2015 Intrepid Potash, Inc. Reserve for the Carlsbad HB Solar Solution, East and West Mines Intrepid Potash—New Mexico, LLC,” report prepared for Intrepid Potash, Inc., January 25, 35 pp.
Agapito (2017), “End-of-Year 2016 Intrepid Potash, Inc. Reserve for the Carlsbad HB Solar Solution, East and West Mines Intrepid Potash—New Mexico, LLC,” report prepared for Intrepid Potash, Inc., February 1, 44 pp.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
91
Agapito (2018), “End-of-Year 2017 Intrepid Potash, Inc. Reserve for the Carlsbad HB Solar Solution, East and West Mines,” report prepared for Intrepid Potash, Inc., January 21, 43 pp.
Agapito (2019), “2018 Determination of Estimated Proven and Probable Reserves for the Carlsbad HB Solar Solution, East and West Mines,” report prepared for Intrepid Potash Inc., February 14, 36 pp,
Agapito (2020), “2019 Determination of Estimated Proven and Probable Reserves for the Carlsbad HB Solar Solution, East and West Mines,” report prepared for Intrepid Potash Inc., January 24, 2020, 67 pp.
Agapito (2021), “Determination of Estimated Proven and Probable Reserves for the Carlsbad HB Solar Solution, East and West Mines,” report prepared for Intrepid Potash Inc., January 24, 2021, 67 pp.
Agapito (2022), “2021 Estimated Resources and Reserves at Intrepid Potash-New Mexico” prepared for Intrepid Potash, February 18, https://www.sec.gov/Archives/edgar/data/1421461/000142146122000011/ipi12312021exhibit961a.htm
Backman, G. O. (1984), “Regional Geology of Ochoan Evaporites, Northern Part of Delaware Basin,” Circular 184, Socorro, NM: New Mexico Bureau of Mines and Mineral Resources, 25 pp.
Barker, J. M. and G. S. Austin (1993), “Economic Geology of the Carlsbad Potash District, New Mexico,” Guidebook 44th Field Conference, Carlsbad Region, New Mexico and West Texas, New Mexico Geological Society, pp. 283–291.
Barker, J and G. Austin (1999), “Overview of the Carlsbad potash district, New Mexico,” New Mexico Bureau of Mines & Mineral Resources, Circular 207, pp. 7–16.
Bruhn, H. H. and E. H. Miller (1954), “Potash Mining Methods,” Mining Engineering, June, pp. 608–612.
Carlson Software (2020), “Carlson Geology,” available at <https://www.carlsonsw.com/product/ carlson-geology>.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
92
Cheeseman, R. J. (1978), "Geology and Oil/Potash Resources of Delaware Basin, Eddy and Lea Counties, New Mexico," Circular 159, Socorro, NM: New Mexico Bureau of Mines and Mineral Resources (NMBMMR), pp. 7–14.
CFR (2025), “Disclosure by Registrants Engaged in Mining Operations,” § 229.1300, last amended January 24, available at < ecfr.gov/current/title-17/chapter-II/part-229/subpart-229.1300/section-229.1300>.
Federal Register (2012), “Oil, Gas, and Potash Leasing and Development Within the Designated Potash Area of Eddy and Lea Counties, NM,” available at <https://www.federalregister. gov/documents/2012/12/04/2012-29393/oil-gas-and-potash-leasing-and-development- within-the-designated-potash-area-of-eddy-and-lea>, 77 FR 71814, December 4, 5 pp.
Federal Register (1986), “Appendix A, Guidance for Managing the Secretary’s Potash Area,” available at <https://www.nm.blm.gov/cfo/HBIS/docs/o_Appendix_A.pdf>, 51 FR 39425, October 28, 48 pp.
Griswold, G. G. (1982), “Geologic Overview of the Carlsbad Potash-Mining District,” Circular 182, Socorro, NM: New Mexico Bureau of Mines and Mineral Resources, pp. 17–22.
Gunn, R. C. M. and J. M. Hills (1978), “Geology of the Tenth Potash Ore Zone: Permian Salado Formation, Carlsbad District, New Mexico,” Open File Report 146, Socorro, NM: New Mexico Bureau of Mines and Mineral Resources (NMBMMR), 43 pp.
Haworth, R. G. (1949), “Mining Potash Ores in Carlsbad Area,” American Institute of Mining and Metallurgical Engineers, Mining Transactions, 184:381–382.
Herne, V. and T. McGuire (2001), “Mississippi Potash, Inc.’s Underground Operations,” Underground Mining Methods, (Hustrulid, W. A. and R. L. Bullock, eds.), Littleton, CO: SME, pp. 137–141.
Jones, C. L., C. G. Bowles and A. E. Disbrow (2001), “Generalized Columnar Section and Radioactivity Log, Carlsbad District,” Open File Map, USGS, 1 sheet.
Kirby, R. E. (1974), “Mine Modernization at AMAX’s Carlsbad Property,” Preprint 74-AU-302, Salt Lake City: Society of Mining Engineers of AIME, 22 pp.
Kroenlein, G. A., (1939), "Salt, Potash and Anhydrite in Castile Formation of Southeast New Mexico," Bull. American Association of Petroleum Geologists, 25(11):1682–1693.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
93
Lewis, J. P. (2006), “Evaluation of Potash Content in the Conoco Phillips Peakview II Well,” Eddy County, New Mexico: Intrepid Mining LLC, Denver, Colorado, 10 pp.
Lewis, J. P. (2007), “Carlsbad Xsec.jpg,” retrieved from FTP Site, accessed November 15.
Linn and Adams (1966),"Barren Halite Zones in Potash Deposits Carlsbad, New Mexico," Second Symposium on Salt, Cleveland, OH: Northern Ohio Geological Society, Inc., pp. 59–69.
Lowenstein, T. K. (1988), "Origin of Depositional Cycles in a Permian 'Saline Giant': The Salado (McNutt Zone) Evaporites of New Mexico and Texas," 100:592–608.
Nelson, Philip H. (2007), “Evaluation of Potash Grade with Gamma-ray Logs,” USGS OFR 2007-1292, 14 pp.
Pierce, C. A. (1936), “Drilling and Blasting Practice of the United States Potash Company at Carlsbad, New Mexico,” Technical Publication No. 672, New York: American Institute of Mining and Metallurgical Engineers, Inc., 10 pp.
RESPEC (2023) “Technical Report Summary, REVISED 2021 Estimated Resources and Reserves at Intrepid Potash-New Mexico” prepared for Intrepid Potash, November 27, 111 pp.
RESPEC (2024)    “Technical Report Summary 2023 Estimated Resources and Reserves at Intrepid Potash-New Mexico” prepared for Intrepid Potash, February 14, 2024, 84 pp.
Schaller, W. T. and E. P. Henderson (1932), “Mineralogy of Drill Cores from the Potash Field of New Mexico and Texas,” Geological Survey Bull. 833, Washington, DC: US Government Printing Office, 124 pp.
SEC (2008), “Industry Guides,” OMB Number 3235-0069, 33 pp.
SEC (2018), 17 CFR parts 229, 230, 239, and 249; Release Nos. 33-10570, 34-84509; File No. S7-10-16; RIN 3235-AL81; Modernization of Property Disclosures for Mining Registrants, October 31, 453 pp.
Simmons, P. (2013), "The Carlsbad Potash Basin, Carlsbad, New Mexico," The Mineralogical Record, 44:13–49.
SME (2017), “A Guide for Reporting Exploration Information, Minerals Resources, and Mineral Reserves,” July 17, 97 pp.
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
94
State of New Mexico Energy, Mineral, and Natural Resources Department (2024), New Mexico Oil and Gas Division Case No. 23655, Order No. R-111-Q.
Swales, J. M. (1966)” Shaft Sinking and Underground Development at the Kermac Potash Mine,” Mining Engineering, December, pp. 69–72.
US Climate Data (2020), https://www.usclimatedata.com/climate/carlsbad/new-mexico/united-states/usnm0046 (accessed December 11, 2019).
United States Department of Interior (2012), “HB In-Situ Solution Mine Project Final Environmental Impact Statement,” DOI-BLM-NM-P020-2011-498-EIS.
Vine, J. D. (1963), “Surface Geology of the Nash Draw Quadrangle Eddy County New Mexico,” Geological Survey Bulletin 1141-B, Washington, DC; US Government Printing Office, 46 pp.
Warren, J. (2018), “Polyhalite: Geology of an Alternate Low-Chloride Potash Fertilizer,” Salty Matters, July 31, https://www.saltworkconsultants.com/downloads/39%20 Poly halite.pdf (accessed October 2, 2019).
RESPEC

2024 Estimated Resources and Reserves at Intrepid Potash-New Mexico
Prepared for Intrepid Potash, Inc.
February 11, 2025
95
25.0Reliance on Information
The QP relied on lease holdings and permitting status provided by Intrepid and IPNM for this reserve evaluation.
RESPEC