EX-99.2 3 tm2629986d1_ex99-2.htm EXHIBIT 99.2

 

Exhibit 99.2

 

Duke Energy Progress, LLC

Updates Regarding the 2025 Rate Case Filings in North Carolina

(Docket E-2 Sub 1380)

 

Background:

 

·On November 20, 2025, Duke Energy Progress (“DEP” or the “Company”) filed a rate case with the North Carolina Utilities Commission (“NCUC”) seeking approval for increases in retail revenues. The filing included requests for Performance Based Regulation (“PBR”) mechanisms, featuring a 2-year Multi-Year Rate Plan (“MYRP”) as well as residential decoupling, performance incentive mechanisms (“PIMs”), and an earnings sharing mechanism (“ESM”).

 

◦The initial filing requested an approximately 15.1% overall increase in retail revenues over the two-year period, or approximately $729 million.

 

◦The rate case filing requested an overall rate of return of 7.92% based upon an ROE of 10.95% with a 53% equity component in the capital structure2 as compared to the ROE approved in the last rate case of 9.8% with a 53% equity component in the capital structure.

 

◦The historic base case in the initial filing is based on North Carolina retail rate base of approximately $17.9 billion as of December 31, 2024, adjusted for known and measurable changes projected through March 31, 2026.

 

◦The MYRP includes impacts of approximately $3.9 billion (NC retail allocation) of capital projects that are projected to go in service over the 2-year MYRP period.

 

·On July 24, 2026, the Company filed an updated revenue requirement request as part of the Company’s rebuttal testimony, which reduced the requested increase to approximately $610 million over the two-year period, which is an approximate 12.3% overall increase in retail revenues.

 

oAs part of the revised revenue requirement request, the Company has requested a 10.48% ROE with a 53% equity component in the capital structure and made certain other adjustments to reduce the requested increase.

 

·On August 5, 2026, DEP and the Public Staff, as well as other intervening parties (together, the “Intervening Parties”), filed a Comprehensive Revenue Requirement Settlement (“Comprehensive Settlement”) with the NCUC resolving all remaining revenue requirement issues in the case.

 

·On October 6, 2026, Duke Energy Carolinas and Duke Energy Progress, as well as the Public Staff and other intervening parties, filed an Agreement and Stipulation of Settlement on Large Load Tariff.

 

·On November 16, 2026, the NCUC issued a written Order approving the Comprehensive Settlement and all other rate case stipulations, without modification, except the Stipulation of Settlement on Large Load Tariff.

 

Major Components of the Order:

 

·9.8% ROE and 53% equity component in the capital structure, and resolves all other revenue requirement issues, including various accounting and plant items.

 

·The historic base case is based on North Carolina retail rate base of approximately $17.8 billion.

 

 

2 Overall rate of return includes the provisions of the CCR settlement which includes a 150 basis point reduction in the ROE with a 52% equity component for the capital structure allowed for coal ash deferrals during the amortization period.

 

 

 

 

·The MYRP will include approximately $3.4 billion of capital (NC retail allocation) projected to go in service over the 2-year MYRP period, along with an annual MYRP refund mechanism (based upon both the number of projects and amount of capital placed in service in a rate year compared to what was approved for that rate year).

 

·The Order approves the resolution of all remaining issues related to the revenue requirement in the case as well as mechanics of the decoupling mechanism and ESM, as agreed upon in the Comprehensive Settlement.

 

·The Order also establishes a DC Schedule for certain data center customers, including the following requirements (which includes certain terms that were included in the Large Load Tariff settlement and others that are incremental):

 

oMinimum 15-year contract terms for data centers >100 MW;

 

oMinimum billing demand of 75% of contract demand;

 

oInterim curtailment provisions;

 

oContribution in Aid of Construction (“CIAC”) for dedicated facilities;

 

oLetter of Credit for all transmission network upgrades along with partial direct assignment of transmission network upgrades based on customer benefit but with a methodology to be determined in the future;

 

oLiquidated damages for early termination; and

 

oA stranded generation charge requiring security posting and additional payment at the end expiration of the contract term using a methodology to be determined in the future.

 

·DEP will extend the amortization of deferred coal ash costs from five years to eight years.

 

·DEP will increase the flow back of production tax credits (PTC) to customers from $40 million annually in the Company’s original request to $120 million annually for 2027 and 2028.

 

·DEP agreed to a $10 million shareholder contribution to support bill assistance through the Share the Light Fund and health and safety repairs through the Helping Home Fund.

 

·The Company will evaluate the potential to delay its next base rate case filing until no earlier than November 1, 2028. The Company has indicated that it can agree to this delay if permitted to defer costs directly associated with the Commission-approved Person County CC1 and Marshall CTs, from the time each plant is placed in service until such costs can be reflected in new base rates with a full Weighted Average Cost of Capital (“WACC”) during the deferral period.

 

·The Comprehensive Settlement results in a revised revenue requirement increase of $338 million over the two-year period, an average annual rate increase of 3.4% over two years. The Order directs the Company to work with Public Staff to finalize the revenue requirement.

 

Additional Information:

 

·Total Year 1 rates are expected to be in effect on January 1, 2027.

 

·DEP expects to record a one-time pre-tax accounting charge of $10 million as a result of the Order. This amount will be recorded in the fourth quarter 2026 and is expected to be treated as a special item and excluded from adjusted earnings.

 

 

 

 

Reconciliation of Company Request to Reflect the NCUC Order, which approves the Comprehensive Revenue Requirement Settlements

 

($ in millions)  Historic
Base
Case
   Year 1 -
MYRP
   Year 1
Total
   Year 2 –
MYRP
   Combined
Total
 
Original requested revenue requirement increase  $401   $127   $528   $200   $729 
Post-filing adjustments by Company   (82)   (17)   (99)   (19)   (119)
Revised Company requested revenue requirement increase  $319   $110   $429   $181   $610 
Reduced ROE (10.48% to 9.8%)   (84)   (4)   (87)   (6)   (93)
MYRP adjustments   --    (12)   (12)   (22)   (34)
Extended amortization of deferred coal ash costs   (28)   --    (28)   --    (28)
 Increased PTC giveback   (80)   --    (80)   --    (80)
Other stipulated adjustments   (37)   --    (37)   --    (37)
Revised revenue requirement increase after Comprehensive Settlement(2)  $90   $94   $185   $153   $338 
Net annualized customer rate increase(2)   1.8%   1.9%   3.7%   3.1%   6.8%

 

Note: Totals may not add due to rounding

(2)Subject to finalization with Public Staff based on NCUC Order

 

Cautionary Statement Regarding Forward-Looking Statements

 

This document includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Forward-looking statements are based on management’s beliefs and assumptions. These forward-looking statements are identified by terms and phrases such as "anticipate," "believe," "intend," "estimate," "expect," "continue," "should," "could," "may," "plan," "project," "predict," "will," "potential," "forecast," "target," "outlook," "guidance," and similar expressions. Various factors may cause actual results to be materially different than the suggested outcomes within forward-looking statements; accordingly, there is no assurance that such results will be realized. These risks and uncertainties are identified and discussed in Duke Energy’s Form 10-K for the year ended December 31, 2025, and subsequent quarterly reports filed with the Securities and Exchange Commission (“SEC”) and available at the SEC’s website at www.sec.gov. In light of these risks, uncertainties and assumptions, the events described in the forward-looking statements might not occur or might occur to a different extent or at a different time than Duke Energy has described. Duke Energy expressly disclaims an obligation to publicly update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.