UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM
(Mark One)
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the quarterly period ended
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the transition period from ______ to ______
Commission File Number:
(Exact Name of Registrant as Specified in its charter)
(State or other jurisdiction of incorporation or organization) | (I.R.S. Employer Identification No.) |
(Address of Principal Executive Offices) (Zip Code)
(
(Registrant’s telephone number including area code)
Securities registered pursuant to Section 12(b) of the Act:
a | ||
Title of each class | Trading Symbol | Name of each exchange where registered |
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See definitions of “large accelerated filer”, “accelerated filer”, “smaller reporting company”, and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large accelerated filer | ◻ | Accelerated filer | ◻ |
☒ | Smaller reporting company | ||
Emerging growth company |
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act◻
Indicate by check mark whether registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes
Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date:
GOLD RESOURCE CORPORATION
FORM 10-Q
Table of Contents
Page | |||
3 | |||
5 | |||
Condensed Consolidated Interim Financial Statements and Notes | 5 | ||
5 | |||
6 | |||
7 | |||
8 | |||
9 | |||
Management’s Discussion and Analysis of Financial Condition and Results of Operations | 30 | ||
49 | |||
50 | |||
51 | |||
51 | |||
51 | |||
51 | |||
52 | |||
52 | |||
52 | |||
52 | |||
53 |
Aerial View of Processing Plant |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
2
FIRST QUARTER 2025 SUMMARY
A summary for the three months ended March 31, 2025 is presented below and discussed further under Item 2—Management’s Discussion and Analysis of Financial Condition and Results of Operations:
Don David Gold Mine (“DDGM”)
● | In the first quarter of 2025, DDGM, located in Mexico, produced and sold a total of 3,394 gold equivalent (“AuEq”) ounces, comprised of 859 gold ounces and 230,320 silver ounces at an average sales price per ounce of $2,956 and $32.54, respectively. |
● | During the first quarter, underground definition and grade control drilling progressed positively at the Three Sisters vein system, targeting the Sandy 1, Sandy 2 and Sadie 1 veins. Additionally, some definition drilling was completed on the Marena, Santa Helena and Viridiana veins within the Arista system. The goal of the drilling is to maximize potential economic returns from near-term production from both of the vein systems. Although underground exploration drilling is currently suspended, additional step-out targets at the Three Sisters and Arista vein systems have been identified for future drill testing. Exploration drilling will resume once the necessary development is completed and the Company’s working capital has increased. |
Corporate and Financial
● | The Company has $6.2 million in working capital and $4.9 million in cash as of March 31, 2025. |
● | Net loss was $8.3 million or $0.07 per share for the quarter, which was mainly attributable to lower production and a decrease in net sales. Production was significantly impacted by the aging mining fleet with lessened availability of the critical mining equipment and the lack of alternative ore production headings. |
● | Total cash cost after co-product credits for the quarter was $2,494 per AuEq ounce, and total all-in sustaining cost (“AISC”) after co-product credits for the quarter was $3,252 per AuEq ounce. (See Item 2—Management’s Discussion and Analysis of Financial Condition and Results of Operations – Non-GAAP Measures for a reconciliation of non-GAAP measures to applicable GAAP measures). |
Liquidity Update
Both the grade and tonnes produced from the mining operations at DDGM remained lower than previous years during the first quarter of 2025. There are several factors that caused these declines. The Company has encountered significant issues with equipment availability due to the age and condition of some of the critical mining equipment in use at the mine. Due to the continued challenges with equipment availability and the decreased cash due to prior production shortfalls, the Company was not able to maintain its projected timeline for the development of future production zones. As a result, the Company is currently mining only one face at a time in areas that are accessible. The current lack of other available production zones has placed additional pressure on the Company’s ability to achieve its production estimates, as any problems encountered at the current production zone cannot be offset by production elsewhere in the mine. In addition, the mill continued to experience mechanical issues that resulted in lower throughput, and when combined with the lower tons mined, resulted in a production shortfall. To minimize the mechanical issues and return the mine to a cash positive position, capital is necessary to replace some of the mining fleet and upgrade the mill.
The Company believes that the mine has potential to generate positive cash flow based on the information to date from the new areas of the Three Sisters, as well as other areas that have been discovered near the existing mining zones. In order to develop access and better define these new areas, an investment must be made in the equipment and mine plan. Without the addition of these areas to the life-of-mine plan, the Company does not believe that the mine will generate sufficient free cash flow in the near term.
The Company’s inability to achieve its production estimates and lack of adequate liquidity has created substantial doubt about its ability to continue as a going concern. The Company previously announced that it would require approximately $7.0 million to obtain additional mining equipment and for mill upgrades. Management is currently looking to reduce the amount necessary for mining equipment purchases by purchasing used equipment in good condition and using a third-party contractor that will provide its own equipment. In addition to the above
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
3
mentioned equipment and mill upgrades, the Company also expects to require approximately $8.0 million in working capital over the next 12 months in order to fund the initial development to access the Three Sisters and Splay 31 systems, although not all of this capital will be required immediately. Due to the early 2025 production challenges described above, the Company does not believe that the mine will generate sufficient cash flow to fund these improvements.
The Company raised $2.5 million through a registered direct offering in January 2025. Further, in February 2025, the Company sold its interest in Green Light Metals for $0.9 million. Year-to-date 2025, the Company has raised $8.6 million through its At-The-Market Offering (“ATM”) Program, after deducting the agent’s commissions and other expenses, and may utilize the ATM further to raise capital, as required. A portion of these proceeds was used to fund operations during the first quarter of 2025.
Additionally, on May 7, 2025, the Company received the previously disclosed tax refund of 76 million pesos from the overpayment of Mexico taxes by DDGM in 2023, plus an inflation adjustment, for a total of 79.6 million pesos (approximately $4.0 million). The Company continues to evaluate various financing options to fund its working capital needs for the next 12 months.
If the Company is unable to obtain additional capital and successfully develop the new mining areas, the continued operation of the mine may not be possible beyond the third quarter of 2025. If continued operation of the mine is not possible, the Company may be compelled to place the mine on “care and maintenance” status, which would likely trigger significant severance and other costs, which the Company may not be able to pay.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
4
PART I - FINANCIAL INFORMATION
ITEM 1. Financial Statements
GOLD RESOURCE CORPORATION
CONDENSED CONSOLIDATED INTERIM BALANCE SHEETS
(U.S. dollars in thousands, except share amounts)
(Unaudited)
As of | As of | |||||
March 31, | December 31, | |||||
Note | 2025 |
| 2024 | |||
ASSETS | ||||||
Current assets: | ||||||
Cash and cash equivalents | $ | | $ | | ||
Accounts receivable, net | | | ||||
Inventories, net | 6 | | | |||
Prepaid expenses and other current assets | 8 | | | |||
Total current assets | | | ||||
Property, plant, and mine development, net | 9 | | | |||
Other non-current assets | 10 | | | |||
Total assets | $ | | $ | |||
LIABILITIES AND SHAREHOLDERS’ EQUITY | ||||||
Current liabilities: | ||||||
Accounts payable | $ | | $ | | ||
Mining royalty taxes payable, net | | | ||||
Accrued expenses and other current liabilities | 11 | | | |||
Total current liabilities | | | ||||
Reclamation and remediation liabilities | 13 | | | |||
Gold and silver stream agreements liability | 12 | | | |||
Deferred tax liabilities, net | 7 | | | |||
Contingent consideration | 14 | | | |||
Other non-current liabilities | 11 | | | |||
Total liabilities | | | ||||
Commitments and contingencies | 14 | |||||
Shareholders’ equity: | ||||||
Common stock - $ | | | ||||
Additional paid-in capital | | | ||||
Accumulated deficit | ( | ( | ||||
Treasury stock at cost, | ( | ( | ||||
Accumulated other comprehensive loss | ( | ( | ||||
Total shareholders’ equity | | | ||||
Total liabilities and shareholders’ equity | $ | | $ | |
The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
5
GOLD RESOURCE CORPORATION
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF OPERATIONS
(U.S. dollars in thousands, except share and per share amounts)
(Unaudited)
For the three months ended | |||||||
March 31, | |||||||
Note |
| 2025 |
| 2024 | |||
Restated | |||||||
Sales, net | 5 | $ | | $ | | ||
Cost of sales: | |||||||
Production costs | | | |||||
Depreciation and amortization | | | |||||
Reclamation and remediation | | | |||||
Total cost of sales | | | |||||
Mine gross loss | ( | ( | |||||
Costs and expenses: | |||||||
General and administrative expenses | | | |||||
Mexico exploration expenses | | | |||||
Michigan Back Forty Project expenses | | | |||||
Stock-based compensation | 18 | | | ||||
Other expense, net | 19 | | | ||||
Total costs and expenses | | | |||||
Loss before income taxes | ( | ( | |||||
Income tax provision (benefit) | 7 | | ( | ||||
Net loss | $ | ( | $ | ( | |||
Net loss per common share: | |||||||
Basic and diluted net loss per common share | 20 | $ | ( | $ | ( | ||
Weighted average shares outstanding: |
| ||||||
Basic and diluted | 20 | | |
The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
6
GOLD RESOURCE CORPORATION
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF CHANGES IN SHAREHOLDERS’ EQUITY
(U.S. dollars in thousands, except share amounts)
(Unaudited)
For the three months ended March 31, 2025 and 2024 | ||||||||||||||||||||
| Number of |
| Par Value of |
| Additional Paid- |
| Retained |
| Treasury |
| Accumulated |
| Total | |||||||
Balance, December 31, 2023 | | $ | | $ | | $ | ( | $ | ( | $ | ( | $ | | |||||||
Stock-based compensation | - | - | | - | - | - | | |||||||||||||
Common stock issued for vested restricted stock units | | - | - | - | - | - | - | |||||||||||||
Surrender of common stock for taxes due on vesting | ( | - | ( | - | - | - | ( | |||||||||||||
Net loss | - | - | - | ( | - | - | ( | |||||||||||||
Balance, March 31, 2024 - Restated | | $ | | $ | | $ | ( | $ | ( | $ | ( | $ | | |||||||
Balance, December 31, 2024 | | $ | | $ | | $ | ( | $ | ( | $ | ( | $ | | |||||||
Stock-based compensation | - | | - | - | - | | ||||||||||||||
Common stock issued for vested restricted stock units | | - | - | - | - | - | ||||||||||||||
Issuance of common stock, net of issuance costs (1) | | | | - | - | - | | |||||||||||||
Surrender of common stock for taxes due on vesting | ( | - | ( | - | - | - | ( | |||||||||||||
Registered Direct Offering (2) | | | | | ||||||||||||||||
Net loss | - | - | ( | - | - | ( | ||||||||||||||
Balance, March 31, 2025 | | $ | | $ | | $ | ( | $ | ( | $ | ( | $ | |
(1) | An aggregate of |
(2) | In January 2025, the Company closed its registered direct offering of |
The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.
GOLD RESOURCE CORPORATION
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF CASH FLOWS
(U.S. dollars in thousands)
(Unaudited)
For the three months ended March 31, | ||||||
Note | 2025 |
| 2024 | |||
Restated | ||||||
Cash flows from operating activities: | ||||||
Net loss | $ | ( | $ | ( | ||
Adjustments to reconcile net loss to net cash (used in) provided by operating activities: | ||||||
Deferred income tax expense (benefit) | | ( | ||||
Depreciation and amortization | | | ||||
Stock-based compensation | | | ||||
Interest on streaming liabilities | | | ||||
Other operating adjustments, net | 22 | | ( | |||
Changes in operating assets and liabilities: | ||||||
Accounts receivable | ( | | ||||
Inventories | | ( | ||||
Prepaid expenses and other current assets | | | ||||
Other non-current assets | | | ||||
Accounts payable and other accrued liabilities | ( | | ||||
Cash settled liability awards | ( | ( | ||||
Mining royalty and income taxes payable, net | | | ||||
Net cash (used in) provided by operating activities | ( | | ||||
Cash flows from investing activities: | ||||||
Capital expenditures | ( | ( | ||||
Proceeds from the sale of investment in Green Light Metals | | - | ||||
Net cash used in investing activities | ( | ( | ||||
Cash flows from financing activities: | ||||||
Proceeds from ATM Program sales, net of issuance costs | | - | ||||
Proceeds from the Registered Direct Offerings | | - | ||||
Other financing activities | ( | ( | ||||
Net cash provided by (used in) financing activities | | ( | ||||
Effect of exchange rate changes on cash and cash equivalents | ( | ( | ||||
Net increase (decrease) in cash and cash equivalents | | ( | ||||
Cash and cash equivalents at beginning of period | | | ||||
Cash and cash equivalents at end of period | $ | | $ | | ||
Supplemental Cash Flow Information | ||||||
Income and mining taxes paid | $ | - | $ | |||
Non-cash investing or financing activities: | ||||||
Value of common shares issued for RSU redemption | $ | | $ | | ||
Balance of capital expenditures in accounts payable | $ | | $ | | ||
Balance of equipment financing | $ | | $ | - |
The accompanying notes are an integral part of these Condensed Consolidated Interim Financial Statements.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
8
GOLD RESOURCE CORPORATION
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
March 31, 2025
(Unaudited)
1. Basis of Preparation of Financial Statements
The Condensed Consolidated Interim Financial Statements (“interim financial statements”) of Gold Resource Corporation and its subsidiaries (collectively, the “Company”) are unaudited and have been prepared in accordance with the rules of the Securities and Exchange Commission (“SEC”) for interim statements. Certain information and footnote disclosures required by United States Generally Accepted Accounting Principles (“U.S. GAAP”) have been condensed or omitted as permitted by such rules. However, the Company believes that the disclosures included are adequate to make the information presented not misleading. In the opinion of management, all adjustments (including normal recurring adjustments) and disclosures necessary for a fair presentation of these interim financial statements have been included. The results reported in these interim financial statements do not necessarily indicate the results that may be reported for the entire year. These interim financial statements should be read in conjunction with the audited consolidated financial statements for the year ended December 31, 2024, included in the Company’s annual report on Form 10-K (the “2024 Annual Report”). The year-end balance sheet data was derived from the audited financial statements. Unless otherwise noted, there have been no material changes to the footnotes from those accompanying the audited consolidated financial statements contained in the 2024 Annual Report.
2. Restatement of Financial Statements
The interim unaudited condensed consolidated financial statements include corrections to the three months period ended March 31, 2024, which were presented in Note 24 to the consolidated financial statements for the year ended December 31, 2024, in the Company’s 2024 Form 10-K filed on April 8, 2025. During the preparation of the consolidated financial statements for the year ended December 31, 2024, management of the Company identified that liabilities related to the Company’s Back Forty Project with respect to the Gold and Silver Stream Agreements with Osisko (the “Osisko Stream Agreements”) were incorrectly presented in the Company’s financial statements due to errors in the application of U.S. GAAP. The errors related to the calculation of interest accretion over the liabilities associated with the Osisko Stream Agreements (the “streaming liabilities”). It was determined that the streaming liabilities should be accounted for under Financial Accounting Standards Board’s Accounting Standards Codification 606, Revenue from Contracts with Customers, and that a significant financing component is present that should be accreted using the effective interest method. The resulting errors understated the streaming liabilities and net loss for all the impacted periods noted below.
The correction to the Company’s consolidated statements of operations also impacts the Company’s consolidated balance sheets, consolidated statements of changes in shareholders’ equity, consolidated statements of cash flows, and certain notes to the consolidated financial statements.
In the restated presentation, the Company also recorded previously uncorrected misstatements that were determined to be immaterial to the financial statements in prior periods.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
9
The following table presents the Company’s restatement impact in the unaudited condensed consolidated statement of operations for the three months ended March 31, 2024:
UNAUDITED CONDENSED CONSOLIDATED STATEMENT OF OPERATIONS | |||||||||
For the three months ended March 31, 2024 | |||||||||
As Previously | Restatement | Restated | |||||||
(U.S. dollars in thousands, except share and per share amounts) | |||||||||
Sales, net | $ | | $ | - | $ | | |||
Cost of sales: | |||||||||
Production costs | | - | | ||||||
Depreciation and amortization | | - | | ||||||
Reclamation and remediation | | - | | ||||||
Total cost of sales | | - | | ||||||
Mine gross (loss) profit | ( | - | ( | ||||||
Costs and expenses: | |||||||||
General and administrative expenses | | | | ||||||
Mexico exploration expenses | | - | | ||||||
Michigan Back Forty Project expenses | | - | | ||||||
Stock-based compensation | | - | | ||||||
Other expense, net | | | | ||||||
Total costs and expenses | | | | ||||||
Loss before income taxes | ( | ( | ( | ||||||
Income tax benefit | ( | - | ( | ||||||
Net loss | $ | ( | $ | ( | $ | ( | |||
Net loss per common share: | |||||||||
Basic and diluted net loss per common share | $ | ( | $ | ( | $ | ( | |||
Weighted average shares outstanding: | |||||||||
Basic and diluted | | - | |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
10
The following table presents the Company’s restatement impact in the unaudited condensed consolidated statement of changes in shareholders’ equity for the three months ended March 31, 2024:
UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY | ||||||||||||||||||||
As Previously Reported | For the three months ended March 31, 2024 | |||||||||||||||||||
| Number of |
| Par Value of |
| Additional Paid- |
| Retained |
| Treasury |
| Accumulated |
| Total | |||||||
(U.S. dollars in thousands, except share amounts) | ||||||||||||||||||||
Balance, December 31, 2023 | | $ | | $ | | $ | ( | $ | ( | $ | ( | $ | | |||||||
Stock-based compensation | - | - | | - | - | - | | |||||||||||||
Common stock issued for vested restricted stock units | | - | - | - | - | - | - | |||||||||||||
Surrender of common stock for taxes due on vesting | ( | - | ( | - | - | - | ( | |||||||||||||
Net loss | - | - | - | ( | - | - | ( | |||||||||||||
Balance, March 31, 2024 | | $ | | $ | | $ | ( | $ | ( | $ | ( | $ | | |||||||
Restatement Impacts | ||||||||||||||||||||
Balance, December 31, 2023 | - | $ | - | $ | - | $ | ( | $ | - | $ | - | $ | ( | |||||||
Stock-based compensation | - | - | - | - | - | - | - | |||||||||||||
Common stock issued for vested restricted stock units | - | - | - | - | - | - | - | |||||||||||||
Surrender of common stock for taxes due on vesting | - | - | - | - | - | - | - | |||||||||||||
Net loss | - | - | - | ( | - | - | ( | |||||||||||||
Balance, March 31, 2024 | - | $ | - | $ | - | $ | ( | $ | - | $ | - | $ | ( | |||||||
Restated | ||||||||||||||||||||
Balance, December 31, 2023 | | $ | | $ | | $ | ( | $ | ( | $ | ( | $ | | |||||||
Stock-based compensation | - | - | | - | - | - | | |||||||||||||
Common stock issued for vested restricted stock units | | - | - | - | - | - | - | |||||||||||||
Surrender of common stock for taxes due on vesting | ( | - | ( | - | - | - | ( | |||||||||||||
Net loss | - | - | - | ( | - | - | ( | |||||||||||||
Balance, March 31, 2024 | | $ | | $ | | $ | ( | $ | ( | $ | ( | $ | |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
11
The following table presents the Company’s restatement impact in the unaudited condensed consolidated statement of cash flows for the three months ended March 31, 2024:
UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS | ||||||||
For the three months ended March 31, 2024 | ||||||||
As Previously |
| Restatement |
| Restated | ||||
(U.S. dollars in thousands) | ||||||||
Cash flows from operating activities: | ||||||||
Net loss | $ | ( | $ | ( | $ | ( | ||
Adjustments to reconcile net loss to net cash provided by operating activities: | ||||||||
Deferred income tax benefit | ( | - | ( | |||||
Depreciation and amortization | | - | | |||||
Stock-based compensation | | - | | |||||
Interest on streaming liabilities | - | | | |||||
Other operating adjustments, net | ( | - | ( | |||||
Changes in operating assets and liabilities: | ||||||||
Accounts receivable | | - | | |||||
Inventories | ( | - | ( | |||||
Prepaid expenses and other current assets | | - | | |||||
Other non-current assets | | - | | |||||
Accounts payable and other accrued liabilities | | ( | | |||||
Cash settled liability awards | ( | - | ( | |||||
Mining royalty and income taxes payable, net | | - | | |||||
Net cash provided by operating activities | | - | | |||||
Cash flows from investing activities: | ||||||||
Capital expenditures | ( | - | ( | |||||
Net cash used in investing activities | ( | - | ( | |||||
Cash flows from financing activities: | ||||||||
Other financing activities | ( | - | ( | |||||
Net cash used in financing activities | ( | - | ( | |||||
Effect of exchange rate changes on cash and cash equivalents | ( | - | ( | |||||
Net decrease in cash and cash equivalents | ( | - | ( | |||||
Cash and cash equivalents at beginning of period | | - | | |||||
Cash and cash equivalents at end of period | $ | | $ | - | $ | | ||
Supplemental Cash Flow Information | ||||||||
Income and mining taxes paid | $ | | $ | - | $ | |||
Non-cash investing or financing activities | ||||||||
Value of Common Shares issued for RSU Redemption | $ | | $ | - | $ | | ||
Balance of capital expenditures in accounts payable | $ | | $ | - | $ | |
3. New Accounting Pronouncements
The FASB issued ASU 2023-09, Income Taxes (Topic 740): Improvement to Income Tax Disclosures in December 2023, amending income tax disclosure requirements for the effective tax rate reconciliation and income taxes paid. The amendments in ASU 2023-09 are effective for fiscal years beginning after December 15, 2024, and are applied prospectively with retrospective application permitted. The Company is evaluating the impact this guidance will have on the disclosures in the consolidated financial statements.
In November 2024, the FASB issued ASU 2024-03, Income Statement—Reporting Comprehensive Income—Expense Disaggregation Disclosures (Subtopic 220-40) to improve the disclosures about a public business entity’s expense and provide more detailed information about the types of expenses included in certain expense captions in the consolidated financial statements. The amendments in this update are effective for annual reporting periods beginning after December 15, 2026, and interim reporting periods beginning after December 15, 2027. Early adoption is permitted and the amendments in this update should be applied either prospectively or retrospectively. The Company is evaluating the impact this guidance will have on the disclosures in the consolidated financial statements.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
12
4. Going Concern
In accordance with Accounting Standards Codification (“ASC”) 205-40, Going Concern, ("ASC 205-40"), the Company evaluated whether there are conditions and events, considered in the aggregate, that raise substantial doubt about the Company’s ability to continue as a going concern within one year after the date on which this Quarterly Report on Form 10-Q is filed. The accompanying interim financial statements have been prepared assuming that the Company will continue as a going concern. However, the Company’s low production and lack of adequate liquidity has created substantial doubt about the Company’s ability to continue as a going concern, as reflected by the net losses of $
5. Revenue
The Company derives its revenue mainly from the sale of concentrates. The following table presents the Company’s net sales for each period presented, disaggregated by source:
For the three months ended March 31, | ||||||
| 2025 |
| 2024 | |||
(in thousands) | ||||||
Doré sales, net | ||||||
Gold | $ | - | $ | | ||
Silver | - | | ||||
Less: Refining charges | - | ( | ||||
Total doré sales, net | - | | ||||
Concentrate sales | ||||||
Gold | | | ||||
Silver | | | ||||
Copper | | | ||||
Lead | | | ||||
Zinc | | | ||||
Less: Treatment and refining charges | ( | ( | ||||
Total concentrate sales, net | | | ||||
Realized gain - embedded derivative, net (1) | | | ||||
Unrealized gain - embedded derivative, net | | | ||||
Total sales, net | $ | | $ | |
(1) | Copper, lead, and zinc are co-products. In the Realized gain (loss) - embedded derivative, net, there is $ |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
13
6. Inventories, net
At March 31, 2025 and December 31, 2024, inventories, net, consisted of the following:
| As of |
| As of | |||
March 31, | December 31, | |||||
2025 | 2024 | |||||
(in thousands) | ||||||
Stockpiles - underground mine | $ | | $ | | ||
Concentrates | | | ||||
Doré, net | | | ||||
Subtotal - product inventories | | | ||||
Materials and supplies (1) | | | ||||
Total | $ | | $ | |
(1) | Net of reserve for obsolescence of $ |
7. Income Taxes
The Company recorded an income tax expense of $
Mexico Valuation Allowance
The Company recorded a valuation allowance on all of the Mexico Income Tax net deferred tax assets in 2024 and has continued with a valuation allowance on all of the Mexico Income Tax net deferred tax assets as of March 31, 2025. In accordance with applicable accounting rules, a valuation allowance is recorded when it is more likely than not that some portion of the deferred tax assets will not be realized, after considering all available evidence, both positive and negative. The Company determined a valuation allowance on Mexico Income Tax deferred tax assets was necessary due primarily to the recent losses at the Mexico mine.
Mexico Mining Taxation
Mining entities in Mexico are subject to two mining duties, in addition to the
The Company periodically transfers funds from its Mexican wholly owned subsidiary to the U.S. as dividends. Mexico requires a
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
14
and paid a
In October 2023, the Company received a notification from the Mexican Tax Administration Services (“SAT”) with a sanction of
8. Prepaid Expenses and Other Current Assets
At March 31, 2025 and December 31, 2024, prepaid expenses and other current assets consisted of the following:
| As of |
| As of | |||
March 31, | December 31, | |||||
2025 | 2024 | |||||
(in thousands) | ||||||
Advances to suppliers | $ | | $ | | ||
Prepaid insurance | | | ||||
Prepaid income tax | | | ||||
Other current assets | | | ||||
Total | $ | | $ | |
Prepaid income tax
Mexican tax statutes specify that the current year tax prepayments be calculated based on a coefficient for prior year earnings, regardless of current year results. Starting in the third quarter of each year, these same statutes allow companies to request a reduction of the coefficient, which adjusts for losses experienced in the current year. During 2023, DDGM had to prepay approximately
Other current assets
A value-added (“IVA”) tax in Mexico is assessed on the sales of products and purchases of materials and services. Businesses owe IVA taxes as the business sells a product and collects IVA taxes from its customers. Likewise, businesses are generally entitled to recover the taxes they have paid related to purchases of materials and services, either as a refund or credit to IVA tax payable. Amounts recorded as IVA taxes in the consolidated financial statements represent the net estimated IVA tax payable or receivable, since there is a legal right of offset of IVA taxes. As of March 31, 2025 and December 31, 2024, this resulted in an asset balance of $
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
15
9. Property, Plant, and Mine Development, net
At March 31, 2025 and December 31, 2024, property, plant, and mine development, net consisted of the following:
| As of |
| As of | |||
March 31, | December 31, | |||||
2025 | 2024 | |||||
(in thousands) | ||||||
Asset retirement costs (“ARO asset”) | $ | | $ | | ||
Construction-in-progress | | | ||||
Furniture and office equipment | | | ||||
Land | | | ||||
Mineral interest | | | ||||
Light vehicles and other mobile equipment | | | ||||
Machinery and equipment | | | ||||
Mill facilities and infrastructure | | | ||||
Mine development | | | ||||
Software and licenses | | | ||||
Subtotal | | | ||||
Accumulated depreciation and amortization | ( | ( | ||||
Total | $ | | $ | |
The Company recorded depreciation and amortization expense of $
10. Other Non-current Assets
At March 31, 2025 and December 31, 2024, other non-current assets consisted of the following:
| As of |
| As of | |||
March 31, | December 31, | |||||
2025 | 2024 | |||||
(in thousands) | ||||||
Investment in Green Light Metals | - | | ||||
Other non-current assets | | | ||||
Total | $ | | $ | |
Investment in Green Light Metals
On December 28, 2022, the Company received
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
16
11. Accrued Expenses and Other Liabilities
At March 31, 2025 and December 31, 2024, accrued expenses and other liabilities consisted of the following:
| As of |
| As of | |||
March 31, | December 31, | |||||
2025 | 2024 | |||||
Restated | ||||||
(in thousands) | ||||||
Accrued royalty payments | $ | | $ | | ||
Accrual for short-term incentive plan | | | ||||
Liability for Aquila drillhole capping | | | ||||
Share-based compensation liability - current | | | ||||
Equipment financing | | | ||||
Employee profit sharing obligation | | | ||||
Other payables | | | ||||
Total accrued expenses and other current liabilities | $ | | $ | | ||
Accrued non-current labor obligation | $ | | $ | | ||
Share-based compensation liability | | | ||||
Other long-term liabilities | | | ||||
Total other non-current liabilities | $ | | $ | |
12. Gold and Silver Stream Agreements
The following table presents the Company’s liabilities related to the Company’s Gold and Silver Stream Agreements (the “Osisko Stream Agreements”) with Osisko Bermuda Limited (“Osisko”) as of March 31, 2025 and December 31, 2024:
| As of |
| As of | |||
March 31, | December 31, | |||||
2025 | 2024 | |||||
(in thousands) | ||||||
Liability related to the Osisko Gold Stream Agreement | $ | | $ | | ||
Liability related to the Osisko Silver Stream Agreement | | | ||||
Total liability | $ | | $ | |
The Osisko Stream Agreements contain customary provisions regarding default and security. In the event that the Company defaults under the Osisko Stream Agreements, including by failing to achieve commercial production by an agreed upon date, it may be required to repay the deposit plus accumulated interest at a rate agreed with Osisko. If the Company fails to do so, Osisko may elect to enforce its remedies as a secured party and take possession of the assets that comprise the Back Forty Project.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
17
Gold Streaming Agreement
In November 2017, Aquila entered into a stream agreement with Osisko, pursuant to which Osisko agreed to commit approximately $
The $
Per the terms of the Osisko Gold Stream Agreement, Osisko will purchase
Silver Stream Agreement
Through a series of contracts, Aquila executed a silver stream agreement with Osisko to purchase
Per the terms of the Osisko Silver Stream Agreement, Osisko will purchase
The $
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
18
life-of-mine production to be deliverable and was
13. Reclamation and Remediation
The following table presents the changes in reclamation and remediation obligations for the three months ended March 31, 2025 and for the year ended December 31, 2024:
| 2025 |
| 2024 | |||
(in thousands) | ||||||
Reclamation liabilities – balance at beginning of period | $ | | $ | | ||
Foreign currency exchange gain | | ( | ||||
Reclamation liabilities – balance at end of period | | | ||||
Asset retirement obligation – balance at beginning of period | | | ||||
Changes in estimate (1) | - | | ||||
Liability for Aquila drillhole capping | - | ( | ||||
Accretion | | | ||||
Foreign currency exchange gain | | ( | ||||
Asset retirement obligation – balance at end of period | | | ||||
Total period end balance | $ | | $ | |
(1) | In 2024, the Company updated its closure plan study, which resulted in a $ |
The following table presents the reclamation and remediation obligations as of March 31, 2025 and December 31, 2024:
| As of | As of | ||||
March 31, | December 31, | |||||
2025 |
| 2024 | ||||
(in thousands) | ||||||
Current reclamation and remediation liabilities (1) | $ | | $ | | ||
Non-current reclamation and remediation liabilities | | | ||||
Total | $ | | $ | |
The Company’s undiscounted reclamation liabilities of $
The Company’s asset retirement obligations reflect the additions to the asset for reclamation and remediation costs in Property, Plant, and Mine Development, post-2013 development stage status, which are discounted using a credit adjusted risk-free rate of
14. Commitments and Contingencies
Commitments
As of March 31, 2025 and December 31, 2024, the Company has equipment purchase commitments of $
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
19
Contingent Consideration
With the Aquila acquisition, the Company assumed a contingent consideration. On December 30, 2013, Aquila’s shareholders approved the acquisition of
The contingent consideration is composed of the following:
The value of future installments is based on C$
a. | C$ |
b. | C$ |
c. | C$ |
a. | C$ |
Initially, the Company intended to pay the first C$
The total value of the contingent consideration as of March 31, 2025 and December 31, 2024 was $
The following table shows the change in the balance of the contingent consideration for the three months ended March 31, 2025 and for the year ended December 31, 2024:
| 2025 |
| 2024 | |||
(in thousands) | ||||||
Beginning Balance of contingent consideration: | ||||||
Non-current contingent consideration | $ | | $ | | ||
Change in value of contingent consideration - Non-current | | ( | ||||
Ending Balance of contingent consideration: | ||||||
Non-current contingent consideration | $ | | $ | |
Other Contingencies
The Company has certain other contingencies resulting from litigation, claims, and other commitments and is subject to various environmental and safety laws and regulations incident to the ordinary course of business. The Company currently has no basis to conclude that any or all of such contingencies will materially affect its financial position, results of operations, or cash flows. However, in the future, there may be changes to these contingencies, or additional contingencies may occur, any of which might result in an accrual or a change in current accruals recorded by the Company. There can be no assurance that the ultimate disposition of contingencies will not have a material adverse effect on the Company’s financial position, results of operations, or cash flows.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
20
With the acquisition of Aquila Resources Inc. on December 10, 2021, the Company assumed substantial liabilities that relate to the gold and silver stream agreements with OBL. Under the agreements, OBL deposited a total of $
15. Shareholders’ Equity
The Company’s At-The-Market Offering Agreement with H.C. Wainwright & Co., LLC (the “Agent”), which was entered into in November 2019, was amended in May 2023 and renewed in June 2023. Pursuant to the amended ATM Agreement, the Agent has agreed to act as the Company’s sales agent with respect to the offer and sale from time to time of the Company’s common stock having an aggregate gross sales price of up to the amount registered on the registration statement on Form S-3 relating to the ATM Program, which is $
On January 21, 2025, the Company closed on a registered direct offering with certain investors for the purchase of
16. Derivatives
Embedded Derivatives
Concentrate sales contracts contain embedded derivatives due to the provisional pricing terms for shipments pending final settlement. At the end of each reporting period, the Company records an adjustment to accounts receivable and sales to reflect the mark-to-market adjustments for outstanding provisional invoices based on forward metal prices. Please see Note—21 Fair Value Measurement in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information on the realized and unrealized gain (loss) recorded to adjust accounts receivable and revenue.
The following table summarizes the Company’s unsettled sales contracts at March 31, 2025 with the quantities of metals under contract subject to final pricing expected to occur through December 2024:
Gold | Silver | Copper | Lead | Zinc | Total | |||||||||||||
| (ounces) |
| (ounces) |
| (tonnes) |
| (tonnes) |
| (tonnes) | |||||||||
Under contract | ||||||||||||||||||
Average forward price (per ounce or tonne) | $ | $ | $ | $ | $ | |||||||||||||
Unsettled sales contracts value (in thousands) | $ | $ | $ | $ | $ | $ | |
The Company manages credit risk by entering into arrangements with counterparties believed to be financially strong, and by requiring other credit risk mitigants, as appropriate. The Company actively evaluates the implicit creditworthiness of its counterparties, and monitors credit exposures.
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
21
17. Employee Benefits
Effective October 2012, the Company adopted a profit-sharing plan (the “Plan”), which covers all U.S. employees. The Plan meets the requirements of a qualified retirement plan pursuant to the provisions of Section 401(k) of the Internal Revenue Code. The Plan also allows eligible employees to make tax deferred contributions to a retirement trust account up to
On April 23, 2021, a decree that reforms labor outsourcing in Mexico was published in the Federation’s Official Gazette. This decree amended the outsourcing provisions, whereby operating companies can no longer source their labor resources used to carry out the core business functions from service entities or third-party providers. Under Mexican law, employees are entitled to receive statutory profit sharing (Participacion a los Trabajadores de las Utilidades or “PTU”) payments. The required cash payment to employees in the aggregate is equal to
18. Stock-Based Compensation
The Company’s compensation program comprises three main elements: (1) base salary, (2) an annual short-term incentive plan (“STIP”) award which may be in the form of cash or deferred share units (“DSUs”) with immediate vesting, and (3) long-term equity-based incentive compensation (“LTIP”) in the form of stock options, restricted stock units (“RSUs”), and performance share units (“PSUs”).
The Gold Resource Corporation 2016 Equity Incentive Plan (the “Incentive Plan”) allows for the issuance of up to
The Company’s STIP provides for an annual cash bonus payable upon achievement of specified performance metrics for its management team. STIP may also be settled as a cash payable through the issuance of fully vested equity awards (such as fully vested stock grants or DSUs), or a combination of cash and stock DSUs. As of March 31, 2025, the Company accrued $
Stock-based compensation expense for the periods presented is as follows:
For the three months ended March 31, | |||||
2025 |
| 2024 | |||
(in thousands) | |||||
Stock options | $ | - | $ | | |
Restricted stock units | | | |||
Performance share units | ( | | |||
Deferred share units | | | |||
Total | $ | | $ | |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
22
Stock Options
A summary of stock option activities under the Incentive Plan for the three months ended March 31, 2025 and 2024 is presented below:
| Stock |
| Weighted | ||
Outstanding as of December 31, 2023 | | $ | | ||
Granted, Exercised, Expired, or Forfeited | | | |||
Outstanding as of March 31, 2024 | | $ | | ||
Outstanding as of December 31, 2024 | | $ | | ||
Granted, Exercised, Expired, or Forfeited | | | |||
Outstanding as of March 31, 2025 | | $ | | ||
Vested and exercisable as of March 31, 2025 | | $ | |
Restricted Stock Units
A summary of RSU activities under the Incentive Plan for the three months ended March 31, 2025 and 2024 is presented below:
| Restricted |
| Fair | ||
Nonvested as of December 31, 2023 | | $ | | ||
Vested but not redeemed (deferred) | ( | ||||
Vested and redeemed | ( | ||||
Vested and forfeited for net settlement | ( | ||||
Forfeited | ( | ||||
Nonvested as of March 31, 2024 | | $ | | ||
Nonvested as of December 31, 2024 | | $ | | ||
Vested but not redeemed (deferred) | ( | ||||
Vested and redeemed | ( | ||||
Vested and forfeited for net settlement | ( | ||||
Nonvested as of March 31, 2025 | | $ | |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
23
Performance Share Units
A summary of PSU activities under the Incentive Plan for the three months ended March 31, 2025 and 2024 is presented below:
| Performance |
| Liability Balance | ||
Outstanding as of December 31, 2023 | | $ | | ||
Redeemed | ( | ||||
Outstanding as of March 31, 2024 | | $ | | ||
Outstanding as of December 31, 2024 | | $ | | ||
Redeemed | ( | ||||
Outstanding as of March 31, 2025 | | $ | |
Deferred Share Units
A summary of DSU activities under the Incentive Plan for the three months ended March 31, 2025 and 2024 is presented below:
| Deferred |
| Liability Balance | ||
Outstanding as of December 31, 2023 | | $ | | ||
Granted in lieu of board fees | | ||||
Outstanding as of March 31, 2024 | | $ | | ||
Outstanding as of December 31, 2024 | | $ | | ||
Granted in lieu of board fees | | ||||
Outstanding as of March 31, 2025 | | $ | |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
24
19. Other Expense, net
Other expense, net, for the periods presented consisted of the following:
For the three months ended March 31, | ||||||
| 2025 |
| 2024 | |||
Restated | ||||||
(in thousands) | ||||||
Unrealized currency exchange loss (gain) (1) | $ | | $ | ( | ||
Realized currency exchange loss | | | ||||
Realized and unrealized gain from gold and silver rounds, net | ( | ( | ||||
Realized loss from sale of investments (2) | | - | ||||
Interest on streaming liabilities (3) | | | ||||
Severance | - | | ||||
Other income | ( | ( | ||||
Total | $ | | $ | |
(1) | Gains and losses due to changes in fair value are non-cash in nature until such time that they are realized through cash transactions. For additional information regarding the Company’s fair value measurements and investments, please see Note 21—Fair Value Measurement in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information. |
(2) | In the first quarter of 2025, through its subsidiary, Aquila Resources USA Inc., the Company entered into a share purchase agreement with multiple purchasers to sell all of its interest in the Green Light Metals shares, for C$ |
(3) | Periodic interest expense is based on a fixed market rate of interest which is reviewed quarterly if there are any contractual amendments relating to the Osisko Stream Agreements. Please see Note 12— Gold and Silver Stream Agreements in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information. |
20. Net Loss per Common Share
Basic net income or loss per common share is calculated based on the weighted average number of common shares outstanding for the period. Diluted earnings or loss per common share are calculated based on the assumption that stock options and other dilutive securities outstanding, which have an exercise price less than the average market price of the Company’s common shares during the period, would have been exercised on the later of the beginning of the period or the date granted and that the funds obtained from the exercise were used to purchase common shares at the average market price during the period. All of the Company’s RSUs are anti-dilutive due to the Company’s net loss for the period. Since PSUs and DSUs are expected to be cash settled, they are not included in the dilutive calculation.
The effect of the Company’s dilutive securities is calculated using the treasury stock method, and only those instruments that result in a reduction in net income per common share are included in the calculation. Options to purchase
Basic and diluted net income per common share is calculated as follows:
For the three months ended | |||||
March 31, | |||||
2025 |
| 2024 | |||
Numerator: | |||||
Net loss (in thousands) | $ | ( | $ | ( | |
Denominator: | |||||
Basic and diluted weighted average common shares outstanding | | | |||
Basic and diluted net loss per common share | $ | ( | $ | ( |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
25
21. Fair Value Measurement
Fair value accounting establishes a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets or liabilities (Level 1 measurements) and the lowest priority to unobservable inputs (Level 3 measurements). The three levels of the fair value hierarchy are described below:
Level 1 | Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, unrestricted assets or liabilities; |
Level 2 | Quoted prices in markets that are not active or inputs that are observable, either directly or indirectly, for substantially the full term of the asset or liability; and |
Level 3 | Prices or valuation techniques that require inputs that are both significant to the fair value measurement and unobservable (supported by little or no market activity). |
As required by accounting guidance, assets and liabilities are classified in their entirety based on the lowest level of input that is significant to the fair value measurement. These assets and liabilities are remeasured for each reporting period. The following tables set forth certain of the Company’s assets and liabilities measured at fair value by level within the fair value hierarchy as of March 31, 2025 and December 31, 2024:
| As of | As of |
| |||||
March 31, | December 31, | Input Hierarchy Level | ||||||
2025 |
| 2024 | ||||||
(in thousands) | ||||||||
Cash and cash equivalents | $ | | $ | | Level 1 | |||
Accounts receivable, net | $ | | $ | | Level 2 | |||
Investment in equity securities-Green Light Metals | $ | - | $ | | Level 3 |
The following methods and assumptions were used to estimate the fair value of each class of financial instrument:
Cash and cash equivalents: Cash and cash equivalents consist primarily of cash deposits and are valued at cost, approximating fair value.
Accounts receivable, net: Accounts receivable, net include amounts due to the Company for deliveries of concentrates and doré sold to customers. Concentrate sales contracts provide for provisional pricing as specified in such contracts. These sales contain an embedded derivative related to the provisional pricing mechanism which is bifurcated and accounted for as a derivative. At the end of each reporting period, the Company records an adjustment to sales to reflect the mark-to-market of outstanding provisional invoices based on the forward price curve. Because these provisionally priced sales have not yet settled as of the reporting date, the mark-to-market adjustment related to these invoices is included in accounts receivable as of each reporting date.
At March 31, 2025 and December 31, 2024, the Company had an unrealized gain of $
Investment in equity securities—Green Light Metals: Upon maturity on December 28, 2022, the Company received
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
26
Gains and losses related to changes in the fair value of embedded derivatives were included in the Condensed Consolidated Interim Statements of Operations, as shown in the following table (in thousands):
For the three months ended March 31, | Statements of Operations Classification | ||||||||
|
| 2025 |
| 2024 |
| ||||
Note | |||||||||
Realized and unrealized derivative (loss) gain, net | 16 | $ | | $ | | Sales, net |
Realized/Unrealized Derivatives
The following tables summarize the Company’s realized/unrealized derivatives for the periods presented (in thousands):
| Gold |
| Silver |
| Copper |
| Lead |
| Zinc |
| Total | |||||||
For the three months ended March 31, 2025 | ||||||||||||||||||
Realized gain (loss) | $ | | $ | | $ | | $ | - | $ | ( | $ | | ||||||
Unrealized gain (loss) | | | | | ( | | ||||||||||||
Total realized/unrealized derivatives, net | $ | | $ | | $ | | $ | | $ | ( | $ | |
| Gold |
| Silver |
| Copper |
| Lead |
| Zinc |
| Total | |||||||
For the three months ended March 31, 2024 | ||||||||||||||||||
Realized gain (loss) | $ | | $ | ( | $ | | $ | ( | $ | | $ | | ||||||
Unrealized gain (loss) | | | ( | | ( | | ||||||||||||
Total realized/unrealized derivatives, net | $ | | $ | | $ | | $ | | $ | ( | $ | |
22. Supplementary Cash Flow Information
Other operating adjustments and write-downs within net cash provided by operating activities on the Condensed Consolidated Interim Statements of Cash Flows for the three months ended March 31, 2025 and 2024 consisted of the following:
| For the three months ended March 31, | |||||
2025 |
| 2024 | ||||
(in thousands) | ||||||
Unrealized gain on gold and silver rounds | $ | ( | $ | ( | ||
Unrealized foreign currency exchange loss (gain) | | ( | ||||
Other, net | | ( | ||||
Total other operating adjustments, net | $ | | $ | ( |
23. Segment Reporting
The Company has organized its operations into
The Company’s operating segments reflect the way in which internally reported financial information is used to make decisions and allocate resources. The Chief Executive Officer, who is considered to be the CODM, reviews financial information presented on both a consolidated and an operating segment basis for purposes of making decisions and assessing
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
27
financial performance. Net income or loss before income taxes is the measure of segment profit or loss that is regularly reviewed and is most consistent with the measurement principles used in the consolidated financial statements. The most significant expenses reviewed by the CODM are production costs and exploration expenses. Please refer to the table below for other expenses reviewed by the CODM. The CODM uses this information to assess current and/or future performance expectations, and the result of this assessment may be a reallocation of financial and/or non-financial resources among the reportable segments.
The following table shows selected information from the Condensed Consolidated Interim Statements of Operations relating to the Company’s segments (in thousands):
| Oaxaca, |
| Michigan, |
| Corporate |
| Total | |||||
For the three months ended March 31, 2025 | ||||||||||||
Sales, net | $ | | $ | - | $ | - | $ | | ||||
Production costs | | - | - | | ||||||||
Depreciation and amortization | | | | | ||||||||
Reclamation and remediation | | - | - | | ||||||||
Mine gross loss | ( | ( | ( | ( | ||||||||
Exploration expense | | | - | | ||||||||
G&A expenses, including Stock-based compensation | - | - | | | ||||||||
Other segment items (1) | | | ( | | ||||||||
Loss before income taxes | ( | ( | ( | ( | ||||||||
Income tax provision | | |||||||||||
Net loss | $ | ( | ||||||||||
Expenditures for long-lived assets | $ | | $ | - | $ | - | $ | | ||||
| Oaxaca, |
| Michigan, |
| Corporate |
| Total | |||||
Restated | Restated | Restated | Restated | |||||||||
For the three months ended March 31, 2024 | ||||||||||||
Sales, net | $ | | $ | - | $ | - | $ | | ||||
Production costs | | - | - | | ||||||||
Depreciation and amortization | | | | | ||||||||
Reclamation and remediation | | - | - | | ||||||||
Mine gross loss | ( | ( | ( | ( | ||||||||
Exploration expense | | | - | | ||||||||
G&A expenses, including Stock-based compensation | - | - | | | ||||||||
Other segment items (1) | | | ( | | ||||||||
Loss before income taxes | ( | ( | ( | ( | ||||||||
Income tax benefit | ( | |||||||||||
Net loss | ( | |||||||||||
Expenditures for long-lived assets | $ | | $ | - | $ | - | $ | |
(1) | Please see Note 19—Other Expense, net in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional information. |
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
28
The following table shows selected information from the Condensed Consolidated Interim Balance Sheets relating to the Company’s segments (in thousands):
| Oaxaca, |
| Michigan, |
| Corporate |
| Total | |||||
As of March 31, 2025 | ||||||||||||
Total current assets | $ | | $ | | $ | | $ | | ||||
Total non-current assets (1) | | | | | ||||||||
Total assets | $ | | $ | | $ | | $ | | ||||
As of December 31, 2024 | ||||||||||||
Total current assets | $ | | $ | | $ | | $ | | ||||
Total non-current assets (1) | | | | | ||||||||
Total assets | $ | | $ | | $ | | $ | |
(1) | As of March 31, 2025, the total non-current assets included capital investments of $ |
24. Subsequent Events
Subsequent to the end of the first quarter, through May 8, 2025, an aggregate of
On May 7, 2025, the Company received the previously disclosed tax refund of
Gold Resource Corporation—Condensed Consolidated Interim Financial Statements and Notes (Unaudited)
29
ITEM 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations
The following discussion summarizes the results of operations of Gold Resource Corporation and its subsidiaries (“we,” “our,” “us,” or the “Company”) for the three months ended March 31, 2025 and compares those results with the three months ended March 31, 2024. It also analyzes the Company’s financial condition as of March 31, 2025, and compares it to the financial condition as of December 31, 2024. This discussion should be read in conjunction with management’s discussion and analysis and the audited consolidated financial statements and footnotes contained in the 2024 Annual Report.
The discussion also presents certain non-GAAP financial measures that are important to management in its evaluation of the operating results, and which are used by management to compare the Company’s performance with what it perceives to be peer group mining companies and are relied on as part of management’s decision-making process. Management believes these measures may also be important to investors in evaluating the Company’s performance. For a detailed description of each of the non-GAAP financial measures and a reconciliation to GAAP financial measures, please see the discussion below under Non-GAAP Measures. Also see Forward-Looking Statements at the end of this Item 2 for important information regarding statements contained herein.
Overview
Gold Resource Corporation is a mining company that pursues gold, silver, and other metal projects that require reasonable capital requirements and could achieve high returns. DDGM is the Company’s cornerstone asset comprised of six contiguous land parcels. The Company’s focus is unlocking the significant upside potential of DDGM through optimization of the current operations, growing the existing resource by investing in exploration drilling, and identifying new opportunities near existing infrastructure. The primary mineral production comes from the Arista and Switchback underground mining areas. This mine and processing facilities can produce gold and silver doré as well as concentrates of copper, lead, and zinc.
The Back Forty Project, when developed, is expected to produce gold and silver doré and concentrates of copper and zinc bearing gold and silver. Optimization work related to metallurgy and the economic model was completed during the third quarter of 2023 and the Company filed the Back Forty Project Technical Report Summary (S-K 1300) on October 26, 2023. Results of the work indicate a more robust economic project with no planned impacts to wetlands that is more protective of the environment, which should facilitate a successful mine permitting process. The Company’s Board of Directors continues to evaluate its options with respect to unlocking the value of the Back Forty development project.
Gold Resource Corporation
30
Ground Support Inspection | DDGM continued to face a number of production challenges during the first quarter of 2025. Equipment availability issues, stemming from aging machinery and a lack of spare parts, significantly impacted operational efficiency. This inefficiency contributed to a shortage of production areas and reduced production capacity. To address these issues, the replacement of outdated equipment is necessary. The maintenance and engineering teams are actively implementing action plans to improve the readiness of existing equipment where possible. The Company is seeking additional capital to update some of its critical mining fleet and fund development. During the first quarter of 2025, a total of 531 meters of mine development was completed to access the southeast area of the Three Sisters vein system at two levels. Initial crosscuts confirmed wide vein widths and high grades. An intensive infill drilling campaign is underway to assist with the reinterpretation of vein structures in this area, finalize the block model and update the mine plan. Unfortunately, in January 2025 DDGM incurred its first registered lost time accident in over a year when an employee was working at heights at the process plant. The operations team continues to prioritize safety, efficiency, and continuous improvement to mitigate the impacts of current production challenges and position the operation for stronger outcomes in the coming quarters. |
DDGM Exploration Update
The Company’s portfolio of properties that make up DDGM are located along a 55-kilometer stretch of the San Jose structural corridor in the Sierra Madre Sur mountain range in the state of Oaxaca, Mexico. This northwest trending structural corridor spans three historic mining districts. Strategic planning and prioritization of regional surface exploration activities continue across several properties, aiming to define additional high-value drill targets and demonstrating the Company’s commitment to long-term investment in Oaxaca.
During the first quarter, underground diamond drilling proceeded as planned, focusing on grade control drilling from accessible areas within the Arista mine. Two diamond drill rigs were operating, one contract and one owned and operated by DDGM. Due to the lack of optimally located drill stations in the Three Sisters system for additional exploration drilling, grade control drilling remained a priority, utilizing access from the new development drifts created during the first quarter at Three Sisters. This drilling targeted veins in the upper levels of the newly defined Three Sisters system and deeper levels of the Marena, Santa Helena and Viridiana veins within the Arista system. This work has identified and defined short-term production opportunities.
The goal of the grade control drilling is to provide additional information and confidence in the detailed short-term geologic modeling, so that the mine plan can deliver ore from each area with the highest possible net smelter return (“NSR”) to the process plant. Although the Company believes the mine has potential to generate positive cash flow, based on current information from the new areas of the Three Sisters as well as other areas that have been discovered near the existing mining zones, the Company does not believe that the mine will generate sufficient free cash flow in the near term without the addition of these areas to the life-of-mine plan. Exploration potential continues to exist in all vein systems at the Arista mine, with a focus on the northwest extension of veins in the Arista system and the veins of the Three Sisters system, which remain open along strike to the northwest as well as up- and down-dip.
Gold Resource Corporation
31
Due to low equipment availability and cash flow shortages described previously, exploration drill programs at DDGM remained suspended during the first quarter of 2025. All exploration drilling results available to date were incorporated into the positive 2024 year-end resource update, which defined a significant increase in inferred, as well as measured and indicated Mineral Resources within the Three Sisters vein system and the Splay 31 vein of the Arista system. The inferred resources at Three Sisters is expected to be reduced based on the inconsistencies discovered in the geological model during the quarter, as described above. The completion of additional exploration development on Level 3 will facilitate continued infill and expansion drilling, aimed at extending the Three Sisters and Gloria vein systems along strike to the northwest and both up- and down-dip.
During the first quarter of 2025, a total of 24 grade control drill holes were completed, totaling 2,430 meters. The drilling was concentrated along Levels 3 and 4 in the southeast portion of the Three Sisters vein system, where positive initial results have validated vein widths and grades. Numerous high-quality exploration targets, both surface and underground at the Arista mine, have been defined, underscoring the area’s potential for future mineral resource expansion. However, additional capital expenditures in exploration in 2025 will remain dependent on improvements in cash flow.
Diamond drilling in the first quarter of 2025 targeted the following zones at the Arista mine:
o | Grade control drilling focused on validating the detailed geological model for the Three Sisters vein system, including the confirmation of vein widths and grades along the southeastern portion of the system. The drilling targeted the Sandy 1, Sandy 2 and Sadie 2 veins, from drill stations in new development drifts completed during this period on Levels 3 and 4 at Three Sisters. |
o | Grade control drilling was also completed from Level 25 targeting the Marena, Santa Helena, and Viridiana veins in the Arista vein system, testing near-term production opportunities not previously realized within the mine. |
o | The definition of these zones allows for improved mining planning and increased flexibility in scheduling ore production from these areas. |
Hole No. 525011: Sadie 1 vein (62.29 – 67.34 m; 5.05 m). Three Sisters System Q1 2025. 4.97 m estimated true width at 13.92 g/t AuEq of $817/t NSR (3.64 g/t Au, 116 870 g/t Ag, 0.23% Cu, 0.37% Pb, 0.86% Zn) |
Gold Resource Corporation
32
During the first quarter of 2025, regional exploration efforts focused on evaluating and prioritizing advanced stage projects along the 55-kilometer trend of the San Jose structural corridor. These projects include Alta Gracia, Margaritas, Chamizo, El Rey, and Jabali, within concessions controlled by DDGM (see map below). Additionally, prospects near the Arista mine are being re-evaluated for their near-term potential with the goal of defining priority near-mine drill targets.
Regional Geologic Map Showing Advanced Project and Prospect Locations and Exploration Concessions Controlled by Don David Gold Mine
Gold Resource Corporation
33
Results of Operations
Don David Gold Mine
Mine activities during the first quarter of 2025 included development and ore extraction from the Arista mine.
The following table summarizes certain production statistics about DDGM for the periods indicated:
For the three months ended March 31, | ||||||
| 2025 |
| 2024 | |||
Arista Mine | ||||||
Milled | ||||||
Tonnes Milled | 56,906 | 98,889 | ||||
Grade | ||||||
Average Gold Grade (g/t) | 0.70 | 1.89 | ||||
Average Silver Grade (g/t) | 169 | 88 | ||||
Average Copper Grade (%) | 0.18 | 0.37 | ||||
Average Lead Grade (%) | 0.72 | 1.25 | ||||
Average Zinc Grade (%) | 1.68 | 2.82 | ||||
Recoveries | ||||||
Average Gold Recovery (%) | 70.6 | 79.3 | ||||
Average Silver Recovery (%) | 83.3 | 90.3 | ||||
Average Copper Recovery (%) | 53.5 | 76.0 | ||||
Average Lead Recovery (%) | 66.3 | 65.7 | ||||
Average Zinc Recovery (%) | 73.2 | 82.7 | ||||
Combined | ||||||
Tonnes Milled (1) | 56,906 | 98,889 | ||||
Tonnes Milled per Day (2) | 1,094 | 1,328 | ||||
Metal production | ||||||
Gold (ozs.) | 903 | 4,757 | ||||
Silver (ozs.) | 257,285 | 251,707 | ||||
Copper (tonnes) | 54 | 280 | ||||
Lead (tonnes) | 272 | 812 | ||||
Zinc (tonnes) | 699 | 2,310 | ||||
Metal produced and sold | ||||||
Gold (ozs.) | 859 | 3,557 | ||||
Silver (ozs.) | 230,320 | 216,535 | ||||
Copper (tonnes) | 50 | 264 | ||||
Lead (tonnes) | 277 | 667 | ||||
Zinc (tonnes) | 617 | 1,682 | ||||
Percentage payable metal (3) | ||||||
Gold (%) | 95 | 75 | ||||
Silver (%) | 90 | 86 | ||||
Copper (%) | 93 | 94 | ||||
Lead (%) | 102 | 82 | ||||
Zinc (%) | 88 | 73 |
(1) | Based on actual days the mill operated during the period. |
(2) | The difference between what the Company reports as “ounces/tonnes produced” and “payable ounces/tonnes sold” is attributable to the difference between the quantities of metals contained in the concentrates the Company produces versus the portion of those metals actually paid for according to the terms of the Company’s sales contracts. Differences can also arise from inventory changes incidental to shipping schedules, or variances in ore grades and recoveries, which impact the amounts of metals contained in concentrates produced and sold. |
(3) | The difference between what the Company reports as “ounces/tonnes produced” and “payable ounces/tonnes sold” is attributable to the difference between the quantities of metals contained in the concentrates it produces versus the portion of those metals actually paid for according to the terms of the sales contracts. Differences can also arise from inventory changes incidental to shipping schedules, or variances in ore grades and recoveries, which impact the amount of metals contained in concentrates produced and sold. |
Gold Resource Corporation
34
First quarter 2025 compared to first quarter 2024
Production
During the three months ended March 31, 2025, total tonnes milled of 56,906 were 42% lower than in the same period in 2024. While metal production for gold, copper, lead, and zinc decreased by 81%, 81%, 67%, and 70%, respectively, silver increased by 2% during the three months ended March 31, 2025, as compared to the same period last year. Although the lower tonnes processed and lower metal grades for all metals, with the exception of silver, were expected in the 2025 mine plan, the first quarter production was significantly impacted by the limited availability of critical mining equipment and the lack of production headings faces.
Grades & Recoveries
During the three months ended March 31, 2025, all of the ore processed came from the Arista mine with an average gold grade of 0.70 g/t and silver grade of 169 g/t, compared to an average gold grade of 1.89 g/t and silver grade of 88 g/t, respectively, for the same period in 2024. For the three months ending March 31, 2025, the average gold grade was 63% lower and the average silver grade was 92% higher when compared to the same period in 2024. This reduction in grade is partly due to the additional dilution caused by mining narrower veins, as scheduled in the first quarter. As shown in the Technical Report Summary for DDGM incorporated by reference in the 2024 Annual Report (the “Technical Report Summary”), the ore grades are generally expected to decline over time in line with the life of mine average shown in the estimates of mineral reserves (as defined by subpart 1300 of Regulation S-K, “Mineral Reserve”) and mineral resources (as defined by subpart 1300 of Regulation S-K, “Mineral Resource”) tables contained therein (the “Mineral Reserve and Mineral Resource Tables”). As grades decline, recoveries are expected to decline as well. The Company’s base metals average grades during the three months ended March 31, 2025 were 0.18% for copper, 0.72% for lead, and 1.68% for zinc. The copper, lead, and zinc grades were lower by 51%, 42%, and 40%, respectively, as compared to same period in 2024.
Gold and silver recoveries for the three months ended March 31, 2025 were 70.6% and 83.3%, respectively, reflecting an 11% decrease for gold and an 8% decrease for silver over the same period in 2024. Copper, lead, and zinc recoveries for the three months ended March 31, 2025 were 53.5%, 66.3%, and 73.2%, respectively. While recoveries for copper and zinc declined by 30% and 11%, respectively, in the three months ended March 31, 2025 when compared to the same period in 2024, lead increased by 1%.
Gold Resource Corporation
35
Sales Statistics
The following table summarizes certain sales statistics about DDGM operations for the periods indicated:
For the three months ended March 31, | ||||||
| 2025 |
| 2024 | |||
Net sales (in thousands) | ||||||
Gold | $ | 2,485 | $ | 7,423 | ||
Silver | 7,452 | 5,069 | ||||
Copper | 472 | 2,241 | ||||
Lead | 539 | 1,364 | ||||
Zinc | 1,751 | 4,122 | ||||
Less: Treatment and refining charges | (447) | (1,583) | ||||
Realized and unrealized gain - embedded derivative, net | 102 | 66 | ||||
Total sales, net | $ | 12,354 | $ | 18,702 | ||
Metal produced and sold | ||||||
Gold (ozs.) | 859 | 3,557 | ||||
Silver (ozs.) | 230,320 | 216,535 | ||||
Copper (tonnes) | 50 | 264 | ||||
Lead (tonnes) | 277 | 667 | ||||
Zinc (tonnes) | 617 | 1,682 | ||||
Average metal prices realized (1) | ||||||
Gold ($ per oz.) | $ | 2,956 | $ | 2,094 | ||
Silver ($ per oz.) | $ | 32.54 | $ | 23.29 | ||
Copper ($ per tonne) | $ | 9,656 | $ | 8,546 | ||
Lead ($ per tonne) | $ | 1,950 | $ | 1,977 | ||
Zinc ($ per tonne) | $ | 2,710 | $ | 2,483 | ||
Gold equivalent ounces sold | ||||||
Gold Ounces | 859 | 3,557 | ||||
Gold Equivalent Ounces from Silver | 2,535 | 2,408 | ||||
Total AuEq oz | 3,394 | 5,965 |
(1) | Average metal prices realized vary from the market metal prices due to final settlement adjustments from the Company’s provisional invoices when they are settled. The Company’s average metal prices realized will therefore differ from the average market metal prices in most cases. |
First quarter 2025 compared to first quarter 2024
Besides the expected lower tonnes mined and changes in metal grades and recoveries for the three months ended March 31, 2025, as compared to the same period in 2024, the key drivers of the production and financial results relate to the issues the Company faced especially in the first quarter of 2025, including the issues with equipment availability due to the age and condition of some of the critical mining equipment, the decreasing cash and working capital affecting the Company’s sales and production.
Metal Sold
During the three months ended March 31, 2025, gold sales of 859 ounces, copper sales of 50 tonnes, lead sales of 277 tonnes, and zinc sales of 617 tonnes decreased by 76%, 81%, 58%, and 63%, respectively, compared to the same period in 2024. Silver sales of 230,320 ounces increased by 6% compared to the same period in 2024. The lower metal production was partially expected due to mine sequencing, but challenges with equipment availability and the lack of multiple faces to mine negatively affected the Company’s metal sales and production.
Average metal prices realized
During the three months ended March 31, 2025, the average metal prices were $2,956 per gold ounce, $32.54 per silver ounce, $9,656 per tonne for copper, $1,950 per tonne for lead, and $2,710 per tonne for zinc. Compared to the same
Gold Resource Corporation
36
period in 2024, the average metal price for gold and silver increased by 41% and 40%, respectively. The average metal price for copper and zinc also increased by 13% and 9%, respectively, while the average metal price for lead decreased by 1%.
Gold Resource Corporation
37
Financial Measures
The following table summarizes certain financial data of the Company for the periods indicated:
For the three months ended March 31, | ||||||
2025 |
| 2024 | ||||
Restated | ||||||
(in thousands) | ||||||
Doré and concentrate sales | $ | 12,699 | $ | 20,219 | ||
Less: Treatment and refining charges | (447) | (1,583) | ||||
Realized/unrealized derivatives, net | 102 | 66 | ||||
Sales, net | 12,354 | 18,702 | ||||
Total cost of sales | 13,806 | 20,871 | ||||
Mine gross loss | (1,452) | (2,169) | ||||
Other costs and expenses, including taxes | 6,867 | 3,508 | ||||
Net loss | $ | (8,319) | $ | (5,677) |
(1) | For a detailed description of each of the non-GAAP financial measures and a reconciliation to GAAP financial measures, please see the discussion below under Non-GAAP Measures. |
First quarter 2025 compared to first quarter 2024
Sales, net
Net sales of $12.4 million for DDGM for the three months ended March 31, 2025 decreased by $6.3 million, or 34%, when compared to the same period in 2024. The decrease in 2024 net sales is the result of decreased production volumes as outlined in the sales statistics table above. Additionally, treatment and refining charges during the three months ended March 31, 2025, decreased by 72% as a result of the decline in production in the first quarter of 2025 as compared to the production in the first quarter of 2024.
Total cost of sales
Total cost of sales of $13.8 million for the three months ended March 31, 2025 decreased by 34% from $20.9 million for the same period in 2024. The $7.1 million decrease was primarily related to a $5.4 million decrease in production cost and a $1.5 million decrease in depreciation expense. Production costs of $10.7 million for the three months ended March 31, 2025 are 34% lower than the production costs of $16.1 million for the same period in 2024.
Mine gross loss
For the three months ended March 31, 2025, the Company had a mine gross loss of $1.5 million, compared to a mine gross loss of $2.2 million for the three months ended March 31, 2024. Mine gross loss decrease by $0.7 million, or 32%, compared to the same period in 2024. The decrease in loss was primarily due to the $5.4 million, or 34% decrease in production costs and a $1.5 million, or 36% decrease in depreciation and amortization expenses due to the 42% lower tonnes milled in the first quarter of 2025, compared to the first quarter of 2024.
The mine gross profit or loss maintains a limited correlation to tonnes of ore processed; however, multiple factors will impact the net sales and operating costs figures contained within the mine gross profit or loss in comparison to the tonnes of ore processed. For example, concerning net sales, attributes of the tonnes of ore processed (including ore grade and processing recoveries) along with metal commodity prices can result in lower or higher sales. Mine operating costs include variable costs that maintain a correlation to the tonnes both mined and processed (i.e., equipment usage, reagents, inventory consumables, royalties etc.) and further include fixed costs which maintain a lower correlation to the tonnes of ore processed (i.e. payroll, utilities, insurance, mining concessions, etc.).
Gold Resource Corporation
38
The Company expects grades to vary from period to period based on the annual mine plan and based upon the potential for unplanned changes to the annual mine plan. Such unplanned changes, related to equipment availability and access limitations, were encountered by the Company in the first quarter of 2025. Based on the current Mineral Reserve estimate, the gold grades are expected to trend downwards over time, toward the average grade of 1.29 g/t (exclusive of silver, copper, lead, and zinc contained grades). However, as mine development progresses and infill drilling occurs, opportunities to access upgraded resources or refine mining methods and reduce dilution may have a favorable impact on future mined ore grades and updated Mineral Reserve estimates.
Net loss
For the three months ended March 31, 2025, the Company recorded a net loss of $8.3 million, compared to a net loss of $5.7 million during the same period in 2024. The $2.6 million increase in net loss is mainly attributable to the 34% decrease in net sales.
Other Costs and Expenses, Including Taxes
For the three months ended March 31, | ||||||
2025 |
| 2024 | ||||
Restated | ||||||
(in thousands) | ||||||
Other costs and expenses: | ||||||
General and administrative expenses | $ | 1,144 | $ | 955 | ||
Mexico exploration expenses | 281 | 899 | ||||
Michigan Back Forty Project expenses | 204 | 205 | ||||
Stock-based compensation | 400 | 219 | ||||
Other expense, net | 4,311 | 3,117 | ||||
Total other costs and expenses | 6,340 | 5,395 | ||||
Income tax provision (benefit) | 527 | (1,887) | ||||
Total other costs and expenses, including taxes | $ | 6,867 | $ | 3,508 |
First quarter 2025 compared to first quarter 2024
General and administrative expenses: For the three months ended March 31, 2025 and 2024, general and administrative expenses were $1.1 million and $1.0 million, respectively. The 10% increase is due to additional legal costs related to the registered direct offering and additional costs related to the 2023 and 2024 financial statement restatements.
Mexico Exploration expenses: For the three months ended March 31, 2025, exploration expenses in DDGM totaled $0.3 million, compared to $0.9 million for the same period in 2024. Exploration activities in Oaxaca, Mexico, decreased compared to the same period in 2024 primarily due to the reduction in expansion drilling and underground exploration development.
Michigan Back Forty Project expenses: For the three months ended March 31, 2025, costs for the Back Forty Project were $0.2 million, in line with the same period in 2024. The Company has not been actively progressing the project since the beginning of 2024.
Stock-based compensation: Stock-based compensation increased by $0.2 million for the three months ended March 31, 2025, compared to the same period in 2024 due to the increase in share price in 2025.
Other expense, net: For the three months ended March 31, 2025, the Company incurred $4.3 million of other expenses, an increase of $1.2 million from the same period in 2024. This increase is largely driven by a $1.0 million increase in the interest on the streaming liabilities and a $0.9 million loss from the sale of the Green Light Metal shares in 2025, offset by $0.4 million less expense due to the severance paid in 2024. Please see Note 19 - Other expense, net in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) for additional details.
Gold Resource Corporation
39
Income tax provision (benefit): For the three months ended March 31, 2025, income tax expense was $0.5 million, compared to a $1.9 million income tax benefit for the same period in 2024. The increase in income tax expense for the three months ended March 31, 2025 is primarily driven by the full valuation allowance.
Other Non-GAAP Financial Measures
Certain non-GAAP financial measures are discussed below. For a detailed description of each of these measures and a reconciliation to GAAP financial measures, please see the discussion under Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations—Non-GAAP Measures below.
For the three months ended March 31, | ||||||
2025 |
| 2024 | ||||
Other Non-GAAP Financial Measures: | (in thousands) | |||||
Total cash cost after co-product credits per AuEq oz sold (1) | $ | 2,494 | $ | 1,667 | ||
Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold (1) | $ | 3,252 | $ | 2,304 | ||
Total all-in cost after co-product credits per AuEq oz sold (1) | $ | 3,745 | $ | 2,489 |
(1) | For a detailed description of each of the non-GAAP financial measures and a reconciliation to GAAP financial measures, please see the discussion under Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations—Non-GAAP Measures below. |
First quarter 2025 compared to first quarter 2024
Total cash cost after co-product credits per AuEq oz sold: For the three months ended March 31, 2025, the total cash cost after co-product credits per AuEq oz sold is $2,494 compared to $1,667 for the same period in 2024. The increase in the total cash cost is due to the 65% lower co-product credits the Company received during the first quarter of 2025 and the 43% decrease in the total number of AuEq ounces sold, offset by a 72% decrease in total treatment and refining charges and a 34% decrease in production costs as a result of the decline in first quarter 2025 production as compared to first quarter 2024 production.
Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold: For the three months ended March 31, 2025, the total consolidated all-in sustaining cost after co-product credits per AuEq oz sold was $3,252 as compared to $2,304 for the same period in 2024. The increase directly relates to the higher cash costs per ounce discussed above.
Total all-in cost after co-product credits per AuEq oz sold: For the three months ended March 31, 2025, the total all-in cost after co-product credits per AuEq oz sold was $3,745 compared to $2,489 for the same period in 2024. The increase is due to the higher all-in sustaining costs discussed above.
Gold Resource Corporation
40
2025 Sustaining and Growth Investments Summary
For the three months ended March 31, 2025 | ||||||
2025 | 2024 | |||||
Sustaining Investments: | ||||||
Underground Development | $ | 468 | $ | 1,350 | ||
Other Sustaining Capital | 50 | 282 | ||||
Infill Drilling | 109 | 441 | ||||
Surface and Underground Exploration Development & Other | 6 | 2 | ||||
Subtotal of Sustaining Investments: | 633 | 2,075 | ||||
Growth Investments: | ||||||
DDGM growth: | ||||||
Surface Exploration / Other | 281 | 899 | ||||
Underground Exploration Development | 1,188 | - | ||||
Back Forty growth: | ||||||
Back Forty Project Optimization & Permitting | 204 | 205 | ||||
Subtotal of Growth Investments: | 1,673 | 1,104 | ||||
Total Capital and Exploration: | $ | 2,306 | $ | 3,179 |
The Company’s year-to-date investment in Mexico in 2025 totaled $1.8 million. The Company’s investment in Mexico is focused on favorably impacting its environment, social, and governance programs while creating operational efficiencies and sustainability.
Gold Resource Corporation
41
Underground and Exploration Development:
During the first quarter of 2025, mine development included the construction of ramps, access to different areas of the deposit, and ventilation shafts. No additional exploration development was completed during this period. Grade control drilling utilized existing infrastructure developed in previous years, along with drill stations located in the new development constructed during the first quarter accessing the Three Sisters vein system. As part of ongoing safety initiatives, the Company also invested in additional ground support and improved ventilation for the mine. However, due to the continued reduction in equipment availability and the resulting decrease in production and cash, the Company has not been able to maintain its projected timeline for development of future production zones.
Underground contract drill rig; Level 3 – Arista Mine – Three Sisters vein system.. |
Gold Resource Corporation
42
Non-GAAP Measures
Throughout this report, the Company has provided information prepared or calculated according to U.S. GAAP and have referenced certain non-GAAP performance measures that the Company believes will assist with understanding the performance of its business. These measures are based on precious metal gold equivalent ounces sold and include (i) cash cost after co-product credits per ounce and (ii) all-in sustaining cost after co-product credits (“AISC”) per ounce, and (iii) all-in cost after co-product credits per ounce. Because the non-GAAP performance measures do not have any standardized meaning prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies. Accordingly, these measures should not be considered in isolation or as a substitute for, measures of performance prepared in accordance with U.S. GAAP. These non-GAAP measures are not necessarily indicative of operating profit or cash flow from operations as determined under GAAP.
For financial reporting purposes, the Company reports the sale of base metals as part of its revenue. Revenue generated from the sale of base metals in the Company’s concentrates is considered a co-product of its gold and silver production for the purpose of calculating its total cash cost after co-product credits for DDGM. The Company periodically reviews its revenues to ensure that its reporting of primary products and co-products is appropriate. Because the Company considers copper, lead, and zinc to be co-products of its precious metal production, the value of these metals continues to be applied as a reduction to total cash costs in its calculation of total cash cost after co-product credits per precious metal gold equivalent ounce sold. Likewise, the Company believes identifying copper, lead, and zinc as co-product credits is appropriate due to their lower per unit economic value contribution compared to the precious metals and since gold and silver are the primary products it intends to produce.
Total cash cost after co-product credits is a measure developed by the Gold Institute to provide a uniform standard for industry comparison purposes, and it includes total cash cost before co-product credits, less co-product credits, or revenues earned from base metals.
AISC includes total cash cost after co-product credits plus other costs related to sustaining production, including allocated sustaining general and administrative expenses and sustaining capital expenditures. The Company determined sustaining capital expenditures as those capital expenditures that are necessary to maintain current production and execute the current mine plan. AISC is calculated based on the current guidance from the World Gold Council.
Total all-in cost after co-product credits includes total AISC as described above, plus other growth investments, including exploration expenses and non-sustaining capital expenditures.
Gold Resource Corporation
43
Reconciliations to U.S. GAAP
The table below present reconciliations between the most comparable GAAP measure of Total cost of sales to the non-GAAP measures of Cash cost after co-product credits, All-in sustaining cost after co-product credits for DDGM and for the Company, and All-in Cost after co-product credits for the three months ended March 31, 2025 and 2024:
Note | For the three months ended March 31, | ||||||
| 2025 |
| 2024 | ||||
Restated | |||||||
(in thousands, except oz and per AuEq oz sold) | |||||||
Total cost of sales (1) | $ | 13,806 | $ | 20,871 | |||
Less: Depreciation and amortization (1) | (2,704) | (4,210) | |||||
Less: Reclamation and remediation (1) | (394) | (553) | |||||
Refining charges for Doré sales | 5 | - | 6 | ||||
Treatment and refining charges for Concentrate sales | 5 | 447 | 1,577 | ||||
Co-product credits: | |||||||
Concentrate sales - Copper | 5 | (472) | (2,241) | ||||
Concentrate sales - Lead | 5 | (539) | (1,364) | ||||
Concentrate sales - Zinc | 5 | (1,751) | (4,122) | ||||
Realized gain for embedded derivatives - Copper | 21 | (9) | (12) | ||||
Realized loss for embedded derivatives - Lead | 21 | - | 44 | ||||
Realized loss (gain) for embedded derivatives - Zinc | 21 | 81 | (54) | ||||
Total cash cost after co-product credits | $ | 8,465 | $ | 9,942 | |||
Gold equivalent (AuEq) ounces sold (oz) |
| 3,394 | 5,965 | ||||
Total cash cost after co-product credits per AuEq oz sold | $ | 2,494 | $ | 1,667 | |||
Total cash cost after co-product credits from above | $ | 8,465 | $ | 9,942 | |||
Sustaining Investments - Capital: | |||||||
Underground Development (2) | 468 | 1,350 | |||||
Other Sustaining Capital (2) | 50 | 282 | |||||
Sustaining Investments - Capitalized Exploration: | |||||||
Infill Drilling (2) | 109 | 441 | |||||
Surface and Underground Exploration Development & Other (2) | 6 | 2 | |||||
Reclamation and remediation (1) | 394 | 553 | |||||
DDGM all-in sustaining cost after co-product credits | $ | 9,492 | $ | 12,570 | |||
AuEq ounces sold (oz) | 3,394 | 5,965 | |||||
DDGM all-in sustaining cost after co-product credits per AuEq oz sold | $ | 2,797 | $ | 2,107 | |||
DDGM all-in sustaining cost after co-product credits from above | $ | 9,492 | $ | 12,570 | |||
Corporate Sustaining Expenses: | |||||||
General and administrative expenses (1) | 1,144 | 955 | |||||
Stock-based compensation (1) | 400 | 219 | |||||
Consolidated all-in sustaining cost after co-product credits | $ | 11,036 | $ | 13,744 | |||
AuEq ounces sold (oz) | 3,394 | 5,965 | |||||
Total consolidated all-in sustaining cost after co-product credits per AuEq oz sold | $ | 3,252 | $ | 2,304 | |||
Consolidated all-in sustaining cost after co-product credits from above | $ | 11,036 | $ | 13,744 | |||
Underground Exploration Development (2) | 1,188 | - | |||||
Growth Investments - Exploration: | |||||||
Mexico exploration expenses (1) | 281 | 899 | |||||
Michigan Back Forty Project expenses (1) | 204 | 205 | |||||
Total all-in cost after co-product credits | $ | 12,709 | $ | 14,848 | |||
AuEq ounces sold (oz) | 3,394 | 5,965 | |||||
Total all-in cost after co-product credits per AuEq oz sold | $ | 3,745 | $ | 2,489 |
(1) | Refer to Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited): Condensed Consolidated Interim Statements of Operations. |
(2) | Refer to Item 2—Management’s Discussion and Analysis of Financial Condition and Results of Operations – 2024 Capital and Exploration Investment Summary and the previously filed Item 2—Management’s Discussion and Analysis of Financial Condition and Results of Operations – 2024 Capital and Exploration Investment Summary. |
Gold Resource Corporation
44
Trending Highlights
2024 | 2025 | |||||
Q1 | Q2 | Q3 | Q4 | Q1 | ||
Operating Data | ||||||
Total tonnes milled | 98,889 | 93,687 | 83,690 | 80,367 | 56,906 | |
Average Grade | ||||||
Gold (g/t) | 1.89 | 1.27 | 0.54 | 0.64 | 0.70 | |
Silver (g/t) | 88 | 102 | 83 | 94 | 169 | |
Copper (%) | 0.37 | 0.26 | 0.19 | 0.20 | 0.18 | |
Lead (%) | 1.25 | 1.00 | 1.01 | 1.12 | 0.72 | |
Zinc (%) | 2.82 | 2.59 | 2.63 | 2.73 | 1.68 | |
Metal production (before payable metal deductions) | ||||||
Gold (ozs.) | 4,757 | 2,947 | 944 | 1,258 | 903 | |
Silver (ozs.) | 251,707 | 263,023 | 194,525 | 210,581 | 257,285 | |
Copper (tonnes) | 280 | 181 | 93 | 88 | 54 | |
Lead (tonnes) | 812 | 616 | 576 | 678 | 272 | |
Zinc (tonnes) | 2,310 | 2,020 | 1,741 | 1,734 | 699 | |
Metal produced and sold | ||||||
Gold (ozs.) | 3,557 | 2,724 | 1,357 | 960 | 859 | |
Silver (ozs.) | 216,535 | 234,560 | 181,434 | 184,804 | 230,320 | |
Copper (tonnes) | 264 | 197 | 98 | 82 | 50 | |
Lead (tonnes) | 667 | 491 | 467 | 548 | 277 | |
Zinc (tonnes) | 1,682 | 1,771 | 1,473 | 1,360 | 617 | |
Average metal prices realized | ||||||
Gold ($ per oz.) | $ 2,094 | $ 2,465 | $ 2,561 | $ 2,706 | $ 2,956 | |
Silver ($ per oz.) | $ 23.29 | $ 30.49 | $ 30.61 | $ 31.11 | $ 32.54 | |
Copper ($ per tonne) | $ 8,546 | $ 10,428 | $ 8,832 | $ 8,969 | $ 9,656 | |
Lead ($ per tonne) | $ 1,977 | $ 2,235 | $ 2,065 | $ 1,897 | $ 1,950 | |
Zinc ($ per tonne) | $ 2,483 | $ 2,871 | $ 2,854 | $ 3,062 | $ 2,710 | |
Gold equivalent ounces sold | ||||||
Gold Ounces | 3,557 | 2,724 | 1,357 | 960 | 859 | |
Gold Equivalent Ounces from Silver | 2,408 | 2,901 | 2,169 | 2,125 | 2,535 | |
Total AuEq oz | 5,965 | 5,625 | 3,526 | 3,085 | 3,394 |
Gold Resource Corporation
45
Liquidity and Capital Resources
As of March 31, 2025, working capital was $6.2 million, consisting of current assets of $20.2 million and current liabilities of $14.0 million. This represents a $4.1 million, or 195%, increase from the working capital balance of $2.1 million as of December 31, 2024. The factors influencing the increase in the Company’s working capital were the cash used in investing activities of $1.3 million and the $0.8 million cash outflows from operating activities, offset by $5.5 million cash inflows from financing activities due to sales through the ATM agreement, as reported in the Condensed Consolidated Interim Statements of Cash Flows. The Company’s working capital balance fluctuates as it uses cash to fund its operations, financing, and investing activities, including exploration, mine development, and income taxes.
Long-term liabilities assumed with the Aquila acquisition, capital requirements to develop the Back Forty Project, and potential project financing may have an impact on liquidity in the long term. These long-term liabilities are contingent upon the approval of the Back Forty Project by the Company’s Board of Directors and securing project financing. Project financing requirements will not be determined until the Company’s Board of Directors approves a decision to proceed on the Project. The Company’s Board of Directors continues to evaluate options that could lead to the development of the Project.
Cash and cash equivalents as of March 31, 2025 increased to $4.9 million from $1.6 million as of December 31, 2024, a net increase in cash of $3.3 million. The increase is primarily due to the $5.5 million cash inflow from financing activities due to the ATM sales and the proceeds from the registered direct offering, partially offset by $1.3 million in cash used in investing activities and $0.8 million in cash used in operating activities.
Of the $4.9 million cash balance as of March 31, 2025, $2.7 million was held in foreign subsidiaries, primarily held in U.S. dollar denominated accounts, with the remainder in foreign currencies readily convertible to U.S. dollars. DDGM’s primary source of liquidity is the sale of concentrates. DDGM has historically been self-sustaining and has been a source of cash for U.S. operations and projects. However, as a result of recent challenges encountered in mining and processing at DDGM, the Company is not currently generating positive cash flow from the Company’s mining operations.
Net cash used in operating activities for the three months ended March 31, 2025, was $0.8 million, compared to the $1.5 million net cash provided by operating activities for the same period in 2024. The 153% decrease in net cash provided by operating activities is mainly attributable to the lower production and increased net loss in 2025.
Net cash used in investing activities of $1.3 million for the three months ended March 31, 2025 decreased from $2.0 million from the same period in 2024. The decrease is mainly attributed to planned reduction in investing activities to preserve cash. Investing activities in both 2025 and 2024 are mainly attributable to continued reinvestment in DDGM.
Net cash provided by financing activities for the three months ended March 31, 2025 was $5.5 million related to the ATM sales and the proceeds from the registered direct offering. Please see Note 15—Shareholders’ Equity in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) above for additional information.
While current macro risk factors, such as economic uncertainties and supply chain interruptions have not had a significant adverse impact on exploration plans, results of operations, financial position, and cash flows during the current fiscal year, future impacts are unknown at this time.
Tonnes and grade, with respect to the Company’s mining operations at DDGM, have declined during 2024 and are below budget, especially in the first quarter. There are several factors that caused these declines. The Company has encountered significant issues with equipment availability due to the age and condition of some of the critical mining equipment in use at the mine. Due to the continued challenges with equipment availability and the decreased cash due to prior production shortfalls, the Company has not been able to maintain its projected timeline for development of future production zones. As a result, the Company is currently mining only one face at a time in areas that are accessible. The current lack of other available production zones has placed additional pressure on the Company’s ability to achieve its production estimates, as any problems encountered at the current production zone cannot be offset by producing elsewhere in the mine. In addition, the mill continued to experience some mechanical issues that resulted in lower throughput and a
Gold Resource Corporation
46
production shortfall. To minimize the mechanical issues and return the mine to a cash positive position, capital is necessary to replace some of the mining fleet and upgrade the mill.
The Company believes that the mine has significant potential to generate positive cash flow based on the information to date from the new areas of the Three Sisters as well as other areas that have been discovered near the existing mining zones. In order to develop access and better define these new areas, an investment must be made in the equipment and mine plan. Without the addition of these areas to the life-of-mine plan, the Company does not believe that the mine will generate sufficient free cash flow in the near term.
The Company’s inability to achieve its production estimates and lack of adequate liquidity has created substantial doubt about its ability to continue as a going concern. The Company previously announced that it would require approximately $7.0 million to obtain additional mining equipment and for mill upgrades. Management is currently looking to reduce the amount necessary for mining equipment purchases by purchasing good used equipment and using a third-party contractor that will provide its own equipment. The Company also expects to require approximately $8.0 million in working capital over the next 12 months in order to fund the initial development to access the Three Sisters and Splay 31 systems, although not all of this capital will be required immediately. Due to the early 2025 production challenges described above, the Company does not believe that the mine will generate sufficient cash flow to fund these improvements.
The Company raised $2.5 million through a registered direct offering in January 2025. Further, in February 2025, the Company sold its interest in Green Light Metals for approximately $0.9 million. Year-to-date 2025, the Company has raised $8.6 million, after deducting the agent’s commissions and other expenses, through its ATM Program and intends to utilize it further to raise capital, as required, throughout the year. Additionally, on May 7, 2025, the Company received the previously disclosed tax refund of 76 million pesos from the overpayment of Mexico taxes by DDGM in 2023, plus an inflation adjustment, for a total of 79.6 million pesos (approximately $4.0 million). The Company continues to evaluate various financing options to fund its working capital needs for the next 12 months.
If the Company is unable to obtain additional capital and successfully develop the new mining areas, the continued operation of the mine may not be possible beyond the third quarter of 2025. If continued operation of the mine is not possible, the Company may be compelled to place the mine on “care and maintenance” status, which would likely trigger significant severance and other costs, which the Company may not be able to pay.
Accounting Developments
For a discussion of recently adopted and recently issued accounting pronouncements, please see Note 2—New Accounting Pronouncements in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) above.
Forward-Looking Statements
This report contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. The Company uses the words “anticipate,” “continue,” “likely,” “estimate,” “expect,” “may,” “could,” “will,” “project,” “should,” “believe,” and similar expressions (including negative and grammatical variations) to identify forward looking statements. Such forward-looking statements include, without limitation, statements regarding:
● | The Company’s ability to satisfy its financial and contractual obligations and other potential cash requirements over the next twelve months; |
● | The Company’s anticipated near-term capital requirements and potential sources of capital; |
● | Expectations regarding 2025 general and administrative costs; |
● | The Company’s expectations regarding whether dividends will be paid in the future; |
● | Compliance with existing legal and regulatory requirements, including future asset reclamation costs; |
● | The Company’s strategy for significant future investment in Oaxaca, Mexico, and in Michigan, USA, for development and exploration activities; |
Gold Resource Corporation
47
● | Expectations regarding capital investment, exploration spending, and general and administrative costs, including the Company’s near-term estimates for the cost of additional mining equipment, mill upgrades, and working capital; |
● | The Company’s expectations regarding future grades and recoveries from mining at DDGM; and its expectations regarding its ability to generate positive cash flow from future production at DDGM; |
● | Future exploration plans at DDGM, including vein systems targeted for future exploration activity; |
● | Estimates of Mineral Resources and Mineral Reserves; |
● | The sufficiency of the Company’s water rights; |
● | The Company’s expectation for the outcome of the 2015 DDGM tax audit; |
● | Expectations regarding 2025 DDGM and Back Forty capital investment; and |
● | The expected timing and success of the Back Forty Project with respect to permitting, detailed engineering, and project financing. |
Forward-looking statements are neither historical facts nor assurances of future performance. Rather, they are based only on the Company’s current beliefs, expectations, and assumptions regarding the future of its business, future plans and strategies, projections, anticipated events and trends, the economy, and other future conditions. Because forward-looking statements relate to the future, they are subject to inherent uncertainties, risks, and changes in circumstances that are difficult to predict, and many of which are outside of the Company’s control. The Company’s actual results and financial condition may differ materially from those indicated in the forward-looking statements. Therefore, you should not rely on any of these forward-looking statements. Important factors that could cause the Company’s actual results and financial condition to differ materially from those indicated in the forward-looking statements include, among others, the following:
● | Whether the Company is able to raise the necessary capital required to continue its business on terms acceptable to it or at all; |
● | The possibility of unforeseen production or processing challenges at DDGM, such as mechanical breakdowns, staffing shortages, weather events, unexpected decreases in grade, lower than anticipated production at existing mining faces, or inability or delays in the access and development of new mining faces; |
● | Commodity price fluctuations; |
● | Mine protests and work stoppages; |
● | Rock formations, faults and fractures, water flow and possible CO2 gas exhalation, or other unanticipated geological challenges; |
● | Unexpected changes in business and economic conditions, including supply chain challenges, the rate of inflation, and their impact on operating and capital costs; |
● | Changes in interest rates and currency exchange rates; |
● | Adverse technological changes and cybersecurity threats; |
● | Unanticipated increases in the Company’s operating costs and other costs of doing business; |
● | Access to land and availability of materials, equipment, supplies, labor and supervision, power, and water; |
● | Results of current and future feasibility studies; |
● | Interpretation of drill hole results and the geology, grade, and continuity of mineralization; |
● | Litigation by private parties or regulatory action by governmental entities; |
● | Acts of God, such as excessively wet weather, floods, earthquakes, and any other natural disasters; |
● | Changes in investor perception of the Company and/or the mining industry; |
● | The inherent uncertainty of Mineral Resources and Mineral Reserves estimates; |
● | The Company’s internal controls over financial reporting, including its ability to remedy the identified material weakness as well as any potential future material weaknesses; and |
● | Such other factors are discussed below under Item 1A—Risk Factors in Part II—Other Information, and under Risk Factors in the 2024 Annual Report. |
Many of these factors are beyond the Company’s ability to control or predict. Although the Company believes that the expectations reflected in its forward-looking statements are based on reasonable assumptions, such expectations may prove to be materially incorrect due to known and unknown risks and uncertainties. You should not unduly rely on any of the Company’s forward-looking statements. These statements speak only as of the date of this annual report on Form 10-
Gold Resource Corporation
48
K. Except as required by law, the Company is not obliged to publicly release any revisions to these forward-looking statements to reflect future events or developments. All subsequent written and oral forward-looking statements attributable to the Company and persons acting on its behalf are qualified in their entirety by the cautionary statements contained in this section and elsewhere in this annual report on Form 10-Q.
ITEM 3: Quantitative and Qualitative Disclosures about Market Risk
The Company’s exposure to market risks includes, but is not limited to, the following risks: changes in commodity prices, foreign currency exchange rates, provisional sales contract risks, changes in interest rates, and equity price risks. Currently, the Company does not use derivative financial instruments as part of an overall strategy to manage market risk. However, the Company may consider such arrangements in the future as it evaluates its business and financial strategy.
Commodity Price Risk
The results of the Company’s operations, cash flows, and financial condition largely depend upon the market prices of gold, silver, copper, lead, and zinc. Metal prices fluctuate widely and are affected by numerous factors beyond the Company’s control. The level of interest rates, the rate of inflation, government fiscal and monetary policy, the stability of exchange rates, and the world supply of and demand for gold, silver, and other metals, among other factors, can all cause significant fluctuations in commodity prices. Such external economic factors are, in turn, influenced by changes in international investment patterns, monetary systems, and political developments. The metal price markets have fluctuated widely in recent years, and future price declines could cause a mineral project to become uneconomic, thereby having a material adverse effect on the Company’s business and financial condition. Currently, the Company is not unitizing derivative contracts to protect the selling price for gold, silver, copper, lead, or zinc. The Company may, in the future, more actively manage its exposure through additional derivative contracts, although the Company has no intention of doing so in the near term.
In addition to materially adversely affecting the Company’s reserve estimates, results of operations and/or its financial condition, declining gold and silver prices could require a reassessment of the feasibility of a project. Even if a project is ultimately determined to be economically viable, the need to conduct such a reassessment may cause delays in the implementation of a project.
Foreign Currency Risk
The Company’s foreign operation sells its gold, silver, copper, lead, and zinc production based on U.S. dollar metal prices. Fluctuations in foreign currency exchange rates do not have a material impact on the Company’s revenue since gold, silver, copper, lead, and zinc are sold worldwide in U.S. dollars.
Foreign currency exchange rate fluctuations can increase or decrease the Company’s costs to the extent that it pays costs in currencies other than the U.S. Dollar. The Company is primarily impacted by Mexican peso rate changes relative to the U.S. Dollar, as the Company incurs some costs in the Mexican peso. When the value of the peso rises in relation to the U.S. Dollar, some of the Company’s costs in Mexico may increase, thus materially adversely affecting the Company’s operating results. Alternatively, when the value of the peso drops in relation to the U.S. Dollar, peso-denominated costs in Mexico will decrease in U.S. Dollar terms. Future fluctuations may give rise to foreign currency exposure, which may affect the Company’s financial results. Approximately 50% to 60% of expenses are paid in currencies other than the U.S. dollar.
The Company has not utilized market-risk sensitive instruments to manage its exposure to foreign currency exchange rates. However, the Company may, in the future, actively manage its exposure to foreign currency exchange rate risk.
Gold Resource Corporation
49
Provisional Sales Contract Risk
The Company enters into concentrate sales contracts, which, in general, provide for a provisional payment to the Company based upon provisional assays and prices. The provisionally priced sales contracts contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates determined at the quoted metal prices at the time of shipment delivery to the customer. The embedded derivative, which does not qualify for hedge accounting, is adjusted to market through revenue each period prior to settlement. Changes in the prices of metals between the shipment delivery and the final settlement date will result in adjustments to revenues related to the sales of concentrate previously recorded upon shipment delivery. Please see Note 15—Derivatives in Item 1—Condensed Consolidated Interim Financial Statements and Notes (unaudited) above for additional information.
Interest Rate Risk
The Company considers its interest rate risk exposure to be insignificant at this time, as the Company’s interest rate is related and embedded in immaterial payments for office leases.
Equity Price Risk
The Company has, in the past, and may in the future, seek to acquire additional funding through the sale of common stock and other equity. The price of the Company’s common stock has been volatile in the past and may also be volatile in the future. As a result, there is a risk that the Company may not be able to sell its common stock at an acceptable price should the need for new equity funding arise.
ITEM 4: Controls and Procedures
Evaluation of Disclosure Controls and Procedures
The Company’s disclosure controls and procedures are designed to ensure that information required to be disclosed in the reports that the Company files under the Securities Exchange Act of 1934, as amended (the “Exchange Act”), is recorded, processed, summarized, and reported within the time periods specified in the rules and forms of the Securities and Exchange Commission, and that such information is accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure. The Chief Executive Officer and the Chief Financial Officer, with assistance from management, have evaluated the effectiveness of disclosure controls and procedures as of March 31, 2025. Based on that evaluation, the Chief Executive Officer and the Chief Financial Officer have concluded that the disclosure controls and procedures were not effective as of March 31, 2025 as a result of a material weakness in internal control over financial reporting described below.
As previously reported in the Company’s Annual Report on Form 10-K for the year ended December 31, 2024, the Company has identified the following material weakness in internal control over financial reporting:
● | The Company did not have adequate policies and procedures to maintain effective internal control over the accounting treatment related to complex areas. |
Gold Resource Corporation
50
Remediation Plan
The Company is in the process of implementing the following measures designed to improve its internal control over financial reporting and to remediate the deficiencies that led to the material weakness, including designing and implementing new controls activities, and enhancing existing control activities:
● | The Company will continue to evaluate and analyze in consultation with outside third-party accounting experts on non-routine, unusual, or complex transactions that are subject to technical accounting standards and significant judgement or differences in interpretation, in reaching technical accounting conclusions. |
● | The Company will subject its technical accounting conclusions to various quality control reviews prior to finalization for non-routine, unusual, or complex transactions that are subject to significant judgment or differences in interpretation. |
The Company has begun to remediate the material weakness and will continue to remediate the matter as efficiently and effectively as possible. However, management will not be able to conclude that it has remediated the material weakness until the applicable controls are fully implemented, operate for a sufficient period of time, and management has concluded, through formal testing, that these controls are operating effectively. The Company will continue to monitor the design and effectiveness of these and other processes, procedures, and controls and make any further changes management deems appropriate.
Changes in Internal Control over Financial Reporting
Except for the ongoing remediation efforts disclosed above, there have been no changes in internal control over financial reporting (as defined in Rule 13a-15(f) under the Exchange Act) that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting during the quarter ended March 31, 2025.
PART II – OTHER INFORMATION
ITEM 1: Legal Proceedings
In February 2020, a local Ejido community (who claim to be an indigenous community) filed an injunction against the Mexican federal government through which they demanded the cancellation of several DDGM concession titles. The federal government ordered a suspension to prevent work related to excavating, drilling, opening tunnels and exploiting the Mineral Resources on the surface and subsoil of the concessions named in the injunction. Presently, DDGM does not perform such works in the named concessions in lands of the indigenous community. The lawsuit filed in February 2020 has not progressed to a final ruling.
The Company knows of no other material, existing or pending legal proceedings against it, nor is it involved as a plaintiff in any material proceeding or pending litigation.
ITEM 1A: Risk Factors
Item 1A. Risk Factors of the 2024 Annual Report includes a discussion of the Company’s known material risk factors, other than risks that could apply to any issuer or offering. There have been no material changes in the Company’s risk factors from those described in the 2024 Annual Report.
ITEM 2: Unregistered Sales of Equity Securities and Use of Proceeds
None.
Gold Resource Corporation
51
ITEM 3: Defaults upon Senior Securities
None.
ITEM 4: Mine Safety Disclosures
While the Company owns an advanced exploration project in Michigan, USA, the project is not yet subject to the Mine Safety and Health Administration jurisdiction and therefore, the mine safety disclosure requirements are not applicable.
ITEM 5: Other Information
Rule 10b5-1 Trading Arrangements
During the three months ended March 31, 2025, no director or Section 16 officer of the Company
ITEM 6: Exhibits
The following exhibits are filed or furnished herewith or incorporated herein by reference:
Exhibit | Descriptions | |
31.1 | Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 for Allen Palmiere. | |
31.2 | Certification pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 for Chet Holyoak. | |
32* | ||
101 | The following items from the Quarterly Report on Form 10-Q for the quarter ended March 31, 2025 are furnished herewith, formatted in inline XBRL: (A) the following financial statements: (i) the Condensed Consolidated Interim Balance Sheets, (ii) the Condensed Consolidated Interim Statements of Operations, (iii) the Condensed Consolidated Interim Statements of Changes in Shareholders’ Equity, (iv) the Condensed Consolidated Interim Statements of Cash Flows, and (v) the Notes to the Condensed Consolidated Interim Financial Statements; and (B) Rule 10b5-1 Trading Arrangements | |
104 | Cover Page Interactive Data File (embedded within the XBRL document) |
* | This document is not being “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended, or otherwise subject to the liabilities of that Section. Registration Statements or other documents filed with the SEC shall not incorporate this exhibit by reference, except as otherwise expressly stated in such filing. |
Gold Resource Corporation
52
SIGNATURES
In accordance with Section 13 or 15(d) of the Exchange Act of 1934, the Company has caused this Report to be signed on its behalf by the undersigned, thereunto duly authorized.
GOLD RESOURCE CORPORATION | |||
Dated: May 12, 2025 | /s/ Allen Palmiere | ||
By: | Allen Palmiere, | ||
Chief Executive Officer, | |||
Dated: May 12, 2025 | /s/ Chet Holyoak | ||
By: | Chet Holyoak, | ||
Chief Financial Officer |
Gold Resource Corporation
53